Dynamic multi-period mixed-integer non-linear programming model for equipment selection in the mining industry

Planning an equipment fleet is a complex engineering challenge involving (1) the capacity selection of equipment pieces forming a fleet, (2) the determination of fleet size, (3) strategic timing of equipment acquisitions, and (4) ensuring compatibility between interconnected equipment. Selecting equ...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:Mining technology (2018) Ročník 134; číslo 2; s. 143 - 158
Hlavní autori: Senses, Sena, Kumral, Mustafa
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: London, England SAGE Publications 01.06.2025
Predmet:
ISSN:2572-6668, 2572-6676
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Buďte prvý, kto okomentuje tento záznam!
Najprv sa musíte prihlásiť.