Improved algorithm for minimizing total late work on a proportionate flow shop and extensions to job rejection and generalized due dates

Gerstl et al (2019) studied the problem of minimizing the total late work (TLW) on an m-machine proportionate flow shop. They solved the case where the total late work refers to the last operation of the job (i.e., the operation performed on the last machine of the flow shop). As the problem is know...