Dynamic multi-period mixed-integer non-linear programming model for equipment selection in the mining industry
Planning an equipment fleet is a complex engineering challenge involving (1) the capacity selection of equipment pieces forming a fleet, (2) the determination of fleet size, (3) strategic timing of equipment acquisitions, and (4) ensuring compatibility between interconnected equipment. Selecting equ...
Uložené v:
| Vydané v: | Mining technology (2018) Ročník 134; číslo 2; s. 143 - 158 |
|---|---|
| Hlavní autori: | , |
| Médium: | Journal Article |
| Jazyk: | English |
| Vydavateľské údaje: |
London, England
SAGE Publications
01.06.2025
|
| Predmet: | |
| ISSN: | 2572-6668, 2572-6676 |
| On-line prístup: | Získať plný text |
| Tagy: |
Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
|
Buďte prvý, kto okomentuje tento záznam!