An FPTAS for two performance measures for the relocation scheduling problem subject to fixed processing sequences
In this paper we consider a resource-constrained scheduling problem on two parallel dedicated machines with given fixed processing sequences of jobs assigned to each one of the machines. The problem is to determine the starting times of all jobs, subject to the resource constraint, in order to minim...
Uložené v:
| Vydané v: | Optimization letters Ročník 16; číslo 4; s. 1181 - 1196 |
|---|---|
| Hlavní autori: | , |
| Médium: | Journal Article |
| Jazyk: | English |
| Vydavateľské údaje: |
Berlin/Heidelberg
Springer Berlin Heidelberg
01.05.2022
|
| Predmet: | |
| ISSN: | 1862-4472, 1862-4480 |
| On-line prístup: | Získať plný text |
| Tagy: |
Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
|
| Shrnutí: | In this paper we consider a resource-constrained scheduling problem on two parallel dedicated machines with given fixed processing sequences of jobs assigned to each one of the machines. The problem is to determine the starting times of all jobs, subject to the resource constraint, in order to minimize some given performance measure. Lin et al. (J Sched 19(2):153–163, 2016) showed that the problem is NP-hard in the ordinary sense under the performance measures of weighted total tardiness and weighted number of tardy jobs, and questioned the existence of approximation schemes. In this paper we answer their question in the affirmative by designing fully polynomial time approximation schemes. |
|---|---|
| ISSN: | 1862-4472 1862-4480 |
| DOI: | 10.1007/s11590-021-01772-7 |