A resource flow-based branch-and-bound algorithm to solve fuzzy stochastic resource-constrained project scheduling problem

In this paper, a resource flow-based branch-and-bound procedure is designed to solve the well-known resource-constrained project scheduling problem under the mixed uncertainty of fuzziness and randomness (FS-RCPSP). The objective is to minimize the expected makespan of the project subject to precede...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:Soft computing (Berlin, Germany) Ročník 25; číslo 22; s. 14315 - 14331
Hlavný autor: Alipouri, Yaghoub
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: Berlin/Heidelberg Springer Berlin Heidelberg 01.11.2021
Predmet:
ISSN:1432-7643, 1433-7479
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Abstract In this paper, a resource flow-based branch-and-bound procedure is designed to solve the well-known resource-constrained project scheduling problem under the mixed uncertainty of fuzziness and randomness (FS-RCPSP). The objective is to minimize the expected makespan of the project subject to precedence and resource constraints. The proposed branch-and-bound can be employed to obtain optimal solutions and also can be truncated in order to find promising near optimal solutions. The depth-first strategy is utilized for constructing the search tree, and earliest start time (EST) concept is adopted for selecting a node for further branching while traversing the tree down to the leaves. The performance of developed branch-and-bound is benchmarked against CPLEX and SADESP across an extensive set of 960 problems. The results returned by the proposed algorithm show experimentally its effectiveness to solve the FS-RCPSP.
AbstractList In this paper, a resource flow-based branch-and-bound procedure is designed to solve the well-known resource-constrained project scheduling problem under the mixed uncertainty of fuzziness and randomness (FS-RCPSP). The objective is to minimize the expected makespan of the project subject to precedence and resource constraints. The proposed branch-and-bound can be employed to obtain optimal solutions and also can be truncated in order to find promising near optimal solutions. The depth-first strategy is utilized for constructing the search tree, and earliest start time (EST) concept is adopted for selecting a node for further branching while traversing the tree down to the leaves. The performance of developed branch-and-bound is benchmarked against CPLEX and SADESP across an extensive set of 960 problems. The results returned by the proposed algorithm show experimentally its effectiveness to solve the FS-RCPSP.
Author Alipouri, Yaghoub
Author_xml – sequence: 1
  givenname: Yaghoub
  orcidid: 0000-0002-4934-5435
  surname: Alipouri
  fullname: Alipouri, Yaghoub
  email: y.alipouri@kntu.ac.ir
  organization: Department of Civil Engineering, K.N. Toosi University of Technology
BookMark eNp9kMtuwyAQRVGVSk3S_kBX_gFaMNiYZRT1JUXqpl1bA8axIwciwK2Sry9Jqi66yIoRuudq5szQxDprELqn5IESIh4DIQUhmOQUk5JygeUVmlLOGBZcyMlpzrEoObtBsxA2JCVFwabosMi8CW702mTt4L6xgmCaTHmwusNgG6zcaJsMhrXzfey2WXRZcMNXio-Hwz4L0ekOQuz1XxHWzoboobepaefdxuiYBd2ZZhx6uz5-qcFsb9F1C0Mwd7_vHH0-P30sX_Hq_eVtuVhhnUsaMQfIARqeCwKlpAIUzxVjhaBCtboFXrQKSCl5UzY0b1NYkgqkbEVTsUooNkfVuVd7F4I3ba37CLF39rjjUFNSHx3WZ4d1MlOfHNYyofk_dOf7Lfj9ZYidoZDCdm18vUlabDrxEvUDNuGJ8Q
CitedBy_id crossref_primary_10_1007_s00500_021_06399_5
crossref_primary_10_1016_j_cor_2025_107215
crossref_primary_10_3390_math11092086
crossref_primary_10_1007_s12204_024_2757_5
crossref_primary_10_1016_j_cor_2025_107054
Cites_doi 10.1016/j.ejor.2006.09.052
10.1007/s00170-008-1486-5
10.1007/s12351-017-0321-x
10.1080/21681015.2016.1140089
10.1016/S0377-2217(97)00335-4
10.1016/0022-247X(68)90078-4
10.1007/s10951-007-0011-2
10.4018/IJFSA.2016100101
10.4018/IJITPM.2020040101
10.1007/s12351-009-0073-3
10.1007/s00500-008-0337-5
10.1016/j.camwa.2005.04.015
10.1007/s10951-016-0505-x
10.1007/s10696-015-9210-x
10.1007/3-540-32388-0
10.1007/BF02941258
10.1016/j.omega.2016.09.009
10.1016/S0020-0255(02)00176-7
10.1007/s00500-015-1606-8
10.1016/j.ejor.2006.09.055
10.1016/S0377-2217(97)00348-2
10.1007/s001860000091
10.1002/int.21552
10.1080/01605682.2018.1441636
10.1016/j.ejor.2004.04.002
10.1007/s10951-007-0021-0
10.1007/s10951-009-0143-7
10.1080/00207543.2018.1504245
10.1007/s10700-004-5571-4
10.1080/07408170490447348
10.1007/s00500-018-3410-8
10.1016/0022-247X(86)90093-4
10.1016/S0165-0114(98)00022-0
10.1007/s10951-010-0173-1
10.1023/A:1010949931021
10.1016/S0377-2217(02)00758-0
10.1007/BF01545587
10.1057/jors.2012.69
10.1016/0165-0114(81)90032-4
10.1007/s10696-012-9147-2
10.1287/mnsc.41.10.1693
10.1007/978-94-009-3943-1
10.1007/978-3-7908-1781-2
10.1007/978-3-642-01510-6_8
10.1007/b101924
ContentType Journal Article
Copyright The Author(s), under exclusive licence to Springer-Verlag GmbH Germany, part of Springer Nature 2021
Copyright_xml – notice: The Author(s), under exclusive licence to Springer-Verlag GmbH Germany, part of Springer Nature 2021
DBID AAYXX
CITATION
DOI 10.1007/s00500-021-06147-9
DatabaseName CrossRef
DatabaseTitle CrossRef
DatabaseTitleList
DeliveryMethod fulltext_linktorsrc
Discipline Engineering
Computer Science
EISSN 1433-7479
EndPage 14331
ExternalDocumentID 10_1007_s00500_021_06147_9
GroupedDBID -5B
-5G
-BR
-EM
-Y2
-~C
.86
.VR
06D
0R~
0VY
1N0
1SB
203
29~
2J2
2JN
2JY
2KG
2LR
2P1
2VQ
2~H
30V
4.4
406
408
409
40D
40E
5VS
67Z
6NX
8TC
8UJ
95-
95.
95~
96X
AAAVM
AABHQ
AACDK
AAHNG
AAIAL
AAJBT
AAJKR
AANZL
AARHV
AARTL
AASML
AATNV
AATVU
AAUYE
AAWCG
AAYIU
AAYQN
AAYTO
AAYZH
ABAKF
ABBBX
ABBXA
ABDZT
ABECU
ABFTD
ABFTV
ABHLI
ABHQN
ABJNI
ABJOX
ABKCH
ABKTR
ABMNI
ABMQK
ABNWP
ABQBU
ABQSL
ABSXP
ABTEG
ABTHY
ABTKH
ABTMW
ABULA
ABWNU
ABXPI
ACAOD
ACBXY
ACDTI
ACGFS
ACHSB
ACHXU
ACKNC
ACMDZ
ACMLO
ACOKC
ACOMO
ACPIV
ACSNA
ACZOJ
ADHHG
ADHIR
ADINQ
ADKNI
ADKPE
ADRFC
ADTPH
ADURQ
ADYFF
ADZKW
AEBTG
AEFQL
AEGAL
AEGNC
AEJHL
AEJRE
AEKMD
AEMSY
AENEX
AEOHA
AEPYU
AESKC
AETLH
AEVLU
AEXYK
AFBBN
AFGCZ
AFKRA
AFLOW
AFQWF
AFWTZ
AFZKB
AGAYW
AGDGC
AGGDS
AGJBK
AGMZJ
AGQEE
AGQMX
AGRTI
AGWIL
AGWZB
AGYKE
AHAVH
AHBYD
AHSBF
AHYZX
AIAKS
AIGIU
AIIXL
AILAN
AITGF
AJBLW
AJRNO
AJZVZ
ALMA_UNASSIGNED_HOLDINGS
ALWAN
AMKLP
AMXSW
AMYLF
AMYQR
AOCGG
ARAPS
ARMRJ
ASPBG
AVWKF
AXYYD
AYJHY
AZFZN
B-.
BA0
BDATZ
BENPR
BGLVJ
BGNMA
BSONS
CAG
CCPQU
COF
CS3
CSCUP
DDRTE
DL5
DNIVK
DPUIP
DU5
EBLON
EBS
EIOEI
EJD
ESBYG
FEDTE
FERAY
FFXSO
FIGPU
FINBP
FNLPD
FRRFC
FSGXE
FWDCC
GGCAI
GGRSB
GJIRD
GNWQR
GQ6
GQ7
GQ8
GXS
H13
HCIFZ
HF~
HG5
HG6
HMJXF
HQYDN
HRMNR
HVGLF
HZ~
I09
IHE
IJ-
IKXTQ
IWAJR
IXC
IXD
IXE
IZIGR
IZQ
I~X
I~Z
J-C
J0Z
JBSCW
JCJTX
JZLTJ
K7-
KDC
KOV
LAS
LLZTM
M4Y
MA-
N2Q
NB0
NPVJJ
NQJWS
NU0
O9-
O93
O9J
OAM
P2P
P9P
PF0
PT4
PT5
QOS
R89
R9I
RIG
RNI
ROL
RPX
RSV
RZK
S16
S1Z
S27
S3B
SAP
SDH
SEG
SHX
SISQX
SJYHP
SNE
SNPRN
SNX
SOHCF
SOJ
SPISZ
SRMVM
SSLCW
STPWE
SZN
T13
TSG
TSK
TSV
TUC
U2A
UG4
UOJIU
UTJUX
UZXMN
VC2
VFIZW
W23
W48
WK8
YLTOR
Z45
Z5O
Z7R
Z7X
Z7Y
Z7Z
Z81
Z83
Z88
ZMTXR
AAPKM
AAYXX
ABBRH
ABDBE
ABFSG
ABRTQ
ACSTC
ADHKG
ADKFA
AEZWR
AFDZB
AFFHD
AFHIU
AFOHR
AGQPQ
AHPBZ
AHWEU
AIXLP
ATHPR
AYFIA
CITATION
PHGZM
PHGZT
PQGLB
ID FETCH-LOGICAL-c291t-4aa2aad4270a6917ab42b335717bfcfa45fba0694d6d12fa2a908a99f7d8387b3
IEDL.DBID RSV
ISICitedReferencesCount 6
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000687896200002&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 1432-7643
IngestDate Tue Nov 18 22:00:34 EST 2025
Sat Nov 29 03:36:11 EST 2025
Fri Feb 21 02:47:22 EST 2025
IsPeerReviewed true
IsScholarly true
Issue 22
Keywords Branch-and-bound
Resource-constrained project scheduling
Fuzzy stochastic durations
Resource flow
Language English
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c291t-4aa2aad4270a6917ab42b335717bfcfa45fba0694d6d12fa2a908a99f7d8387b3
ORCID 0000-0002-4934-5435
PageCount 17
ParticipantIDs crossref_citationtrail_10_1007_s00500_021_06147_9
crossref_primary_10_1007_s00500_021_06147_9
springer_journals_10_1007_s00500_021_06147_9
PublicationCentury 2000
PublicationDate 20211100
2021-11-00
PublicationDateYYYYMMDD 2021-11-01
PublicationDate_xml – month: 11
  year: 2021
  text: 20211100
PublicationDecade 2020
PublicationPlace Berlin/Heidelberg
PublicationPlace_xml – name: Berlin/Heidelberg
PublicationSubtitle A Fusion of Foundations, Methodologies and Applications
PublicationTitle Soft computing (Berlin, Germany)
PublicationTitleAbbrev Soft Comput
PublicationYear 2021
Publisher Springer Berlin Heidelberg
Publisher_xml – name: Springer Berlin Heidelberg
References Hirota (CR20) 1981; 5
Alcaraz, Maroto (CR1) 2001; 102
Sebt, Alipouri, Alipouri (CR39) 2013; 64
Alipouri, Sebt, Ardeshir, FazelZarandi (CR3) 2017; 20
Liu (CR31) 2002; 141
Damay, Quilliot, Sanlaville (CR14) 2007; 182
Ashtiani, Leus, Aryanezhad (CR7) 2011; 4
CR37
Lawler (CR28) 1976
CR30
Sprecher, Drexl (CR40) 1998; 107
Atli, Kahraman (CR8) 2012; 27
Sheng, Wang, Xiao (CR38) 2019; 23
Herroelen, Leus (CR19) 2005; 165
Zamani (CR46) 2011; 11
Davari, Demeulemeester (CR15) 2018; 57
Kolisch, Sprecher, Drexl (CR24) 1995; 41
Artigues, Leus, TallaNobibon (CR6) 2013; 25
Altintas, Azizoglu (CR4) 2020; 11
Xu, Zhang (CR43) 2012; 15
Zhu, Liu (CR47) 2005; 50
Mahdi Mobini, Rabbani, Amalnik (CR32) 2009; 13
Sprecher, Hartmann, Drexl (CR41) 1997; 19
Alipouri, Sebt, Ardeshir, Chan (CR2) 2019; 70
Rostami, Creemers, Leus (CR36) 2018; 21
Buckley, Feuring (CR100) 2000; 109
Ke, Liu (CR23) 2007; 183
Itoh, Ishii (CR22) 2005; 4
Pantouvakis, Manoliadis (CR34) 2006; 6
CR16
Nematian, Eshghi, Eshragh-Jahromi (CR33) 2010; 4
Zoulfaghari, Nematian, KananiNezhad (CR48) 2016; 5
Kumar, Vidyarthi (CR26) 2016; 20
Puri, Ralescu (CR35) 1986; 114
Artigues, Michelon, Reusser (CR5) 2003; 149
Ying, Lin, Lee (CR44) 2009; 41
Van de Vonder, Demeulemeester, Herroelen (CR42) 2007; 10
Leus, Herroelen (CR29) 2004; 36
Brucker, Knust, Schoo, Thiele (CR10) 1998; 107
Fang, Kolisch, Wang, Chundi (CR18) 2015; 27
Lambrechts, Demeulemeester, Herroelen (CR27) 2008; 11
Bruni, Di Puglia, Beraldi, Guerriero (CR11) 2017; 71
CR25
Zadeh (CR45) 1968; 23
Buckley (CR12) 2005
CR21
Dorndorf, Pesch, Phan-Huy (CR17) 2000; 52
Chen, Zhang (CR13) 2016; 33
Atli, Kahraman (CR9) 2013; 20
B Sheng (6147_CR38) 2019; 23
C Artigues (6147_CR6) 2013; 25
L Chen (6147_CR13) 2016; 33
O Lambrechts (6147_CR27) 2008; 11
O Atli (6147_CR8) 2012; 27
6147_CR21
K Hirota (6147_CR20) 1981; 5
6147_CR25
H Zoulfaghari (6147_CR48) 2016; 5
T Itoh (6147_CR22) 2005; 4
U Dorndorf (6147_CR17) 2000; 52
J Damay (6147_CR14) 2007; 182
J Nematian (6147_CR33) 2010; 4
S Rostami (6147_CR36) 2018; 21
M Davari (6147_CR15) 2018; 57
A Sprecher (6147_CR41) 1997; 19
S Van de Vonder (6147_CR42) 2007; 10
J Xu (6147_CR43) 2012; 15
6147_CR30
W Herroelen (6147_CR19) 2005; 165
H Ke (6147_CR23) 2007; 183
JP Pantouvakis (6147_CR34) 2006; 6
6147_CR37
JJ Buckley (6147_CR100) 2000; 109
JJ Buckley (6147_CR12) 2005
ME Bruni (6147_CR11) 2017; 71
Y Alipouri (6147_CR3) 2017; 20
R Kolisch (6147_CR24) 1995; 41
MH Sebt (6147_CR39) 2013; 64
A Sprecher (6147_CR40) 1998; 107
LA Zadeh (6147_CR45) 1968; 23
P Brucker (6147_CR10) 1998; 107
O Atli (6147_CR9) 2013; 20
B Liu (6147_CR31) 2002; 141
B Ashtiani (6147_CR7) 2011; 4
R Zamani (6147_CR46) 2011; 11
J Alcaraz (6147_CR1) 2001; 102
Y Alipouri (6147_CR2) 2019; 70
C Artigues (6147_CR5) 2003; 149
C Altintas (6147_CR4) 2020; 11
6147_CR16
ML Puri (6147_CR35) 1986; 114
Y Zhu (6147_CR47) 2005; 50
KC Ying (6147_CR44) 2009; 41
C Fang (6147_CR18) 2015; 27
EL Lawler (6147_CR28) 1976
R Leus (6147_CR29) 2004; 36
MD Mahdi Mobini (6147_CR32) 2009; 13
N Kumar (6147_CR26) 2016; 20
References_xml – volume: 182
  start-page: 1012
  issue: 3
  year: 2007
  end-page: 1022
  ident: CR14
  article-title: Linear programming based algorithms for preemptive and non-preemptive RCPSP
  publication-title: Eur J Oper Res
  doi: 10.1016/j.ejor.2006.09.052
– volume: 41
  start-page: 358
  issue: 3
  year: 2009
  end-page: 366
  ident: CR44
  article-title: Hybrid-directional planning: improving improvement heuristics for scheduling resource-constrained projects
  publication-title: Int J Adv Manuf Tech
  doi: 10.1007/s00170-008-1486-5
– volume: 20
  start-page: 197
  year: 2017
  end-page: 217
  ident: CR3
  article-title: A mixed-integer linear programming model for solving fuzzy stochastic resource constrained project scheduling problem
  publication-title: Oper Res Int J
  doi: 10.1007/s12351-017-0321-x
– ident: CR16
– volume: 33
  start-page: 373
  issue: 6
  year: 2016
  end-page: 382
  ident: CR13
  article-title: Preemption resource-constrained project scheduling problems with fuzzy random duration and resource availabilities
  publication-title: J Ind Prod Eng
  doi: 10.1080/21681015.2016.1140089
– volume: 107
  start-page: 272
  issue: 2
  year: 1998
  end-page: 288
  ident: CR10
  article-title: A branch and bound algorithm for the resource-constrained project scheduling problem
  publication-title: Eur J Oper Res
  doi: 10.1016/S0377-2217(97)00335-4
– volume: 23
  start-page: 421
  year: 1968
  end-page: 427
  ident: CR45
  article-title: Probability measures of fuzzy events
  publication-title: J Math Anal Appl
  doi: 10.1016/0022-247X(68)90078-4
– volume: 10
  start-page: 195
  year: 2007
  end-page: 207
  ident: CR42
  article-title: A classification of predictive-reactive project scheduling procedures
  publication-title: J Sched
  doi: 10.1007/s10951-007-0011-2
– volume: 5
  start-page: 1
  issue: 4
  year: 2016
  end-page: 15
  ident: CR48
  article-title: A resource-constrained project scheduling problem with fuzzy activity times
  publication-title: Int J Fuzzy Syst Appl (IJFSA)
  doi: 10.4018/IJFSA.2016100101
– ident: CR25
– volume: 11
  start-page: 1
  issue: 2
  year: 2020
  end-page: 14
  ident: CR4
  article-title: A branch and bound algorithm for a multi-mode project scheduling problem with a single non-renewable resource
  publication-title: Int J Inf Tech Proj Manag (IJITPM)
  doi: 10.4018/IJITPM.2020040101
– ident: CR21
– volume: 11
  start-page: 93
  year: 2011
  end-page: 111
  ident: CR46
  article-title: A hybrid decomposition procedure for scheduling projects under multiple resource constraints
  publication-title: Oper Res Int J
  doi: 10.1007/s12351-009-0073-3
– volume: 13
  start-page: 597
  year: 2009
  end-page: 610
  ident: CR32
  article-title: Using an enhanced scatter search algorithm for a resource-constrained project scheduling problem
  publication-title: Soft Comput
  doi: 10.1007/s00500-008-0337-5
– volume: 50
  start-page: 719
  issue: 5–6
  year: 2005
  end-page: 727
  ident: CR47
  article-title: Some Inequalities of random fuzzy variables with application to moment convergence
  publication-title: Comput Math Appl
  doi: 10.1016/j.camwa.2005.04.015
– volume: 21
  start-page: 349
  issue: 3
  year: 2018
  end-page: 365
  ident: CR36
  article-title: New strategies for stochastic resource-constrained project scheduling
  publication-title: J Sched
  doi: 10.1007/s10951-016-0505-x
– volume: 27
  start-page: 585
  year: 2015
  end-page: 605
  ident: CR18
  article-title: An estimation of distribution algorithm and new computational results for stochastic resource-constrained project scheduling problem
  publication-title: Flex Serv Manuf J
  doi: 10.1007/s10696-015-9210-x
– year: 2005
  ident: CR12
  article-title: Fuzzy probability: new approach and applications
  publication-title: Stud Fuzziness Soft Comput Ser
  doi: 10.1007/3-540-32388-0
– volume: 6
  start-page: 299
  issue: 3
  year: 2006
  end-page: 309
  ident: CR34
  article-title: A practical approach to resource-constrained project scheduling
  publication-title: Oper Res Int J
  doi: 10.1007/BF02941258
– volume: 71
  start-page: 66
  year: 2017
  end-page: 84
  ident: CR11
  article-title: An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
  publication-title: Omega
  doi: 10.1016/j.omega.2016.09.009
– volume: 141
  start-page: 259
  issue: 3–4
  year: 2002
  end-page: 271
  ident: CR31
  article-title: Random fuzzy dependent-chance programming and its hybrid intelligent algorithm
  publication-title: Inform Sci
  doi: 10.1016/S0020-0255(02)00176-7
– volume: 20
  start-page: 1565
  year: 2016
  end-page: 1580
  ident: CR26
  article-title: A model for resource-constrained project scheduling using adaptive PSO
  publication-title: Soft Comput
  doi: 10.1007/s00500-015-1606-8
– volume: 183
  start-page: 135
  issue: 1
  year: 2007
  end-page: 147
  ident: CR23
  article-title: Project scheduling problem with mixed uncertainty of randomness and fuzziness
  publication-title: Eur J Oper Res
  doi: 10.1016/j.ejor.2006.09.055
– volume: 107
  start-page: 431
  issue: 2
  year: 1998
  end-page: 450
  ident: CR40
  article-title: Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
  publication-title: Eur J Oper Res
  doi: 10.1016/S0377-2217(97)00348-2
– volume: 20
  start-page: 189
  issue: 1–2
  year: 2013
  end-page: 219
  ident: CR9
  article-title: The MinSlack and Kangaroo algorithm heuristic for fuzzy resource-constrained project scheduling problems
  publication-title: J Mult Valued Logic Soft Comput
– volume: 52
  start-page: 413
  year: 2000
  end-page: 439
  ident: CR17
  article-title: A branch-and-bound algorithm for the resource-constrained project scheduling problem
  publication-title: Math Method Oper Res
  doi: 10.1007/s001860000091
– volume: 27
  start-page: 873
  issue: 10
  year: 2012
  end-page: 907
  ident: CR8
  article-title: Fuzzy resource-constrained project scheduling using taboo search algorithm
  publication-title: Int J Intell Syst
  doi: 10.1002/int.21552
– volume: 70
  start-page: 403
  issue: 3
  year: 2019
  end-page: 419
  ident: CR2
  article-title: Solving the FS-RCPSP with hyper-heuristics: a policy-driven approach
  publication-title: J Oper Res Soc
  doi: 10.1080/01605682.2018.1441636
– year: 1976
  ident: CR28
  publication-title: Combinatorial optimization: networks and matroids
– volume: 165
  start-page: 289
  issue: 2
  year: 2005
  end-page: 306
  ident: CR19
  article-title: Project scheduling under uncertainty: survey and research potentials
  publication-title: Eur J Oper Res
  doi: 10.1016/j.ejor.2004.04.002
– volume: 4
  start-page: 123
  issue: 2
  year: 2010
  end-page: 132
  ident: CR33
  article-title: A resource-constrained project scheduling problem with fuzzy random duration
  publication-title: J Uncertain Syst
– ident: CR37
– ident: CR30
– volume: 11
  start-page: 121
  year: 2008
  end-page: 136
  ident: CR27
  article-title: Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
  publication-title: J Sched
  doi: 10.1007/s10951-007-0021-0
– volume: 4
  start-page: 157
  issue: 2
  year: 2011
  end-page: 171
  ident: CR7
  article-title: New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing
  publication-title: J Sched
  doi: 10.1007/s10951-009-0143-7
– volume: 57
  start-page: 1265
  issue: 4
  year: 2018
  end-page: 1282
  ident: CR15
  article-title: A novel branch-and-bound algorithm for the chance-constrained resource-constrained project scheduling problem
  publication-title: Int J Prod Res
  doi: 10.1080/00207543.2018.1504245
– volume: 4
  start-page: 71
  year: 2005
  end-page: 78
  ident: CR22
  article-title: One machine scheduling problem with fuzzy random due-dates
  publication-title: Fuzzy Optim Decis Making
  doi: 10.1007/s10700-004-5571-4
– volume: 36
  start-page: 667
  issue: 7
  year: 2004
  end-page: 682
  ident: CR29
  article-title: Stability and resource allocation in project planning
  publication-title: IIE Trans
  doi: 10.1080/07408170490447348
– volume: 23
  start-page: 7805
  year: 2019
  end-page: 7819
  ident: CR38
  article-title: A novel heuristic algorithm with activity back-shift response model for resource-constrained project scheduling problem
  publication-title: Soft Comput
  doi: 10.1007/s00500-018-3410-8
– volume: 114
  start-page: 409
  issue: 2
  year: 1986
  end-page: 422
  ident: CR35
  article-title: Fuzzy random variables
  publication-title: J Math Anal Appl
  doi: 10.1016/0022-247X(86)90093-4
– volume: 109
  start-page: 35
  issue: 1
  year: 2000
  end-page: 53
  ident: CR100
  article-title: Evolutionary algorithm solution to fuzzy problems: fuzzy linear programming
  publication-title: Fuzzy Set Sys
  doi: 10.1016/S0165-0114(98)00022-0
– volume: 15
  start-page: 253
  year: 2012
  end-page: 272
  ident: CR43
  article-title: A fuzzy random resource-constrained scheduling model with multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project
  publication-title: J Sched
  doi: 10.1007/s10951-010-0173-1
– volume: 102
  start-page: 83
  year: 2001
  end-page: 109
  ident: CR1
  article-title: A robust genetic algorithm for resource allocation in project scheduling
  publication-title: Ann Oper Res
  doi: 10.1023/A:1010949931021
– volume: 149
  start-page: 249
  issue: 2
  year: 2003
  end-page: 267
  ident: CR5
  article-title: Insertion techniques for static and dynamic resource-constrained project scheduling
  publication-title: Eur J Oper Res
  doi: 10.1016/S0377-2217(02)00758-0
– volume: 19
  start-page: 195
  issue: 3
  year: 1997
  end-page: 203
  ident: CR41
  article-title: An exact algorithm for project scheduling with multiple modes
  publication-title: Or Spectrum
  doi: 10.1007/BF01545587
– volume: 64
  start-page: 1327
  year: 2013
  end-page: 1335
  ident: CR39
  article-title: Solving resource-constrained project scheduling problem with evolutionary programming
  publication-title: J Oper Res Soc
  doi: 10.1057/jors.2012.69
– volume: 5
  start-page: 31
  issue: 1
  year: 1981
  end-page: 46
  ident: CR20
  article-title: Concepts of probabilistic sets
  publication-title: Fuzzy Set Syst
  doi: 10.1016/0165-0114(81)90032-4
– volume: 25
  start-page: 175
  issue: 1
  year: 2013
  end-page: 205
  ident: CR6
  article-title: Robust optimization for resource-constrained project scheduling with uncertain activity durations
  publication-title: Flex Serv Manuf J
  doi: 10.1007/s10696-012-9147-2
– volume: 41
  start-page: 1693
  year: 1995
  end-page: 1703
  ident: CR24
  article-title: Characterization and generation of a general class of resource-constrained project scheduling problems
  publication-title: Manag Sci
  doi: 10.1287/mnsc.41.10.1693
– volume: 10
  start-page: 195
  year: 2007
  ident: 6147_CR42
  publication-title: J Sched
  doi: 10.1007/s10951-007-0011-2
– volume: 36
  start-page: 667
  issue: 7
  year: 2004
  ident: 6147_CR29
  publication-title: IIE Trans
  doi: 10.1080/07408170490447348
– volume: 23
  start-page: 7805
  year: 2019
  ident: 6147_CR38
  publication-title: Soft Comput
  doi: 10.1007/s00500-018-3410-8
– volume: 27
  start-page: 873
  issue: 10
  year: 2012
  ident: 6147_CR8
  publication-title: Int J Intell Syst
  doi: 10.1002/int.21552
– volume-title: Combinatorial optimization: networks and matroids
  year: 1976
  ident: 6147_CR28
– volume: 27
  start-page: 585
  year: 2015
  ident: 6147_CR18
  publication-title: Flex Serv Manuf J
  doi: 10.1007/s10696-015-9210-x
– volume: 183
  start-page: 135
  issue: 1
  year: 2007
  ident: 6147_CR23
  publication-title: Eur J Oper Res
  doi: 10.1016/j.ejor.2006.09.055
– volume: 6
  start-page: 299
  issue: 3
  year: 2006
  ident: 6147_CR34
  publication-title: Oper Res Int J
  doi: 10.1007/BF02941258
– volume: 13
  start-page: 597
  year: 2009
  ident: 6147_CR32
  publication-title: Soft Comput
  doi: 10.1007/s00500-008-0337-5
– volume: 41
  start-page: 358
  issue: 3
  year: 2009
  ident: 6147_CR44
  publication-title: Int J Adv Manuf Tech
  doi: 10.1007/s00170-008-1486-5
– volume: 50
  start-page: 719
  issue: 5–6
  year: 2005
  ident: 6147_CR47
  publication-title: Comput Math Appl
  doi: 10.1016/j.camwa.2005.04.015
– volume: 20
  start-page: 197
  year: 2017
  ident: 6147_CR3
  publication-title: Oper Res Int J
  doi: 10.1007/s12351-017-0321-x
– ident: 6147_CR25
  doi: 10.1007/978-94-009-3943-1
– volume: 15
  start-page: 253
  year: 2012
  ident: 6147_CR43
  publication-title: J Sched
  doi: 10.1007/s10951-010-0173-1
– volume: 5
  start-page: 31
  issue: 1
  year: 1981
  ident: 6147_CR20
  publication-title: Fuzzy Set Syst
  doi: 10.1016/0165-0114(81)90032-4
– volume: 52
  start-page: 413
  year: 2000
  ident: 6147_CR17
  publication-title: Math Method Oper Res
  doi: 10.1007/s001860000091
– volume: 11
  start-page: 1
  issue: 2
  year: 2020
  ident: 6147_CR4
  publication-title: Int J Inf Tech Proj Manag (IJITPM)
  doi: 10.4018/IJITPM.2020040101
– volume: 33
  start-page: 373
  issue: 6
  year: 2016
  ident: 6147_CR13
  publication-title: J Ind Prod Eng
  doi: 10.1080/21681015.2016.1140089
– volume: 165
  start-page: 289
  issue: 2
  year: 2005
  ident: 6147_CR19
  publication-title: Eur J Oper Res
  doi: 10.1016/j.ejor.2004.04.002
– volume: 70
  start-page: 403
  issue: 3
  year: 2019
  ident: 6147_CR2
  publication-title: J Oper Res Soc
  doi: 10.1080/01605682.2018.1441636
– ident: 6147_CR30
  doi: 10.1007/978-3-7908-1781-2
– volume: 25
  start-page: 175
  issue: 1
  year: 2013
  ident: 6147_CR6
  publication-title: Flex Serv Manuf J
  doi: 10.1007/s10696-012-9147-2
– volume: 20
  start-page: 189
  issue: 1–2
  year: 2013
  ident: 6147_CR9
  publication-title: J Mult Valued Logic Soft Comput
– volume: 57
  start-page: 1265
  issue: 4
  year: 2018
  ident: 6147_CR15
  publication-title: Int J Prod Res
  doi: 10.1080/00207543.2018.1504245
– volume: 4
  start-page: 71
  year: 2005
  ident: 6147_CR22
  publication-title: Fuzzy Optim Decis Making
  doi: 10.1007/s10700-004-5571-4
– volume: 11
  start-page: 93
  year: 2011
  ident: 6147_CR46
  publication-title: Oper Res Int J
  doi: 10.1007/s12351-009-0073-3
– ident: 6147_CR21
  doi: 10.1007/978-3-642-01510-6_8
– volume: 107
  start-page: 431
  issue: 2
  year: 1998
  ident: 6147_CR40
  publication-title: Eur J Oper Res
  doi: 10.1016/S0377-2217(97)00348-2
– year: 2005
  ident: 6147_CR12
  publication-title: Stud Fuzziness Soft Comput Ser
  doi: 10.1007/3-540-32388-0
– volume: 109
  start-page: 35
  issue: 1
  year: 2000
  ident: 6147_CR100
  publication-title: Fuzzy Set Sys
  doi: 10.1016/S0165-0114(98)00022-0
– volume: 20
  start-page: 1565
  year: 2016
  ident: 6147_CR26
  publication-title: Soft Comput
  doi: 10.1007/s00500-015-1606-8
– volume: 21
  start-page: 349
  issue: 3
  year: 2018
  ident: 6147_CR36
  publication-title: J Sched
  doi: 10.1007/s10951-016-0505-x
– volume: 64
  start-page: 1327
  year: 2013
  ident: 6147_CR39
  publication-title: J Oper Res Soc
  doi: 10.1057/jors.2012.69
– volume: 107
  start-page: 272
  issue: 2
  year: 1998
  ident: 6147_CR10
  publication-title: Eur J Oper Res
  doi: 10.1016/S0377-2217(97)00335-4
– ident: 6147_CR37
– volume: 102
  start-page: 83
  year: 2001
  ident: 6147_CR1
  publication-title: Ann Oper Res
  doi: 10.1023/A:1010949931021
– volume: 71
  start-page: 66
  year: 2017
  ident: 6147_CR11
  publication-title: Omega
  doi: 10.1016/j.omega.2016.09.009
– ident: 6147_CR16
  doi: 10.1007/b101924
– volume: 4
  start-page: 123
  issue: 2
  year: 2010
  ident: 6147_CR33
  publication-title: J Uncertain Syst
– volume: 114
  start-page: 409
  issue: 2
  year: 1986
  ident: 6147_CR35
  publication-title: J Math Anal Appl
  doi: 10.1016/0022-247X(86)90093-4
– volume: 149
  start-page: 249
  issue: 2
  year: 2003
  ident: 6147_CR5
  publication-title: Eur J Oper Res
  doi: 10.1016/S0377-2217(02)00758-0
– volume: 182
  start-page: 1012
  issue: 3
  year: 2007
  ident: 6147_CR14
  publication-title: Eur J Oper Res
  doi: 10.1016/j.ejor.2006.09.052
– volume: 23
  start-page: 421
  year: 1968
  ident: 6147_CR45
  publication-title: J Math Anal Appl
  doi: 10.1016/0022-247X(68)90078-4
– volume: 19
  start-page: 195
  issue: 3
  year: 1997
  ident: 6147_CR41
  publication-title: Or Spectrum
  doi: 10.1007/BF01545587
– volume: 11
  start-page: 121
  year: 2008
  ident: 6147_CR27
  publication-title: J Sched
  doi: 10.1007/s10951-007-0021-0
– volume: 141
  start-page: 259
  issue: 3–4
  year: 2002
  ident: 6147_CR31
  publication-title: Inform Sci
  doi: 10.1016/S0020-0255(02)00176-7
– volume: 5
  start-page: 1
  issue: 4
  year: 2016
  ident: 6147_CR48
  publication-title: Int J Fuzzy Syst Appl (IJFSA)
  doi: 10.4018/IJFSA.2016100101
– volume: 41
  start-page: 1693
  year: 1995
  ident: 6147_CR24
  publication-title: Manag Sci
  doi: 10.1287/mnsc.41.10.1693
– volume: 4
  start-page: 157
  issue: 2
  year: 2011
  ident: 6147_CR7
  publication-title: J Sched
  doi: 10.1007/s10951-009-0143-7
SSID ssj0021753
Score 2.3177023
Snippet In this paper, a resource flow-based branch-and-bound procedure is designed to solve the well-known resource-constrained project scheduling problem under the...
SourceID crossref
springer
SourceType Enrichment Source
Index Database
Publisher
StartPage 14315
SubjectTerms Artificial Intelligence
Computational Intelligence
Control
Engineering
Mathematical Logic and Foundations
Mechatronics
Optimization
Robotics
Title A resource flow-based branch-and-bound algorithm to solve fuzzy stochastic resource-constrained project scheduling problem
URI https://link.springer.com/article/10.1007/s00500-021-06147-9
Volume 25
WOSCitedRecordID wos000687896200002&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVPQU
  databaseName: Advanced Technologies & Aerospace Database
  customDbUrl:
  eissn: 1433-7479
  dateEnd: 20241209
  omitProxy: false
  ssIdentifier: ssj0021753
  issn: 1432-7643
  databaseCode: P5Z
  dateStart: 20090101
  isFulltext: true
  titleUrlDefault: https://search.proquest.com/hightechjournals
  providerName: ProQuest
– providerCode: PRVPQU
  databaseName: Computer Science Database
  customDbUrl:
  eissn: 1433-7479
  dateEnd: 20241209
  omitProxy: false
  ssIdentifier: ssj0021753
  issn: 1432-7643
  databaseCode: K7-
  dateStart: 20090101
  isFulltext: true
  titleUrlDefault: http://search.proquest.com/compscijour
  providerName: ProQuest
– providerCode: PRVPQU
  databaseName: ProQuest Central
  customDbUrl:
  eissn: 1433-7479
  dateEnd: 20241209
  omitProxy: false
  ssIdentifier: ssj0021753
  issn: 1432-7643
  databaseCode: BENPR
  dateStart: 20090101
  isFulltext: true
  titleUrlDefault: https://www.proquest.com/central
  providerName: ProQuest
– providerCode: PRVAVX
  databaseName: SpringerLINK Contemporary 1997-Present
  customDbUrl:
  eissn: 1433-7479
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0021753
  issn: 1432-7643
  databaseCode: RSV
  dateStart: 19970401
  isFulltext: true
  titleUrlDefault: https://link.springer.com/search?facet-content-type=%22Journal%22
  providerName: Springer Nature
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LSwMxEB58HfTgoyo-Sw7eNLCPtLs5qiieitQH3pZMsrFCbaXdKvbXO9lmFwUp6H0SQjLJfJNkvg_gxKJBgq05V0GMXFhEjop82ahWiHQ22NDMxCaSTid9epK3vihsXP12r54ky5O6LnZzVCUBd18KXBaTcLkIyxTuUifY0L17rNMszz1JQICwIwVcXyrzex8_w9HPt9AyxFxv_G9wm7DuISU7n_nAFizkgwZsVHINzO_eBqx94x7chuk5G_mre2b7ww_u4plh6IQ2elwNDEenuMRU_3k4eil6r6wYMnLUdzKfTKefjFCj7ilH81x3xLVDm050gnrydzyM0mcKZ67qnXn1mh14uL66v7zhXoiB60iGBRdKRUoZESWBalN-p1BEGMctSgXRaqtEy6JyFbSmbcLIkrEMUiWlTUwapwnGu7A0GA7yPWCirXWgQ50EEgXqFAlyxTZQQsRJLtt6H8JqPTLtWcrduPtZza9cTnVGU52VU53JfTit27zNODrmWp9VS5j5_TqeY37wN_NDWI2cF5TVikewVIwm-TGs6PfiZTxqwvLFVee22ywd9gvpqear
linkProvider Springer Nature
linkToHtml http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LSwMxEB58gXrwLb7NwZsG9pF2N0cRRVGL-MLbkkk2VqittKtif72TbXZREEHvkxCSSeabJPN9AHsWDRJszbkKYuTCInJU5MtGNUKks8GGZiQ2kbRa6cODvPJFYYPqt3v1JFme1HWxm6MqCbj7UuCymITLcZgUFLEcY_71zX2dZnnuSQIChB0p4PpSmZ_7-B6Ovr-FliHmZP5_g1uAOQ8p2eHIBxZhLO8uwXwl18D87l2C2S_cg8swPGR9f3XPbKf3zl08Mwyd0Eabq67h6BSXmOo89vpPRfuZFT1GjvpG5q_D4Qcj1KjbytE81x1x7dCmE52gnvwdD6P0mcKZq3pnXr1mBe5Ojm-PTrkXYuA6kmHBhVKRUkZESaCalN8pFBHGcYNSQbTaKtGwqFwFrWmaMLJkLINUSWkTk8ZpgvEqTHR73XwNmGhqHehQJ4FEgTpFglyxDZQQcZLLpl6HsFqPTHuWcjfuTlbzK5dTndFUZ-VUZ3Id9us2LyOOjl-tD6olzPx-HfxivvE3812YPr29vMguzlrnmzATOY8oKxe3YKLov-bbMKXfiqdBf6d02k-AROf1
linkToPdf http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV1LS8QwEB58IXrwLb7NwZsG-8hum6Ooi6Isgg-8lUzSuMLalbUq7q930s0WBRHE-zSEyaQzk-T7PoA9iwapbM25CmLkwiJyVBTLRjVCpH-DDc1QbCJpt9P7e3n1BcVfvXYfXUkOMQ2OpakoD5-NPayBb462JODueYHraBIux2FSuIf0rl-_vqtbLs9DSUUB1ZGUfD1s5ucxvqem7_eiVbppzf9_ogsw50tNdjSMjUUYy4slmB_JODC_q5dg9gsn4TIMjljfH-kz2-29c5fnDEMnwNHhqjAcnRITU92HXv-x7DyxsscogN_I_HUw-GBUTeqOcvTP9UBcuyrUiVHQSP7sh1FbTWnOoeGZV7VZgdvW6c3xGfcCDVxHMiy5UCpSyogoCVST-j6FIsI4blCLiFZbJRoWlUPWmqYJI0vGMkiVlDYxaZwmGK_CRNEr8jVgoql1oEOdBBIF6hSpFIttoISIk1w29TqEo7XJtGcvd_PuZjXvcuXqjFydVa7O5Drs1988D7k7frU-GC1n5vfxyy_mG38z34Xpq5NWdnnevtiEmcgFRAVo3IKJsv-ab8OUfisfX_o7Vfx-Aoe28Nk
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=A+resource+flow-based+branch-and-bound+algorithm+to+solve+fuzzy+stochastic+resource-constrained+project+scheduling+problem&rft.jtitle=Soft+computing+%28Berlin%2C+Germany%29&rft.au=Alipouri%2C+Yaghoub&rft.date=2021-11-01&rft.pub=Springer+Berlin+Heidelberg&rft.issn=1432-7643&rft.eissn=1433-7479&rft.volume=25&rft.issue=22&rft.spage=14315&rft.epage=14331&rft_id=info:doi/10.1007%2Fs00500-021-06147-9&rft.externalDocID=10_1007_s00500_021_06147_9
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1432-7643&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1432-7643&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1432-7643&client=summon