Project scheduling with limited resources using an efficient differential evolution algorithm
Extensive research has been devoted to resource constrained project scheduling problem (RCPSP). Resources are renewable and there is a unique way to perform the activities. This work develops a population based evolutionary algorithm namely differential evolution (DE) to schedule project activities...
Uložené v:
| Vydané v: | Journal of King Saud University. Engineering sciences Ročník 27; číslo 2; s. 176 - 184 |
|---|---|
| Hlavní autori: | , , , |
| Médium: | Journal Article |
| Jazyk: | English |
| Vydavateľské údaje: |
Springer
01.07.2015
|
| Predmet: | |
| ISSN: | 1018-3639 |
| On-line prístup: | Získať plný text |
| Tagy: |
Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
|
| Shrnutí: | Extensive research has been devoted to resource constrained project scheduling problem (RCPSP). Resources are renewable and there is a unique way to perform the activities. This work develops a population based evolutionary algorithm namely differential evolution (DE) to schedule project activities to minimize makespan subject to precedence constraints and resources availability. The proposed DE uses a priority value based representation to encode a project schedule and a serial generation scheme to obtain the schedule. The DE algorithm is compared with some existing algorithms available in the literature on the basis of a computational experiment performed on Patterson’s test bed. Obtained results show that the performance of the proposed DE is quite satisfactory. |
|---|---|
| ISSN: | 1018-3639 |
| DOI: | 10.1016/j.jksues.2013.08.003 |