Specialised impounding plan of a rockfill dam after construction case study of Madani dam
To control and ensure the safety of the Madani Tabriz dam at the period 10 years after the end of construction, dam monitoring is performed utilising data from the instrumentation installed on the dam’s body. In this study, using the Midas finite element software, the results of the settlement, pore...
Uložené v:
| Vydané v: | Geotechnical research Ročník 12; číslo 2; s. 102 - 112 |
|---|---|
| Hlavní autori: | , |
| Médium: | Journal Article |
| Jazyk: | English |
| Vydavateľské údaje: |
11.06.2025
|
| ISSN: | 2052-6156, 2052-6156 |
| On-line prístup: | Získať plný text |