Project Management Information Systems: a Systematic Review

This paper presents a systematic scientific literature review of software in Project Management over the past five years. Through keyword-based research and subsequent selection, 108 papers were identified. Initially, these papers were categorized based on their research methodology and objectives....

Full description

Saved in:
Bibliographic Details
Published in:Procedia computer science Vol. 256; pp. 1739 - 1747
Main Authors: Massimo, Rebuglio, Zenezini, Giovanni, Ottaviani, Filippo Maria, De Marco, Alberto
Format: Journal Article
Language:English
Published: Elsevier B.V 2025
Subjects:
ISSN:1877-0509, 1877-0509
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Abstract This paper presents a systematic scientific literature review of software in Project Management over the past five years. Through keyword-based research and subsequent selection, 108 papers were identified. Initially, these papers were categorized based on their research methodology and objectives. Then, trends related to the terminology, affiliation country, and journals and conferences where they were published were analyzed. The first result is related to the nomenclature: most sources refer to this kind of software as Project Management Information System (PMIS), followed by Project Management Software (PMS), Project Management System, and Project Management Tools. As for the contents, those include 43 case studies and/or technical reports on PMIS development, 28 case studies about implementing PMIS in business contexts, 27 frameworks and models for developing or implementing a PMIS, 13 models for comparing PMIS, and 12 surveys on PMIS adoption (some sources fall into multiple categories). No specific trending journals or conferences have emerged. It is discussed that the lack of standardized terminology has hindered the development of coherent literature strands, unlike in other business software domains such as Enterprise Resource Planning (ERP). This fragmentation could act as a barrier to competition among applications, delaying the development of quality software and necessitating customized solutions due to the scarcity and difficulty of obtaining commercial options.
AbstractList This paper presents a systematic scientific literature review of software in Project Management over the past five years. Through keyword-based research and subsequent selection, 108 papers were identified. Initially, these papers were categorized based on their research methodology and objectives. Then, trends related to the terminology, affiliation country, and journals and conferences where they were published were analyzed. The first result is related to the nomenclature: most sources refer to this kind of software as Project Management Information System (PMIS), followed by Project Management Software (PMS), Project Management System, and Project Management Tools. As for the contents, those include 43 case studies and/or technical reports on PMIS development, 28 case studies about implementing PMIS in business contexts, 27 frameworks and models for developing or implementing a PMIS, 13 models for comparing PMIS, and 12 surveys on PMIS adoption (some sources fall into multiple categories). No specific trending journals or conferences have emerged. It is discussed that the lack of standardized terminology has hindered the development of coherent literature strands, unlike in other business software domains such as Enterprise Resource Planning (ERP). This fragmentation could act as a barrier to competition among applications, delaying the development of quality software and necessitating customized solutions due to the scarcity and difficulty of obtaining commercial options.
Author Massimo, Rebuglio
Zenezini, Giovanni
De Marco, Alberto
Ottaviani, Filippo Maria
Author_xml – sequence: 1
  givenname: Rebuglio
  surname: Massimo
  fullname: Massimo, Rebuglio
  email: massimo.rebuglio@polito.it
  organization: Politecnico di Torino, Corso Duca degli Abruzzi, 24 - 10129, Italy
– sequence: 2
  givenname: Giovanni
  surname: Zenezini
  fullname: Zenezini, Giovanni
  organization: Politecnico di Torino, Corso Duca degli Abruzzi, 24 - 10129, Italy
– sequence: 3
  givenname: Filippo Maria
  surname: Ottaviani
  fullname: Ottaviani, Filippo Maria
  organization: Politecnico di Torino, Corso Duca degli Abruzzi, 24 - 10129, Italy
– sequence: 4
  givenname: Alberto
  surname: De Marco
  fullname: De Marco, Alberto
  organization: Politecnico di Torino, Corso Duca degli Abruzzi, 24 - 10129, Italy
BookMark eNp9kEtLAzEUhYNUsNb-AjfzB2bMYzKZKC6k-ChUFB_rkGRuZAablGRQ-u9NbReuvJt7uHAu53ynaOKDB4TOCa4IJs3FUG1isKmimPIK04oRdoSmpBWixBzLyR99guYpDTgPa1tJxBRdPccwgB2LR-31B6zBj8XSuxDXeuyDL163aYR1uiz0QeazLV7gq4fvM3Ts9GeC-WHP0Pvd7dvioVw93S8XN6vSUsJZCdI53eqm0ZZ3RhvJLWfYYGG7llpJXU1AGiNaZoSjkkjOa0JMzakTrOYNmyG2_2tjSCmCU5vYr3XcKoLVDoEa1C8CtUOgMFUZQXZd712Qo-W4USXbg7fQ9TEXVl3o__X_AAc2Z00
Cites_doi 10.1088/1755-1315/769/4/042014
10.1007/978-3-030-11235-6_19
10.2118/210877-MS
10.4186/ej.2022.26.1.55
10.1201/9780429320774-6
10.1007/978-3-030-47679-3_14
10.5829/ije.2020.33.10a.01
10.1016/j.procs.2019.12.197
10.1109/AHPCAI57455.2022.10087744
10.1051/e3sconf/202339101217
10.1051/e3sconf/202342901010
10.1080/13467581.2021.1941999
10.1109/ICIMTech55957.2022.9915140
10.1007/978-981-16-8062-5_21
10.1007/978-3-031-49252-5_19
10.1016/j.ijproman.2020.05.001
10.1155/2021/2815086
10.1109/ICBDIE50010.2020.00112
10.1109/ICNETIC59568.2023.00014
10.1007/978-3-030-97269-1_11
10.1063/5.0057988
10.15587/1729-4061.2022.253299
10.1109/CITSM56380.2022.9935912
10.5539/ass.v9n5p18
10.1109/FarEastCon50210.2020.9271201
10.1109/ICIMTech.2019.8843768
10.55267/iadt.07.13841
10.1109/DeSE58274.2023.10099939
10.1109/ICEDCS60513.2023.00070
10.1109/ISSE46696.2019.8984516
10.1109/ICECCME57830.2023.10252628
10.1007/s10559-020-00281-2
10.3390/su142113862
10.1109/ICter53630.2021.9774820
10.1088/1742-6596/1641/1/012054
10.4018/978-1-6684-5255-4.ch001
10.1109/ITME53901.2021.00011
10.1145/3422392.3422504
10.1007/978-3-030-25128-4_96
10.1016/j.procs.2021.01.184
10.1109/ICMTMA50254.2020.00153
10.1016/j.matpr.2022.11.446
10.2507/31st.daaam.proceedings.119
10.1088/1757-899X/662/2/022014
10.24928/2019/0106
10.1061/9780784483893.097
10.1063/5.0076283
10.1007/978-981-16-0742-4_7
10.1007/978-981-19-1939-8_58
10.1145/3482632.3483995
10.1109/ACCESS.2020.2988511
10.1109/ICOMITEE.2019.8921046
10.1109/ComTech52583.2021.9616886
10.3390/app112311233
10.1088/1742-6596/1639/1/012091
10.21533/pen.v7i4.942
10.1016/j.aej.2019.05.001
10.1109/CSIT49958.2020.9322051
10.1145/3482632.3483996
10.1109/ICESIT53460.2021.9696613
10.1007/978-3-031-27506-7_18
10.1088/1757-899X/1009/1/012005
10.1088/1742-6596/1418/1/012014
10.1109/CIBDA50819.2020.00112
10.1109/ICoDSE53690.2021.9648477
10.1051/e3sconf/202338909021
10.4102/aej.v7i1.385
10.1109/SSD.2019.8893274
10.1088/1757-899X/528/1/012037
10.5220/0012052200003546
10.1007/978-3-030-29586-8_52
10.1007/978-981-19-9205-6_2
10.1016/j.procs.2019.12.198
10.18421/TEM123-65
10.1007/978-981-19-7660-5_32
10.1061/JCEMD4.COENG-13150
10.3390/app12094401
10.1109/SUMMA57301.2022.9973960
10.1088/1757-899X/879/1/012064
10.1007/978-3-031-35467-0_10
10.1109/SIST50301.2021.9465900
10.1108/IJMPB-09-2021-0229
10.1145/3483794.3483815
10.1016/j.compind.2020.103301
10.1109/ITIS50118.2020.9321070
10.1063/5.0146372
10.3390/electronics11233872
10.1201/9780429282829
ContentType Journal Article
Copyright 2025 The Author(s)
Copyright_xml – notice: 2025 The Author(s)
DBID 6I.
AAFTH
AAYXX
CITATION
DOI 10.1016/j.procs.2025.02.313
DatabaseName ScienceDirect Open Access Titles
Elsevier:ScienceDirect:Open Access
CrossRef
DatabaseTitle CrossRef
DatabaseTitleList
DeliveryMethod fulltext_linktorsrc
Discipline Computer Science
EISSN 1877-0509
EndPage 1747
ExternalDocumentID 10_1016_j_procs_2025_02_313
S1877050925006817
GroupedDBID --K
0R~
1B1
457
5VS
6I.
71M
AACTN
AAEDT
AAEDW
AAFTH
AAIKJ
AALRI
AAQFI
AAXUO
ABMAC
ABWVN
ACGFS
ACRPL
ADBBV
ADEZE
ADNMO
ADVLN
AEXQZ
AFTJW
AGHFR
AITUG
AKRWK
ALMA_UNASSIGNED_HOLDINGS
AMRAJ
E3Z
EBS
EJD
EP3
FDB
FNPLU
HZ~
IXB
KQ8
M41
M~E
O-L
O9-
OK1
P2P
RIG
ROL
SES
SSZ
9DU
AAYWO
AAYXX
ACVFH
ADCNI
AEUPX
AFPUW
AIGII
AKBMS
AKYEP
CITATION
~HD
ID FETCH-LOGICAL-c2153-e9ffa8a66ac5dbab95c530b07cd82c92f41e9bb783b7f291955411b452f734563
ISSN 1877-0509
IngestDate Sat Nov 29 08:03:39 EST 2025
Sat Apr 19 15:53:57 EDT 2025
IsDoiOpenAccess true
IsOpenAccess true
IsPeerReviewed true
IsScholarly true
Keywords Project Management Software
Project Management
Project Management Information System
Systematic Literature Review
Language English
License This is an open access article under the CC BY license.
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-c2153-e9ffa8a66ac5dbab95c530b07cd82c92f41e9bb783b7f291955411b452f734563
OpenAccessLink https://dx.doi.org/10.1016/j.procs.2025.02.313
PageCount 9
ParticipantIDs crossref_primary_10_1016_j_procs_2025_02_313
elsevier_sciencedirect_doi_10_1016_j_procs_2025_02_313
PublicationCentury 2000
PublicationDate 2025
2025-00-00
PublicationDateYYYYMMDD 2025-01-01
PublicationDate_xml – year: 2025
  text: 2025
PublicationDecade 2020
PublicationTitle Procedia computer science
PublicationYear 2025
Publisher Elsevier B.V
Publisher_xml – name: Elsevier B.V
References Garyaeva, V., Garyaev, A., Parfenov, S. (2023) “Automation of the process of coordinating project work”
Castro-Maldonado, J. J., Londoño-Gallego, J. A., Londoño-Marin, S., Patiño-Murillo, J. A. (2019) “Implementation of a technological, information, and communication tool for project management in the network of Tecnoparque, Colombia”
Nyandongo, K. M., Lubisi, J. (2019) “Assessing the use of project management information systems and its impact on project outcome”
240–247.
Li, C., Zhang, S. Y., Na, J. S., Yue, L. (2022) “Design and Implementation of Project Management System Based on Vue3.0 Framework”
Chunyi, L. (2023) “Power Engineering Construction Management Information System Based on Data Mining Algorithm”
Badiru, A. B. (2019) “Project Management: Systems, Principles, and Applications”, Second Edition, CRC Press.
Purohit, A., Chopra, G., Dangwal, P. G. (2022) “Measuring the Effectiveness of the Project Management Information System (PMIS) on the Financial Wellness of Rural Households in the Hill Districts of Uttarakhand, India: An IS-FW Model”
198–206.
1582–1586.
449–459.
2046–2057.
Naik, N., Jenkins, P. (2019) “A web based method for managing PRINCE2® projects using trello®”
Alves, P. R., Tereso, A., Fernandes, G. (2019) "Project management system implementation in SMEs: A case study"
Amarasekara, T. N. E., Isurindi, H. G. P., Navanjana, E. H. D. T. D., Gamage, O. M., Samarakoon, U., Kugathasan, A. (2021) “Project Zone: An Advanced Undergraduate Project Management System For Software Development”
Soleh, O., Rosdiana, Dewi, M. A., Ningsih, Y. F. (2020) “Utilization of Information System in Electrical Panel Project Management to Provide Various Facility in Project Implementation”
Narlawar, G. S., Chaphalkar, N. B., Sandbhor, S. (2019) “Application of primavera software in management of construction project: A review”
Churacharit, C., Chutima, P. (2022) “An Integration of Project Management Body of Knowledge and Project Management Information System to Improve On-time Deliverable of Liquefied Natural Gas Station Construction Projects”
Weiss, C., Keckeis, J. (2020) “Procedural model for selecting enterprise systems based on project management software
Yehorchenkova, N., Yehorchenkov, O., Sazonov, A. (2021) “Project management information systems: An experience of developing and implementation on a production enterprise. Case study”
Assaad, R. H., El-Adaway, I. H., Hastak, M., Needy, K. L. S. (2021) “Smart and Emerging Technologies: Shaping the Future of the Industry and Offsite Construction”
787–794.
183–188.
347–353.
Goldstein, M., Eliezer, O. (2024) “A Software Package (in progress) that Implements the Hammock-EFL Methodology”
100014.
Tulupov, M. A. (2020) “Methodology for Constructing a Project Management Information System Based on the Enterprise Application Integration”
Vărzaru, A. A. (2022) “An Empirical Framework for Assessing the Digital Technologies Users’ Acceptance in Project Management”
Shanmugan, P., Kesavan, K., Senthilkumar, C., Shantharam, Y., Sivakaumar, C. T. (2022) “Need for metro rail system & Its planning using MSP”
Warinda, E. (2019) “Evaluating operationalisation of integrated monitoring and evaluation system in Kisumu County: Implications for policy makers”
Al-Nakeeb, A., El Khatib, M., Abu Zitar, R., Alhosani, A., Alhosani, I. (2023) “Project Manager’s Role in Manage Project Knowledge Process: An Approach to Enhance Project Quality”
332–337.
381–388.
73828–73842.
Kock, A., Schulz, B., Kopmann, J., Gemünden, H. G. (2020) “Project portfolio management information systems’ positive influence on performance – the importance of process maturity”
357–361.
,
Zhao, P. (2021) “Engineering Management Information System Based on Adaptive Ant Colony Algorithm”
53–65.
.
Haloul, M. I. K., Mohd Ariffin, M. K. A., Supeni, E. E., Ahmad, S. A. B., Bilema, M., Ahmad, M. (2024) “A Systematic Review of the Project Management Information Systems in Different Types of Construction Projects”
Mikkelsen, M. F., Aaltonen, K. (2023) “IT-enabled management of project complexity – An Action Design Research project”
Aishwarya, S., Muthu, D., Venkata, S. C. (2019) “Progress monitoring in a real time infrastructure projects”
1
Atmika, I. M. B., Wahyuni, P. I., Sinarta, I. N. (2023) “Implementation of construction management system based on information technology (IT) and integrated towards digital construction in industry 4.0”
Pedrosa, J., Varajão, J., Magalhães, L., and Martinho, R. (2021) “Process Mining for IS Project Success Factors Management: A proposal”
Ali, N. H. M., et al. (2021) “Agile Project Management Software for Construction and Management Industries”
Yanzheng, W. (2021) “Design and application of information system and technology in business management: Take the design of the Chengdu Panda Park project as an example”
180–185.
11–20.
Alvanchi, A., Shiri, N., Alikhani, H. (2020) “In-depth investigation of project planning and control software package application in the construction industry of Iran”
Alam, S. (2019) “An Innovative Project Management System”
184–187.
693–697.
Yehorchenkova, N., Yehorchenkov, O., Teslia, I., Kataieva, Y., Mitsenko, S. (2020) “The Concept of an Add-On of a Functional Portfolio and Project Management Environment”
Schimanski, C. P., Monizza, G. P., Marcher, C., Matt, D. T. (2019) “Conceptual foundations for a new lean BIM-based production system in construction”
144–150.
Choi, J., Ha, M. (2022) “Validation of project management information systems for industrial construction projects”
Martínez, P. Q., Puyén, R. C. (2021) “Design of a Project Monitoring and Control System based on the Earned Value Management Technique to Improve the Management of Institutional Projects in a Microfinance Entity in Trujillo, 2020”
Yan, Y., Song, Y., Zhang, X., Ai, L. (2021) “Research on the construction of project management information system based on multi-tier architecture”
1814–1824.
641–654.
229–241.
Głodziński, E., Szymborski, M. (2019) “Utilization of software supporting project management in middle and large project-based organizations: An empirical study in Poland”
Abdel-Khalek, H. A., Aziz, R. F., Abdellatif, I. A. (2019) “Prepare and analysis for claims in construction projects using Primavera Contract Management (PCM)”
487–497.
Tsurkan, M. V., Liubarskaia, M. A., Chekalin, V. S., Mironova, S. M., Artemiev, A. A. (2020) “Information Systems for Project Management in the Public Sector”
131–136.
Panakala Rao, K. L. N., Chamberlin, K. S. (2019) “Resources optimization in construction of a residential apartment by using primavera: A Case Study”
30
Teslia, I., Khlevna, I., Yehorchenkov, O., Zaspa, H., Khlevnyi, A. (2021) “The concept of integrated information technology of enterprises project activities management implementation”
Fachrizal, M. R., Wibawa, J. C., Afifah, Z. (2020) “Web-Based Project Management Information System in Construction Projects”
780–790.
Fadillah, A. P., Fitriana, D. (2019) “Design of Project Data Management Information System
Piñero Ramírez, P. E., Pérez Pupo, I., Piñero Pérez, P. Y., Marquez Ruiz, Y., Fustiel Alvarez, Y. (2022) “A Software Ecosystem for Project Management in BIM Environments Assisted by Artificial Intelligent Techniques”
425–439.
1924–1932.
Teslia, I. et al. (2022) “Development of the concept of construction of the project management information standard on the basis of the Primadoc information management system”
404–412.
Lukianov, D., Mazhei, K., Gogunskii, V., Kolesnikov, O. (2021) “Transformation Digital Competence Area in the Competence Model of Project Managers”
Project Management Institute. (2021). A guide to the Project Management Body of Knowledge (PMBOK guide) (7th ed.).
143–152.
Retnowardhani, A., Suroso, J. S. (2019) “Project Management Information Systems (PMIS) for Project Management Effectiveness: Comparison of Case Studies”
Harshavardhan, T., Reddy, V. S., Vardhani, P. S. R. P. S. S. S., Shrihari, S., Alawadi, A. H. R., Sharma, S. D. (2023) “Resource Allocation, Scheduling and Planning of a Multi Storeyed Residential Building”
Ledenev, M., and Shashkin, A. (2022) “Project Management System Tools Based on Approximate Information Models”, in Proceedings of
Diao, Y., Zhang, Q. (2021) “Optimization of Management Mode of Small- and Medium-Sized Enterprises Based on Decision Tree Model”
453–456.
Xie, B., Lin, Z., Chen, J., Maizura, I. (2021) “Application of artificial intelligence computer control technology in management information system”
Melecký, L., Staníčková, M. (2021) “Project Management Skills: Hard Versus Soft. Is It Enough? Technical Tools That Really Work”
Jun, T. K., Ramiah, S. (2023) “Preliminary study: Professional Collaboration Application with Project Management Tools”
269–273.
Stanimirovic, P., Borozan, T., Radojicic, M., Tomic, A. D. (2023) “Project Management Software Tools - One Step Closer to UN Sustainable Development Goals”
Shanmugan, P., Kesavan, K., Senthilkumar, C., Shantharam, Y., Sivakaumar, C. T. (2022) "Need for metro rail system & Its planning using MSP", AIP Conference Proceedings. doi
160–164.
Chowdhury, D., Gharami, P., Akter, J. (2019) “Implementing Advanced Software in Construction Project Management and Control”
Li, Q., Jiang, M., Tao, S., Hao, J., and Chong, H.-Y. (2023) “The Integrated Problem of Construction Project Scheduling and Multiskilled Staff Assignment with Learning Effect”, J Constr Eng Manag 149 (8). doi
Pirola, F., Boucher, X., Wiesner, S., Pezzotta, G. (2020) “Digital technologies in product-service systems: a literature review and a research agenda”
Ahmad, T., Arif, F. (2021) “Open Source Project Management Software Evaluation: Application to an E-commerce Project”
142–151.
Luong, H. H., Huynh, T. K. N., Dao, A. T., Nguyen, H. T. (2021) “An Approach for Project Management System Based on Blockchain”
Raj, H., Punhani, R., Punhani, I. (2023) “A practical approach to visualizing different phases of project management using MSProject”
55–73.
851–859.
8322–8332.
012054.
Silva, D., Gomes, A., Macieira, R., Silva, E., Soares, S. (2020) “Pah Pum: A project management tool based on TAKT PM”
Yan,
10.1016/j.procs.2025.02.313_bib20
10.1016/j.procs.2025.02.313_bib15
10.1016/j.procs.2025.02.313_bib14
10.1016/j.procs.2025.02.313_bib17
10.1016/j.procs.2025.02.313_bib16
10.1016/j.procs.2025.02.313_bib11
10.1016/j.procs.2025.02.313_bib99
10.1016/j.procs.2025.02.313_bib10
10.1016/j.procs.2025.02.313_bib98
10.1016/j.procs.2025.02.313_bib13
10.1016/j.procs.2025.02.313_bib12
10.1016/j.procs.2025.02.313_bib19
10.1016/j.procs.2025.02.313_bib18
10.1016/j.procs.2025.02.313_bib95
10.1016/j.procs.2025.02.313_bib94
10.1016/j.procs.2025.02.313_bib97
10.1016/j.procs.2025.02.313_bib96
10.1016/j.procs.2025.02.313_bib91
10.1016/j.procs.2025.02.313_bib90
10.1016/j.procs.2025.02.313_bib93
10.1016/j.procs.2025.02.313_bib92
10.1016/j.procs.2025.02.313_bib88
10.1016/j.procs.2025.02.313_bib87
10.1016/j.procs.2025.02.313_bib89
10.1016/j.procs.2025.02.313_bib111
10.1016/j.procs.2025.02.313_bib40
10.1016/j.procs.2025.02.313_bib42
10.1016/j.procs.2025.02.313_bib41
10.1016/j.procs.2025.02.313_bib37
10.1016/j.procs.2025.02.313_bib36
10.1016/j.procs.2025.02.313_bib39
10.1016/j.procs.2025.02.313_bib38
10.1016/j.procs.2025.02.313_bib9
10.1016/j.procs.2025.02.313_bib33
10.1016/j.procs.2025.02.313_bib32
10.1016/j.procs.2025.02.313_bib35
10.1016/j.procs.2025.02.313_bib34
10.1016/j.procs.2025.02.313_bib5
10.1016/j.procs.2025.02.313_bib110
10.1016/j.procs.2025.02.313_bib6
10.1016/j.procs.2025.02.313_bib7
10.1016/j.procs.2025.02.313_bib8
10.1016/j.procs.2025.02.313_bib1
10.1016/j.procs.2025.02.313_bib2
10.1016/j.procs.2025.02.313_bib3
10.1016/j.procs.2025.02.313_bib4
10.1016/j.procs.2025.02.313_bib107
10.1016/j.procs.2025.02.313_bib106
10.1016/j.procs.2025.02.313_bib105
10.1016/j.procs.2025.02.313_bib104
10.1016/j.procs.2025.02.313_bib103
10.1016/j.procs.2025.02.313_bib102
10.1016/j.procs.2025.02.313_bib101
10.1016/j.procs.2025.02.313_bib100
10.1016/j.procs.2025.02.313_bib31
10.1016/j.procs.2025.02.313_bib30
10.1016/j.procs.2025.02.313_bib109
10.1016/j.procs.2025.02.313_bib108
10.1016/j.procs.2025.02.313_bib26
10.1016/j.procs.2025.02.313_bib25
10.1016/j.procs.2025.02.313_bib28
10.1016/j.procs.2025.02.313_bib27
10.1016/j.procs.2025.02.313_bib22
10.1016/j.procs.2025.02.313_bib21
10.1016/j.procs.2025.02.313_bib24
10.1016/j.procs.2025.02.313_bib23
10.1016/j.procs.2025.02.313_bib29
10.1016/j.procs.2025.02.313_bib62
10.1016/j.procs.2025.02.313_bib61
10.1016/j.procs.2025.02.313_bib64
10.1016/j.procs.2025.02.313_bib63
10.1016/j.procs.2025.02.313_bib60
10.1016/j.procs.2025.02.313_bib59
10.1016/j.procs.2025.02.313_bib58
10.1016/j.procs.2025.02.313_bib55
10.1016/j.procs.2025.02.313_bib54
10.1016/j.procs.2025.02.313_bib57
10.1016/j.procs.2025.02.313_bib56
10.1016/j.procs.2025.02.313_bib51
10.1016/j.procs.2025.02.313_bib50
10.1016/j.procs.2025.02.313_bib53
10.1016/j.procs.2025.02.313_bib52
10.1016/j.procs.2025.02.313_bib48
10.1016/j.procs.2025.02.313_bib47
10.1016/j.procs.2025.02.313_bib49
10.1016/j.procs.2025.02.313_bib44
10.1016/j.procs.2025.02.313_bib43
10.1016/j.procs.2025.02.313_bib46
10.1016/j.procs.2025.02.313_bib45
10.1016/j.procs.2025.02.313_bib84
10.1016/j.procs.2025.02.313_bib83
10.1016/j.procs.2025.02.313_bib86
10.1016/j.procs.2025.02.313_bib85
10.1016/j.procs.2025.02.313_bib80
10.1016/j.procs.2025.02.313_bib82
10.1016/j.procs.2025.02.313_bib81
10.1016/j.procs.2025.02.313_bib77
10.1016/j.procs.2025.02.313_bib76
10.1016/j.procs.2025.02.313_bib79
10.1016/j.procs.2025.02.313_bib78
10.1016/j.procs.2025.02.313_bib73
10.1016/j.procs.2025.02.313_bib72
10.1016/j.procs.2025.02.313_bib75
10.1016/j.procs.2025.02.313_bib74
10.1016/j.procs.2025.02.313_bib71
10.1016/j.procs.2025.02.313_bib70
10.1016/j.procs.2025.02.313_bib69
10.1016/j.procs.2025.02.313_bib66
10.1016/j.procs.2025.02.313_bib65
10.1016/j.procs.2025.02.313_bib68
10.1016/j.procs.2025.02.313_bib67
References_xml – reference: Głodziński, E., Szymborski, M. (2019) “Utilization of software supporting project management in middle and large project-based organizations: An empirical study in Poland”,
– reference: Huang, R., Pu, H., Zou, L., and Shi, W. (2020) “Design of Multi-project Collaborative Management System”,
– reference: . 143–152.
– reference: : 73828–73842.
– reference: Aishwarya, S., Muthu, D., Venkata, S. C. (2019) “Progress monitoring in a real time infrastructure projects”,
– reference: Assaad, R. H., El-Adaway, I. H., Hastak, M., Needy, K. L. S. (2021) “Smart and Emerging Technologies: Shaping the Future of the Industry and Offsite Construction”,
– reference: : 347–353.
– reference: CCIS: 310–326.
– reference: Hu, F. (2020) “The application of information system in the management of university’s repair project”,
– reference: : 1817–1825.
– reference: Castro-Maldonado, J. J., Londoño-Gallego, J. A., Londoño-Marin, S., Patiño-Murillo, J. A. (2019) “Implementation of a technological, information, and communication tool for project management in the network of Tecnoparque, Colombia”,
– reference: Yehorchenkova, N., Teslia, I., Yehorchenkov, O. (2020) “Method of project and operational processes integration in the activities of project-oriented enterprises based on functional 4Р-environment”,
– reference: Gusnawan, R., Lubis, M. (2023) “Web-Based Village Bridge and Road Project Monitoring Information System”,
– reference: : 912–915.
– reference: Badiru, A. B. (2019) “Project Management: Systems, Principles, and Applications”, Second Edition, CRC Press.
– reference: Atmika, I. M. B., Wahyuni, P. I., Sinarta, I. N. (2023) “Implementation of construction management system based on information technology (IT) and integrated towards digital construction in industry 4.0”,
– reference: Soleh, O., Rosdiana, Dewi, M. A., Ningsih, Y. F. (2020) “Utilization of Information System in Electrical Panel Project Management to Provide Various Facility in Project Implementation”,
– reference: Chunyi, L. (2023) “Power Engineering Construction Management Information System Based on Data Mining Algorithm”,
– reference: Mikkelsen, M. F., Aaltonen, K. (2023) “IT-enabled management of project complexity – An Action Design Research project”,
– reference: Shanmugan, P., Kesavan, K., Senthilkumar, C., Shantharam, Y., Sivakaumar, C. T. (2022) “Need for metro rail system & Its planning using MSP”,
– reference: : 780–790.
– reference: 69–74.
– reference: : 160–164.
– reference: : 180–185.
– reference: : 40–43.
– reference: : 449–459.
– reference: : 743–747.
– reference: Stanimirovic, P., Borozan, T., Radojicic, M., Tomic, A. D. (2023) “Project Management Software Tools - One Step Closer to UN Sustainable Development Goals”,
– reference: Pedrosa, J., Varajão, J., Magalhães, L., and Martinho, R. (2021) “Process Mining for IS Project Success Factors Management: A proposal”
– reference: Owolabi, O. A. et al. (Year not specified) “Utilization of Social Management Theoretical Framework and Program Management Tool to Successfully Manage Large Multi-Department STEM Projects”,
– reference: : 131–136.
– reference: Teslia, I. et al. (2023) “Development of the Concept of Intelligent Add-On over Project Planning Instruments”,
– reference: : 55–73.
– reference: Bošnjak, A., Majstorovic, V. (2020) “Practical application of contemporary project management software”,
– reference: Aziz, M., Ghuzdewan, T. (2023) “Evaluation of a construction management software: ‘Progresi’”,
– reference: Churacharit, C., Chutima, P. (2022) “An Integration of Project Management Body of Knowledge and Project Management Information System to Improve On-time Deliverable of Liquefied Natural Gas Station Construction Projects”,
– reference: Dehao, G. (2020) “Analysis and improvement of construction project management system based on network information”,
– reference: Harshavardhan, T., Reddy, V. S., Vardhani, P. S. R. P. S. S. S., Shrihari, S., Alawadi, A. H. R., Sharma, S. D. (2023) “Resource Allocation, Scheduling and Planning of a Multi Storeyed Residential Building”,
– reference: Kock, A., Schulz, B., Kopmann, J., Gemünden, H. G. (2020) “Project portfolio management information systems’ positive influence on performance – the importance of process maturity”,
– reference: Alvanchi, A., Shiri, N., Alikhani, H. (2020) “In-depth investigation of project planning and control software package application in the construction industry of Iran”,
– reference: Project Management Institute. (2021). A guide to the Project Management Body of Knowledge (PMBOK guide) (7th ed.).
– reference: Choi, J., Ha, M. (2022) “Validation of project management information systems for industrial construction projects”,
– reference: Irfan, M., Hassan, M., Hassan, N., Habib, M., Khan, S., Nasruddin, A. M. (2020) “Project Management Maturity and Organizational Reputation: A Case Study of Public Sector Organizations”,
– reference: Santoso, F., Widyani, Y. (2021) “EssenceProject: Software Project Planning Tools based on OMG’s Essence”,
– reference: Diao, Y., Zhang, Q. (2021) “Optimization of Management Mode of Small- and Medium-Sized Enterprises Based on Decision Tree Model”,
– reference: : 11–20.
– reference: Aljebory, K. M., QaisIssam, M. (2019) “Developing AI Based Scheme for Project Planning by Expert Merging Revit and Primavera Software”,
– reference: Zhang, K., Zhang, X. (2021) “Research on the overall architecture design of project management information system based on SOA”,
– reference: : 1814–1824.
– reference: Pavlíčková, P., Brožová, H., Rydval, J., Havlíček, J., Šubrt, T. (2021) “New MS Project Add-in for Task Threatness Evaluation”,
– reference: ,
– reference: : 198–206.
– reference: : 144–150.
– reference: Panakala Rao, K. L. N., Chamberlin, K. S. (2019) “Resources optimization in construction of a residential apartment by using primavera: A Case Study”,
– reference: Vărzaru, A. A. (2022) “An Empirical Framework for Assessing the Digital Technologies Users’ Acceptance in Project Management”
– reference: Haloul, M. I. K., Mohd Ariffin, M. K. A., Supeni, E. E., Ahmad, S. A. B., Bilema, M., Ahmad, M. (2024) “A Systematic Review of the Project Management Information Systems in Different Types of Construction Projects”,
– reference: : 295–310.
– reference: Shanmugan, P., Kesavan, K., Senthilkumar, C., Shantharam, Y., Sivakaumar, C. T. (2022) "Need for metro rail system & Its planning using MSP", AIP Conference Proceedings. doi:
– reference: : 851–859.
– reference: Garyaeva, V., Garyaev, A., Parfenov, S. (2023) “Automation of the process of coordinating project work”,
– reference: Purohit, A., Chopra, G., Dangwal, P. G. (2022) “Measuring the Effectiveness of the Project Management Information System (PMIS) on the Financial Wellness of Rural Households in the Hill Districts of Uttarakhand, India: An IS-FW Model”,
– reference: Piñero Ramírez, P. E., Pérez Pupo, I., Piñero Pérez, P. Y., Marquez Ruiz, Y., Fustiel Alvarez, Y. (2022) “A Software Ecosystem for Project Management in BIM Environments Assisted by Artificial Intelligent Techniques”
– reference: Chowdhury, D., Gharami, P., Akter, J. (2019) “Implementing Advanced Software in Construction Project Management and Control”,
– reference: Miranda, S., Sugarindra, M. (2019) “Utilizing project management software in project scheduling: A case study”,
– reference: Narlawar, G. S., Chaphalkar, N. B., Sandbhor, S. (2019) “Application of primavera software in management of construction project: A review”,
– reference: Tsurkan, M. V., Liubarskaia, M. A., Chekalin, V. S., Mironova, S. M., Artemiev, A. A. (2020) “Information Systems for Project Management in the Public Sector”,
– reference: : 474–477.
– reference: Fadillah, A. P., Fitriana, D. (2019) “Design of Project Data Management Information System
– reference: , 641–654.
– reference: : 367–376.
– reference: : 381–388.
– reference: Gejo-García, J., Gallego-García, S., García-García, M. (2022) “Project Design and Management of Optimized Self-Protection Plans: A Case Study for Spanish Public Buildings”,
– reference: Tulupov, M. A. (2020) “Methodology for Constructing a Project Management Information System Based on the Enterprise Application Integration”,
– reference: : 877–888.
– reference: Martínez, P. Q., Puyén, R. C. (2021) “Design of a Project Monitoring and Control System based on the Earned Value Management Technique to Improve the Management of Institutional Projects in a Microfinance Entity in Trujillo, 2020”,
– reference: Warinda, E. (2019) “Evaluating operationalisation of integrated monitoring and evaluation system in Kisumu County: Implications for policy makers”,
– reference: Abrantes, R., and Figueiredo, J. (2021) “Information systems and change in project based organizations”,
– reference: : 53–65.
– reference: : 787–794.
– reference: : 149–161.
– reference: Jimenez-Barros, M. A., Ramirez Rios, D. G., Ardila Hernandez, C. J., Castro Bolaño, L. J., Neira Rodado, D. (2020) “Design of a Decision Support System for Multiobjective Activity Planning and Programming Using Global Bacteria Optimization”,
– reference: Ali, N. H. M., et al. (2021) “Agile Project Management Software for Construction and Management Industries”
– reference: Corrigan, M. J., van der Poll, J. A., Mtsweni, E. S. (2019) “The project management information system as enabler for ICT4D achievement at capability maturity level 2 and above”,
– reference: Teslia, I. et al. (2022) “Development of the concept of construction of the project management information standard on the basis of the Primadoc information management system”,
– reference: Zhao, P. (2021) “Engineering Management Information System Based on Adaptive Ant Colony Algorithm”,
– reference: Ledenev, M., and Shashkin, A. (2022) “Project Management System Tools Based on Approximate Information Models”, in Proceedings of
– reference: : 453–456.
– reference: Huang, X., Huang, J., Ao, Z., Cui, Y. (2023) “Research on application software architecture under the project management informatization of power grid enterprises”,
– reference: Teslia, I., Khlevna, I., Yehorchenkov, O., Zaspa, H., Khlevnyi, A. (2021) “The concept of integrated information technology of enterprises project activities management implementation”,
– reference: 1–6.
– reference: 30
– reference: Shah, P., Chandragade, A. A. (2023) “Application of project management tool in construction for Planning, Scheduling and Optimization”,
– reference: : 103301.
– reference: Fachrizal, M. R., Wibawa, J. C., Afifah, Z. (2020) “Web-Based Project Management Information System in Construction Projects”,
– reference: 332–337.
– reference: : 269–273.
– reference: Goldstein, M., Eliezer, O. (2024) “A Software Package (in progress) that Implements the Hammock-EFL Methodology”,
– reference: Pirola, F., Boucher, X., Wiesner, S., Pezzotta, G. (2020) “Digital technologies in product-service systems: a literature review and a research agenda”,
– reference: Chadegani, A. A. et al. (2013) “A Comparison between Two Main Academic Literature Collections: Web of Science and Scopus Databases”,
– reference: Jun, T. K., Ramiah, S. (2023) “Preliminary study: Professional Collaboration Application with Project Management Tools”,
– reference: Melecký, L., Staníčková, M. (2021) “Project Management Skills: Hard Versus Soft. Is It Enough? Technical Tools That Really Work”,
– reference: Alves, P. R., Tereso, A., Fernandes, G. (2019) "Project management system implementation in SMEs: A case study",
– reference: Retnowardhani, A., Suroso, J. S. (2019) “Project Management Information Systems (PMIS) for Project Management Effectiveness: Comparison of Case Studies”,
– reference: LNCS: 235–238.
– reference: : 183–188.
– reference: Lukianov, D., Mazhei, K., Gogunskii, V., Kolesnikov, O. (2021) “Transformation Digital Competence Area in the Competence Model of Project Managers”,
– reference: Al-Nakeeb, A., El Khatib, M., Abu Zitar, R., Alhosani, A., Alhosani, I. (2023) “Project Manager’s Role in Manage Project Knowledge Process: An Approach to Enhance Project Quality”,
– reference: 693–697.
– reference: Silva, D., Gomes, A., Macieira, R., Silva, E., Soares, S. (2020) “Pah Pum: A project management tool based on TAKT PM”,
– reference: Wach, M., Chomiak-Orsa, I. (2019) “Improvement of investment processes in mining company by implementation of project management system”,
– reference: Ou, J., Yuan, J., Tian, J., Zhang, W., Cao, W., Bai, K. (2021) “Research on Early Warning System of Consulting Risk for Power Engineering Project”,
– reference: Mukhamadiev, R., Staroverova, N., Shustrova, M. (2020) “Specifics of Project Management System Development for Large Organizations”,
– reference: : 141–164.
– reference: Raj, H., Punhani, R., Punhani, I. (2023) “A practical approach to visualizing different phases of project management using MSProject”,
– reference: LNCS: 158–171.
– reference: : 1582–1586.
– reference: : 1924–1932.
– reference: Yan, Z., Wei, G., Dongdong, L., Lei, N., Mengran, Y. (2020) “University Research Project Management System Based on Cloud Platform”,
– reference: Li, C., Zhang, S. Y., Na, J. S., Yue, L. (2022) “Design and Implementation of Project Management System Based on Vue3.0 Framework”,
– reference: Schimanski, C. P., Monizza, G. P., Marcher, C., Matt, D. T. (2019) “Conceptual foundations for a new lean BIM-based production system in construction”,
– reference: : 142–151.
– reference: Ahmad, T., Arif, F. (2021) “Open Source Project Management Software Evaluation: Application to an E-commerce Project”,
– reference: Li, Q., Jiang, M., Tao, S., Hao, J., and Chong, H.-Y. (2023) “The Integrated Problem of Construction Project Scheduling and Multiskilled Staff Assignment with Learning Effect”, J Constr Eng Manag 149 (8). doi:
– reference: Gao, Z. (2023) “Development and application of web information system in enterprise management under SSH framework”,
– reference: AL-Zubaidi, E. D. A. (2019) “Project management information system effect decision making in the construction industry of Iraq”,
– reference: Alam, S. (2019) “An Innovative Project Management System”,
– reference: Mohammed, A., Al Busaeedi, N., Mohamed, A. A., Saud, S. (2022) “Smart Project Management System (SPMS) - An Integrated and Predictive Solution for Proactively Managing Oil & Gas client Projects”,
– reference: Ren, Y. et al. (2020) “Discussion and Research on informatization of Power Grid Infrastructure Project management”,
– reference: Xie, B., Lin, Z., Chen, J., Maizura, I. (2021) “Application of artificial intelligence computer control technology in management information system”,
– reference: Abdel-Khalek, H. A., Aziz, R. F., Abdellatif, I. A. (2019) “Prepare and analysis for claims in construction projects using Primavera Contract Management (PCM)”,
– reference: : 386–390.
– reference: Yehorchenkova, N., Yehorchenkov, O., Teslia, I., Kataieva, Y., Mitsenko, S. (2020) “The Concept of an Add-On of a Functional Portfolio and Project Management Environment”,
– reference: Blaga, F. S., Pop, A., Hule, V., Karczis, A., Buzdugan, D. (2021) “Using critical path method for a new project scheduling - The case of a new product launch in production”,
– reference: : 404–412.
– reference: : 757–760.
– reference: Teslia, I., Klevanna, G. (2022) “Development of a Reflective Intelligent Project Planning System”,
– reference: : 8322–8332.
– reference: ): 53–65.
– reference: Salama, T., Salah, A., Moselhi, O. (2019) “Integrated scheduling of modular construction using mod-scheduler”,
– reference: Ottaviani, F. M., Rebuglio, M., and De Marco, A. (2023) “Project management information system data model development and explanation", in
– reference: : 2046–2057.
– reference: : 773–779.
– reference: : 184–187.
– reference: : 229–241.
– reference: Amarasekara, T. N. E., Isurindi, H. G. P., Navanjana, E. H. D. T. D., Gamage, O. M., Samarakoon, U., Kugathasan, A. (2021) “Project Zone: An Advanced Undergraduate Project Management System For Software Development”,
– reference: : 100014.
– reference: : 012054.
– reference: Yanzheng, W. (2021) “Design and application of information system and technology in business management: Take the design of the Chengdu Panda Park project as an example”,
– reference: Jally, V., Kulkarni, V. N., Gaitonde, V. N., Satis, G. J., Kotturshettar, B. B. (2021) “A review on project management transformation using industry 4.0”,
– reference: Naik, N., Jenkins, P. (2019) “A web based method for managing PRINCE2® projects using trello®”,
– reference: 47–55.
– reference: : 465–493.
– reference: Weiss, C., Keckeis, J. (2020) “Procedural model for selecting enterprise systems based on project management software",
– reference: Yan, Y., Song, Y., Zhang, X., Ai, L. (2021) “Research on the construction of project management information system based on multi-tier architecture”,
– reference: : 1577–1581.
– reference: : 1–5.
– reference: : 425–439.
– reference: : 487–497.
– reference: Zulfiandri, Yasmin, F. D., and Kusumaningtyas, R. H. (2022) “Implementation of Critical Path Method and What If Analysis in Project Management Information System” in
– reference: Lauth, E., Scholz, S. G. (2023) “Introduction and Evaluation of a Project Management Software Tool in the Context of the Administration of Science and Research Projects”,
– reference: Baharom, M. A. A., Rahman, M. S. A., Sabudin, A. R., Nor, M. F. M. (2023) “Decision Support Tools: Machine Learning Application in Smart Planner”,
– reference: 101–111.
– reference: Luong, H. H., Huynh, T. K. N., Dao, A. T., Nguyen, H. T. (2021) “An Approach for Project Management System Based on Blockchain”,
– reference: , 1305.0377.
– reference: : 357–361.
– reference: Yehorchenkova, N., Yehorchenkov, O., Sazonov, A. (2021) “Project management information systems: An experience of developing and implementation on a production enterprise. Case study”,
– reference: .
– reference: Haas, O., Markovič, P. (2023) “Management Information System of the Critical Path of Construction Projects by Way of Example Berlin Brandenburg Airport (BER)”,
– reference: Nyandongo, K. M., Lubisi, J. (2019) “Assessing the use of project management information systems and its impact on project outcome”,
– reference: Muttaqin, F., Akbar, F. A., Mandyartha, E. P., Prasetya, L. M. I. (2020) “Development project management information systems at Unicode Indonesia”,
– reference: : 389–396.
– reference: Pratama, I. N., Dachyar, M., Pratama, N. R. (2023) “Optimization of Resource Allocation and Task Allocation with Project Management Information Systems in Information Technology Companies”,
– reference: : 87–105.
– reference: : 240–247.
– reference: Santy, Magdalena, Y. (2022) “Project Management SaaS Feature Framework for MSMEs in Indonesia”,
– reference: 1 (
– reference: Lima, R., Tereso, A., Faria, J. (2019) "Project management under uncertainty: Resource flexibility visualization in the schedule",
– reference: Micale, R., La Fata, C. M., Lombardo, A., La Scalia, G. (2021) “Project management information systems (Pmiss): A statistical-based analysis for the evaluation of software packages features”,
– ident: 10.1016/j.procs.2025.02.313_bib67
  doi: 10.1088/1755-1315/769/4/042014
– ident: 10.1016/j.procs.2025.02.313_bib74
– ident: 10.1016/j.procs.2025.02.313_bib23
  doi: 10.1007/978-3-030-11235-6_19
– ident: 10.1016/j.procs.2025.02.313_bib43
  doi: 10.2118/210877-MS
– ident: 10.1016/j.procs.2025.02.313_bib10
  doi: 10.4186/ej.2022.26.1.55
– ident: 10.1016/j.procs.2025.02.313_bib45
– ident: 10.1016/j.procs.2025.02.313_bib80
  doi: 10.1201/9780429320774-6
– ident: 10.1016/j.procs.2025.02.313_bib97
– ident: 10.1016/j.procs.2025.02.313_bib49
  doi: 10.1007/978-3-030-47679-3_14
– ident: 10.1016/j.procs.2025.02.313_bib21
  doi: 10.5829/ije.2020.33.10a.01
– ident: 10.1016/j.procs.2025.02.313_bib36
  doi: 10.1016/j.procs.2019.12.197
– ident: 10.1016/j.procs.2025.02.313_bib59
  doi: 10.1109/AHPCAI57455.2022.10087744
– ident: 10.1016/j.procs.2025.02.313_bib88
  doi: 10.1051/e3sconf/202339101217
– ident: 10.1016/j.procs.2025.02.313_bib18
– ident: 10.1016/j.procs.2025.02.313_bib47
  doi: 10.1051/e3sconf/202342901010
– ident: 10.1016/j.procs.2025.02.313_bib6
  doi: 10.1080/13467581.2021.1941999
– ident: 10.1016/j.procs.2025.02.313_bib30
  doi: 10.1109/ICIMTech55957.2022.9915140
– ident: 10.1016/j.procs.2025.02.313_bib8
  doi: 10.1007/978-981-16-8062-5_21
– ident: 10.1016/j.procs.2025.02.313_bib46
  doi: 10.1007/978-3-031-49252-5_19
– ident: 10.1016/j.procs.2025.02.313_bib20
  doi: 10.1016/j.ijproman.2020.05.001
– ident: 10.1016/j.procs.2025.02.313_bib65
  doi: 10.1155/2021/2815086
– ident: 10.1016/j.procs.2025.02.313_bib70
  doi: 10.1109/ICBDIE50010.2020.00112
– ident: 10.1016/j.procs.2025.02.313_bib63
  doi: 10.1109/ICNETIC59568.2023.00014
– ident: 10.1016/j.procs.2025.02.313_bib25
– ident: 10.1016/j.procs.2025.02.313_bib68
  doi: 10.1007/978-3-030-97269-1_11
– ident: 10.1016/j.procs.2025.02.313_bib7
  doi: 10.1063/5.0057988
– ident: 10.1016/j.procs.2025.02.313_bib37
  doi: 10.15587/1729-4061.2022.253299
– ident: 10.1016/j.procs.2025.02.313_bib108
  doi: 10.1109/CITSM56380.2022.9935912
– ident: 10.1016/j.procs.2025.02.313_bib16
  doi: 10.5539/ass.v9n5p18
– ident: 10.1016/j.procs.2025.02.313_bib34
– ident: 10.1016/j.procs.2025.02.313_bib35
  doi: 10.1109/FarEastCon50210.2020.9271201
– ident: 10.1016/j.procs.2025.02.313_bib76
– ident: 10.1016/j.procs.2025.02.313_bib39
  doi: 10.1109/ICIMTech.2019.8843768
– ident: 10.1016/j.procs.2025.02.313_bib3
  doi: 10.1016/j.ijproman.2020.05.001
– ident: 10.1016/j.procs.2025.02.313_bib62
  doi: 10.55267/iadt.07.13841
– ident: 10.1016/j.procs.2025.02.313_bib29
  doi: 10.1109/DeSE58274.2023.10099939
– ident: 10.1016/j.procs.2025.02.313_bib48
  doi: 10.1109/ICEDCS60513.2023.00070
– ident: 10.1016/j.procs.2025.02.313_bib41
  doi: 10.1109/ISSE46696.2019.8984516
– ident: 10.1016/j.procs.2025.02.313_bib28
  doi: 10.1109/ICECCME57830.2023.10252628
– ident: 10.1016/j.procs.2025.02.313_bib101
  doi: 10.1007/s10559-020-00281-2
– ident: 10.1016/j.procs.2025.02.313_bib24
  doi: 10.3390/su142113862
– ident: 10.1016/j.procs.2025.02.313_bib57
  doi: 10.1109/ICter53630.2021.9774820
– ident: 10.1016/j.procs.2025.02.313_bib50
  doi: 10.1088/1742-6596/1641/1/012054
– ident: 10.1016/j.procs.2025.02.313_bib89
  doi: 10.4018/978-1-6684-5255-4.ch001
– ident: 10.1016/j.procs.2025.02.313_bib56
  doi: 10.1109/ITME53901.2021.00011
– ident: 10.1016/j.procs.2025.02.313_bib85
– ident: 10.1016/j.procs.2025.02.313_bib52
  doi: 10.1145/3422392.3422504
– ident: 10.1016/j.procs.2025.02.313_bib103
  doi: 10.1007/978-3-030-25128-4_96
– ident: 10.1016/j.procs.2025.02.313_bib110
  doi: 10.1016/j.procs.2021.01.184
– ident: 10.1016/j.procs.2025.02.313_bib4
  doi: 10.15587/1729-4061.2022.253299
– ident: 10.1016/j.procs.2025.02.313_bib64
  doi: 10.1109/ICMTMA50254.2020.00153
– ident: 10.1016/j.procs.2025.02.313_bib83
  doi: 10.1016/j.matpr.2022.11.446
– ident: 10.1016/j.procs.2025.02.313_bib33
  doi: 10.2507/31st.daaam.proceedings.119
– ident: 10.1016/j.procs.2025.02.313_bib66
  doi: 10.1088/1757-899X/662/2/022014
– ident: 10.1016/j.procs.2025.02.313_bib98
  doi: 10.24928/2019/0106
– ident: 10.1016/j.procs.2025.02.313_bib12
  doi: 10.1061/9780784483893.097
– ident: 10.1016/j.procs.2025.02.313_bib96
– ident: 10.1016/j.procs.2025.02.313_bib91
  doi: 10.1063/5.0076283
– ident: 10.1016/j.procs.2025.02.313_bib55
– ident: 10.1016/j.procs.2025.02.313_bib111
  doi: 10.1007/978-981-16-0742-4_7
– ident: 10.1016/j.procs.2025.02.313_bib78
– ident: 10.1016/j.procs.2025.02.313_bib99
  doi: 10.1007/978-981-19-1939-8_58
– ident: 10.1016/j.procs.2025.02.313_bib69
  doi: 10.1145/3482632.3483995
– ident: 10.1016/j.procs.2025.02.313_bib11
  doi: 10.1109/ACCESS.2020.2988511
– ident: 10.1016/j.procs.2025.02.313_bib13
  doi: 10.1109/ICOMITEE.2019.8921046
– ident: 10.1016/j.procs.2025.02.313_bib32
  doi: 10.1109/ComTech52583.2021.9616886
– ident: 10.1016/j.procs.2025.02.313_bib92
  doi: 10.1063/5.0076283
– ident: 10.1016/j.procs.2025.02.313_bib31
  doi: 10.3390/app112311233
– ident: 10.1016/j.procs.2025.02.313_bib44
  doi: 10.1088/1742-6596/1639/1/012091
– ident: 10.1016/j.procs.2025.02.313_bib26
  doi: 10.21533/pen.v7i4.942
– ident: 10.1016/j.procs.2025.02.313_bib75
  doi: 10.1016/j.aej.2019.05.001
– ident: 10.1016/j.procs.2025.02.313_bib73
  doi: 10.1109/CSIT49958.2020.9322051
– ident: 10.1016/j.procs.2025.02.313_bib100
  doi: 10.1145/3482632.3483996
– ident: 10.1016/j.procs.2025.02.313_bib71
  doi: 10.1109/ICESIT53460.2021.9696613
– ident: 10.1016/j.procs.2025.02.313_bib93
  doi: 10.1007/978-3-031-27506-7_18
– ident: 10.1016/j.procs.2025.02.313_bib94
  doi: 10.1088/1757-899X/1009/1/012005
– ident: 10.1016/j.procs.2025.02.313_bib84
  doi: 10.1088/1742-6596/1418/1/012014
– ident: 10.1016/j.procs.2025.02.313_bib95
  doi: 10.1109/CIBDA50819.2020.00112
– ident: 10.1016/j.procs.2025.02.313_bib54
  doi: 10.1109/ICoDSE53690.2021.9648477
– ident: 10.1016/j.procs.2025.02.313_bib27
  doi: 10.1051/e3sconf/202338909021
– ident: 10.1016/j.procs.2025.02.313_bib77
  doi: 10.4102/aej.v7i1.385
– ident: 10.1016/j.procs.2025.02.313_bib14
– ident: 10.1016/j.procs.2025.02.313_bib87
– ident: 10.1016/j.procs.2025.02.313_bib40
  doi: 10.1109/SSD.2019.8893274
– ident: 10.1016/j.procs.2025.02.313_bib79
  doi: 10.1088/1757-899X/528/1/012037
– ident: 10.1016/j.procs.2025.02.313_bib109
– ident: 10.1016/j.procs.2025.02.313_bib105
  doi: 10.5220/0012052200003546
– ident: 10.1016/j.procs.2025.02.313_bib53
– ident: 10.1016/j.procs.2025.02.313_bib102
  doi: 10.1007/978-3-030-29586-8_52
– ident: 10.1016/j.procs.2025.02.313_bib90
  doi: 10.1007/978-981-19-9205-6_2
– ident: 10.1016/j.procs.2025.02.313_bib22
  doi: 10.1016/j.procs.2019.12.198
– ident: 10.1016/j.procs.2025.02.313_bib5
  doi: 10.18421/TEM123-65
– ident: 10.1016/j.procs.2025.02.313_bib19
– ident: 10.1016/j.procs.2025.02.313_bib38
– ident: 10.1016/j.procs.2025.02.313_bib60
  doi: 10.1007/978-981-19-7660-5_32
– ident: 10.1016/j.procs.2025.02.313_bib104
  doi: 10.1061/JCEMD4.COENG-13150
– ident: 10.1016/j.procs.2025.02.313_bib82
  doi: 10.3390/app12094401
– ident: 10.1016/j.procs.2025.02.313_bib106
  doi: 10.1109/SUMMA57301.2022.9973960
– ident: 10.1016/j.procs.2025.02.313_bib42
  doi: 10.1088/1757-899X/879/1/012064
– ident: 10.1016/j.procs.2025.02.313_bib61
  doi: 10.1007/978-3-031-35467-0_10
– ident: 10.1016/j.procs.2025.02.313_bib17
  doi: 10.1109/SIST50301.2021.9465900
– ident: 10.1016/j.procs.2025.02.313_bib58
– ident: 10.1016/j.procs.2025.02.313_bib1
– ident: 10.1016/j.procs.2025.02.313_bib9
– ident: 10.1016/j.procs.2025.02.313_bib81
  doi: 10.1108/IJMPB-09-2021-0229
– ident: 10.1016/j.procs.2025.02.313_bib72
  doi: 10.1145/3483794.3483815
– ident: 10.1016/j.procs.2025.02.313_bib15
  doi: 10.1016/j.compind.2020.103301
– ident: 10.1016/j.procs.2025.02.313_bib51
  doi: 10.1109/ITIS50118.2020.9321070
– ident: 10.1016/j.procs.2025.02.313_bib86
  doi: 10.1063/5.0146372
– ident: 10.1016/j.procs.2025.02.313_bib107
  doi: 10.3390/electronics11233872
– ident: 10.1016/j.procs.2025.02.313_bib2
  doi: 10.1201/9780429282829
SSID ssj0000388917
Score 2.342529
Snippet This paper presents a systematic scientific literature review of software in Project Management over the past five years. Through keyword-based research and...
SourceID crossref
elsevier
SourceType Index Database
Publisher
StartPage 1739
SubjectTerms Project Management
Project Management Information System
Project Management Software
Systematic Literature Review
Title Project Management Information Systems: a Systematic Review
URI https://dx.doi.org/10.1016/j.procs.2025.02.313
Volume 256
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVHPJ
  databaseName: ROAD: Directory of Open Access Scholarly Resources(FREE)
  customDbUrl:
  eissn: 1877-0509
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0000388917
  issn: 1877-0509
  databaseCode: M~E
  dateStart: 20100101
  isFulltext: true
  titleUrlDefault: https://road.issn.org
  providerName: ISSN International Centre
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1Lb9QwELZWhQMXylOUFuQDtyVSYiexXU4VULhQVaJIvUWxY0tZQbbaLquqB_4Cf5kZ23kAq4oeuESJpTgbz2Rm_O03M4S8AieubW5gm9rYHDYoOk-UsyzJZepKWUqXpto3mxAnJ_L8XJ3OZj_7XJjNV9F18upKXfxXUcMYCBtTZ28h7mFSGIBzEDocQexw_CfBnwZsZUJsmceco2AcQonykOT8eazjPPmTYDFMZDCvxNPOsfPDPLrLEcWGD-rbMkoJAvHA6fI4NJjQ69a3i5p_QL5r17UDnrte15s29JKaHyOec7HEnKF28BDvsCHSysQMHKR-L6foRMhhjqZUCpFgdZngabaMRfvLiqkFzQRXE28MGyax1dIH0GGBfsZg2XVWYO1VHhJbf6-r_Ye_G1iIPcFtUflJKpykSlnFsQvyHSYKhRzBTz9G0A5L5yjfxXl4k76SlecM_vVjtkc7kwjm7AG5H7ce9CiozEMys90jstu39aDRyj8mb6IG0VGD6ESDaNSgQ1rTUX9o0J8n5Mvx-7O3H5PYYyMxEOzxxCrnalmXZW2KRtdaFabgqU6FaSQzirk8s0prIbkWjqlMQfiZZTovmBMcgm_-lOx0y84-I5SX1mrlFATUTZ6qprbMsNRlNssaKU2-R173awEL7kupVDeIYI-U_XpVUb1DlFeBCtx04_PbPWef3MOrAKsdkJ316rt9Qe6azbq9XL308v8F5UqCXw
linkProvider ISSN International Centre
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Project+Management+Information+Systems%3A+a+Systematic+Review&rft.jtitle=Procedia+computer+science&rft.au=Massimo%2C+Rebuglio&rft.au=Zenezini%2C+Giovanni&rft.au=Ottaviani%2C+Filippo+Maria&rft.au=De+Marco%2C+Alberto&rft.date=2025&rft.issn=1877-0509&rft.eissn=1877-0509&rft.volume=256&rft.spage=1739&rft.epage=1747&rft_id=info:doi/10.1016%2Fj.procs.2025.02.313&rft.externalDBID=n%2Fa&rft.externalDocID=10_1016_j_procs_2025_02_313
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1877-0509&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1877-0509&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1877-0509&client=summon