Project Management Information Systems: a Systematic Review
This paper presents a systematic scientific literature review of software in Project Management over the past five years. Through keyword-based research and subsequent selection, 108 papers were identified. Initially, these papers were categorized based on their research methodology and objectives....
Saved in:
| Published in: | Procedia computer science Vol. 256; pp. 1739 - 1747 |
|---|---|
| Main Authors: | , , , |
| Format: | Journal Article |
| Language: | English |
| Published: |
Elsevier B.V
2025
|
| Subjects: | |
| ISSN: | 1877-0509, 1877-0509 |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Abstract | This paper presents a systematic scientific literature review of software in Project Management over the past five years. Through keyword-based research and subsequent selection, 108 papers were identified. Initially, these papers were categorized based on their research methodology and objectives. Then, trends related to the terminology, affiliation country, and journals and conferences where they were published were analyzed. The first result is related to the nomenclature: most sources refer to this kind of software as Project Management Information System (PMIS), followed by Project Management Software (PMS), Project Management System, and Project Management Tools. As for the contents, those include 43 case studies and/or technical reports on PMIS development, 28 case studies about implementing PMIS in business contexts, 27 frameworks and models for developing or implementing a PMIS, 13 models for comparing PMIS, and 12 surveys on PMIS adoption (some sources fall into multiple categories). No specific trending journals or conferences have emerged. It is discussed that the lack of standardized terminology has hindered the development of coherent literature strands, unlike in other business software domains such as Enterprise Resource Planning (ERP). This fragmentation could act as a barrier to competition among applications, delaying the development of quality software and necessitating customized solutions due to the scarcity and difficulty of obtaining commercial options. |
|---|---|
| AbstractList | This paper presents a systematic scientific literature review of software in Project Management over the past five years. Through keyword-based research and subsequent selection, 108 papers were identified. Initially, these papers were categorized based on their research methodology and objectives. Then, trends related to the terminology, affiliation country, and journals and conferences where they were published were analyzed. The first result is related to the nomenclature: most sources refer to this kind of software as Project Management Information System (PMIS), followed by Project Management Software (PMS), Project Management System, and Project Management Tools. As for the contents, those include 43 case studies and/or technical reports on PMIS development, 28 case studies about implementing PMIS in business contexts, 27 frameworks and models for developing or implementing a PMIS, 13 models for comparing PMIS, and 12 surveys on PMIS adoption (some sources fall into multiple categories). No specific trending journals or conferences have emerged. It is discussed that the lack of standardized terminology has hindered the development of coherent literature strands, unlike in other business software domains such as Enterprise Resource Planning (ERP). This fragmentation could act as a barrier to competition among applications, delaying the development of quality software and necessitating customized solutions due to the scarcity and difficulty of obtaining commercial options. |
| Author | Massimo, Rebuglio Zenezini, Giovanni De Marco, Alberto Ottaviani, Filippo Maria |
| Author_xml | – sequence: 1 givenname: Rebuglio surname: Massimo fullname: Massimo, Rebuglio email: massimo.rebuglio@polito.it organization: Politecnico di Torino, Corso Duca degli Abruzzi, 24 - 10129, Italy – sequence: 2 givenname: Giovanni surname: Zenezini fullname: Zenezini, Giovanni organization: Politecnico di Torino, Corso Duca degli Abruzzi, 24 - 10129, Italy – sequence: 3 givenname: Filippo Maria surname: Ottaviani fullname: Ottaviani, Filippo Maria organization: Politecnico di Torino, Corso Duca degli Abruzzi, 24 - 10129, Italy – sequence: 4 givenname: Alberto surname: De Marco fullname: De Marco, Alberto organization: Politecnico di Torino, Corso Duca degli Abruzzi, 24 - 10129, Italy |
| BookMark | eNp9kEtLAzEUhYNUsNb-AjfzB2bMYzKZKC6k-ChUFB_rkGRuZAablGRQ-u9NbReuvJt7uHAu53ynaOKDB4TOCa4IJs3FUG1isKmimPIK04oRdoSmpBWixBzLyR99guYpDTgPa1tJxBRdPccwgB2LR-31B6zBj8XSuxDXeuyDL163aYR1uiz0QeazLV7gq4fvM3Ts9GeC-WHP0Pvd7dvioVw93S8XN6vSUsJZCdI53eqm0ZZ3RhvJLWfYYGG7llpJXU1AGiNaZoSjkkjOa0JMzakTrOYNmyG2_2tjSCmCU5vYr3XcKoLVDoEa1C8CtUOgMFUZQXZd712Qo-W4USXbg7fQ9TEXVl3o__X_AAc2Z00 |
| Cites_doi | 10.1088/1755-1315/769/4/042014 10.1007/978-3-030-11235-6_19 10.2118/210877-MS 10.4186/ej.2022.26.1.55 10.1201/9780429320774-6 10.1007/978-3-030-47679-3_14 10.5829/ije.2020.33.10a.01 10.1016/j.procs.2019.12.197 10.1109/AHPCAI57455.2022.10087744 10.1051/e3sconf/202339101217 10.1051/e3sconf/202342901010 10.1080/13467581.2021.1941999 10.1109/ICIMTech55957.2022.9915140 10.1007/978-981-16-8062-5_21 10.1007/978-3-031-49252-5_19 10.1016/j.ijproman.2020.05.001 10.1155/2021/2815086 10.1109/ICBDIE50010.2020.00112 10.1109/ICNETIC59568.2023.00014 10.1007/978-3-030-97269-1_11 10.1063/5.0057988 10.15587/1729-4061.2022.253299 10.1109/CITSM56380.2022.9935912 10.5539/ass.v9n5p18 10.1109/FarEastCon50210.2020.9271201 10.1109/ICIMTech.2019.8843768 10.55267/iadt.07.13841 10.1109/DeSE58274.2023.10099939 10.1109/ICEDCS60513.2023.00070 10.1109/ISSE46696.2019.8984516 10.1109/ICECCME57830.2023.10252628 10.1007/s10559-020-00281-2 10.3390/su142113862 10.1109/ICter53630.2021.9774820 10.1088/1742-6596/1641/1/012054 10.4018/978-1-6684-5255-4.ch001 10.1109/ITME53901.2021.00011 10.1145/3422392.3422504 10.1007/978-3-030-25128-4_96 10.1016/j.procs.2021.01.184 10.1109/ICMTMA50254.2020.00153 10.1016/j.matpr.2022.11.446 10.2507/31st.daaam.proceedings.119 10.1088/1757-899X/662/2/022014 10.24928/2019/0106 10.1061/9780784483893.097 10.1063/5.0076283 10.1007/978-981-16-0742-4_7 10.1007/978-981-19-1939-8_58 10.1145/3482632.3483995 10.1109/ACCESS.2020.2988511 10.1109/ICOMITEE.2019.8921046 10.1109/ComTech52583.2021.9616886 10.3390/app112311233 10.1088/1742-6596/1639/1/012091 10.21533/pen.v7i4.942 10.1016/j.aej.2019.05.001 10.1109/CSIT49958.2020.9322051 10.1145/3482632.3483996 10.1109/ICESIT53460.2021.9696613 10.1007/978-3-031-27506-7_18 10.1088/1757-899X/1009/1/012005 10.1088/1742-6596/1418/1/012014 10.1109/CIBDA50819.2020.00112 10.1109/ICoDSE53690.2021.9648477 10.1051/e3sconf/202338909021 10.4102/aej.v7i1.385 10.1109/SSD.2019.8893274 10.1088/1757-899X/528/1/012037 10.5220/0012052200003546 10.1007/978-3-030-29586-8_52 10.1007/978-981-19-9205-6_2 10.1016/j.procs.2019.12.198 10.18421/TEM123-65 10.1007/978-981-19-7660-5_32 10.1061/JCEMD4.COENG-13150 10.3390/app12094401 10.1109/SUMMA57301.2022.9973960 10.1088/1757-899X/879/1/012064 10.1007/978-3-031-35467-0_10 10.1109/SIST50301.2021.9465900 10.1108/IJMPB-09-2021-0229 10.1145/3483794.3483815 10.1016/j.compind.2020.103301 10.1109/ITIS50118.2020.9321070 10.1063/5.0146372 10.3390/electronics11233872 10.1201/9780429282829 |
| ContentType | Journal Article |
| Copyright | 2025 The Author(s) |
| Copyright_xml | – notice: 2025 The Author(s) |
| DBID | 6I. AAFTH AAYXX CITATION |
| DOI | 10.1016/j.procs.2025.02.313 |
| DatabaseName | ScienceDirect Open Access Titles Elsevier:ScienceDirect:Open Access CrossRef |
| DatabaseTitle | CrossRef |
| DatabaseTitleList | |
| DeliveryMethod | fulltext_linktorsrc |
| Discipline | Computer Science |
| EISSN | 1877-0509 |
| EndPage | 1747 |
| ExternalDocumentID | 10_1016_j_procs_2025_02_313 S1877050925006817 |
| GroupedDBID | --K 0R~ 1B1 457 5VS 6I. 71M AACTN AAEDT AAEDW AAFTH AAIKJ AALRI AAQFI AAXUO ABMAC ABWVN ACGFS ACRPL ADBBV ADEZE ADNMO ADVLN AEXQZ AFTJW AGHFR AITUG AKRWK ALMA_UNASSIGNED_HOLDINGS AMRAJ E3Z EBS EJD EP3 FDB FNPLU HZ~ IXB KQ8 M41 M~E O-L O9- OK1 P2P RIG ROL SES SSZ 9DU AAYWO AAYXX ACVFH ADCNI AEUPX AFPUW AIGII AKBMS AKYEP CITATION ~HD |
| ID | FETCH-LOGICAL-c2153-e9ffa8a66ac5dbab95c530b07cd82c92f41e9bb783b7f291955411b452f734563 |
| ISSN | 1877-0509 |
| IngestDate | Sat Nov 29 08:03:39 EST 2025 Sat Apr 19 15:53:57 EDT 2025 |
| IsDoiOpenAccess | true |
| IsOpenAccess | true |
| IsPeerReviewed | true |
| IsScholarly | true |
| Keywords | Project Management Software Project Management Project Management Information System Systematic Literature Review |
| Language | English |
| License | This is an open access article under the CC BY license. |
| LinkModel | OpenURL |
| MergedId | FETCHMERGED-LOGICAL-c2153-e9ffa8a66ac5dbab95c530b07cd82c92f41e9bb783b7f291955411b452f734563 |
| OpenAccessLink | https://dx.doi.org/10.1016/j.procs.2025.02.313 |
| PageCount | 9 |
| ParticipantIDs | crossref_primary_10_1016_j_procs_2025_02_313 elsevier_sciencedirect_doi_10_1016_j_procs_2025_02_313 |
| PublicationCentury | 2000 |
| PublicationDate | 2025 2025-00-00 |
| PublicationDateYYYYMMDD | 2025-01-01 |
| PublicationDate_xml | – year: 2025 text: 2025 |
| PublicationDecade | 2020 |
| PublicationTitle | Procedia computer science |
| PublicationYear | 2025 |
| Publisher | Elsevier B.V |
| Publisher_xml | – name: Elsevier B.V |
| References | Garyaeva, V., Garyaev, A., Parfenov, S. (2023) “Automation of the process of coordinating project work” Castro-Maldonado, J. J., Londoño-Gallego, J. A., Londoño-Marin, S., Patiño-Murillo, J. A. (2019) “Implementation of a technological, information, and communication tool for project management in the network of Tecnoparque, Colombia” Nyandongo, K. M., Lubisi, J. (2019) “Assessing the use of project management information systems and its impact on project outcome” 240–247. Li, C., Zhang, S. Y., Na, J. S., Yue, L. (2022) “Design and Implementation of Project Management System Based on Vue3.0 Framework” Chunyi, L. (2023) “Power Engineering Construction Management Information System Based on Data Mining Algorithm” Badiru, A. B. (2019) “Project Management: Systems, Principles, and Applications”, Second Edition, CRC Press. Purohit, A., Chopra, G., Dangwal, P. G. (2022) “Measuring the Effectiveness of the Project Management Information System (PMIS) on the Financial Wellness of Rural Households in the Hill Districts of Uttarakhand, India: An IS-FW Model” 198–206. 1582–1586. 449–459. 2046–2057. Naik, N., Jenkins, P. (2019) “A web based method for managing PRINCE2® projects using trello®” Alves, P. R., Tereso, A., Fernandes, G. (2019) "Project management system implementation in SMEs: A case study" Amarasekara, T. N. E., Isurindi, H. G. P., Navanjana, E. H. D. T. D., Gamage, O. M., Samarakoon, U., Kugathasan, A. (2021) “Project Zone: An Advanced Undergraduate Project Management System For Software Development” Soleh, O., Rosdiana, Dewi, M. A., Ningsih, Y. F. (2020) “Utilization of Information System in Electrical Panel Project Management to Provide Various Facility in Project Implementation” Narlawar, G. S., Chaphalkar, N. B., Sandbhor, S. (2019) “Application of primavera software in management of construction project: A review” Churacharit, C., Chutima, P. (2022) “An Integration of Project Management Body of Knowledge and Project Management Information System to Improve On-time Deliverable of Liquefied Natural Gas Station Construction Projects” Weiss, C., Keckeis, J. (2020) “Procedural model for selecting enterprise systems based on project management software Yehorchenkova, N., Yehorchenkov, O., Sazonov, A. (2021) “Project management information systems: An experience of developing and implementation on a production enterprise. Case study” Assaad, R. H., El-Adaway, I. H., Hastak, M., Needy, K. L. S. (2021) “Smart and Emerging Technologies: Shaping the Future of the Industry and Offsite Construction” 787–794. 183–188. 347–353. Goldstein, M., Eliezer, O. (2024) “A Software Package (in progress) that Implements the Hammock-EFL Methodology” 100014. Tulupov, M. A. (2020) “Methodology for Constructing a Project Management Information System Based on the Enterprise Application Integration” Vărzaru, A. A. (2022) “An Empirical Framework for Assessing the Digital Technologies Users’ Acceptance in Project Management” Shanmugan, P., Kesavan, K., Senthilkumar, C., Shantharam, Y., Sivakaumar, C. T. (2022) “Need for metro rail system & Its planning using MSP” Warinda, E. (2019) “Evaluating operationalisation of integrated monitoring and evaluation system in Kisumu County: Implications for policy makers” Al-Nakeeb, A., El Khatib, M., Abu Zitar, R., Alhosani, A., Alhosani, I. (2023) “Project Manager’s Role in Manage Project Knowledge Process: An Approach to Enhance Project Quality” 332–337. 381–388. 73828–73842. Kock, A., Schulz, B., Kopmann, J., Gemünden, H. G. (2020) “Project portfolio management information systems’ positive influence on performance – the importance of process maturity” 357–361. , Zhao, P. (2021) “Engineering Management Information System Based on Adaptive Ant Colony Algorithm” 53–65. . Haloul, M. I. K., Mohd Ariffin, M. K. A., Supeni, E. E., Ahmad, S. A. B., Bilema, M., Ahmad, M. (2024) “A Systematic Review of the Project Management Information Systems in Different Types of Construction Projects” Mikkelsen, M. F., Aaltonen, K. (2023) “IT-enabled management of project complexity – An Action Design Research project” Aishwarya, S., Muthu, D., Venkata, S. C. (2019) “Progress monitoring in a real time infrastructure projects” 1 Atmika, I. M. B., Wahyuni, P. I., Sinarta, I. N. (2023) “Implementation of construction management system based on information technology (IT) and integrated towards digital construction in industry 4.0” Pedrosa, J., Varajão, J., Magalhães, L., and Martinho, R. (2021) “Process Mining for IS Project Success Factors Management: A proposal” Ali, N. H. M., et al. (2021) “Agile Project Management Software for Construction and Management Industries” Yanzheng, W. (2021) “Design and application of information system and technology in business management: Take the design of the Chengdu Panda Park project as an example” 180–185. 11–20. Alvanchi, A., Shiri, N., Alikhani, H. (2020) “In-depth investigation of project planning and control software package application in the construction industry of Iran” Alam, S. (2019) “An Innovative Project Management System” 184–187. 693–697. Yehorchenkova, N., Yehorchenkov, O., Teslia, I., Kataieva, Y., Mitsenko, S. (2020) “The Concept of an Add-On of a Functional Portfolio and Project Management Environment” Schimanski, C. P., Monizza, G. P., Marcher, C., Matt, D. T. (2019) “Conceptual foundations for a new lean BIM-based production system in construction” 144–150. Choi, J., Ha, M. (2022) “Validation of project management information systems for industrial construction projects” Martínez, P. Q., Puyén, R. C. (2021) “Design of a Project Monitoring and Control System based on the Earned Value Management Technique to Improve the Management of Institutional Projects in a Microfinance Entity in Trujillo, 2020” Yan, Y., Song, Y., Zhang, X., Ai, L. (2021) “Research on the construction of project management information system based on multi-tier architecture” 1814–1824. 641–654. 229–241. Głodziński, E., Szymborski, M. (2019) “Utilization of software supporting project management in middle and large project-based organizations: An empirical study in Poland” Abdel-Khalek, H. A., Aziz, R. F., Abdellatif, I. A. (2019) “Prepare and analysis for claims in construction projects using Primavera Contract Management (PCM)” 487–497. Tsurkan, M. V., Liubarskaia, M. A., Chekalin, V. S., Mironova, S. M., Artemiev, A. A. (2020) “Information Systems for Project Management in the Public Sector” 131–136. Panakala Rao, K. L. N., Chamberlin, K. S. (2019) “Resources optimization in construction of a residential apartment by using primavera: A Case Study” 30 Teslia, I., Khlevna, I., Yehorchenkov, O., Zaspa, H., Khlevnyi, A. (2021) “The concept of integrated information technology of enterprises project activities management implementation” Fachrizal, M. R., Wibawa, J. C., Afifah, Z. (2020) “Web-Based Project Management Information System in Construction Projects” 780–790. Fadillah, A. P., Fitriana, D. (2019) “Design of Project Data Management Information System Piñero Ramírez, P. E., Pérez Pupo, I., Piñero Pérez, P. Y., Marquez Ruiz, Y., Fustiel Alvarez, Y. (2022) “A Software Ecosystem for Project Management in BIM Environments Assisted by Artificial Intelligent Techniques” 425–439. 1924–1932. Teslia, I. et al. (2022) “Development of the concept of construction of the project management information standard on the basis of the Primadoc information management system” 404–412. Lukianov, D., Mazhei, K., Gogunskii, V., Kolesnikov, O. (2021) “Transformation Digital Competence Area in the Competence Model of Project Managers” Project Management Institute. (2021). A guide to the Project Management Body of Knowledge (PMBOK guide) (7th ed.). 143–152. Retnowardhani, A., Suroso, J. S. (2019) “Project Management Information Systems (PMIS) for Project Management Effectiveness: Comparison of Case Studies” Harshavardhan, T., Reddy, V. S., Vardhani, P. S. R. P. S. S. S., Shrihari, S., Alawadi, A. H. R., Sharma, S. D. (2023) “Resource Allocation, Scheduling and Planning of a Multi Storeyed Residential Building” Ledenev, M., and Shashkin, A. (2022) “Project Management System Tools Based on Approximate Information Models”, in Proceedings of Diao, Y., Zhang, Q. (2021) “Optimization of Management Mode of Small- and Medium-Sized Enterprises Based on Decision Tree Model” 453–456. Xie, B., Lin, Z., Chen, J., Maizura, I. (2021) “Application of artificial intelligence computer control technology in management information system” Melecký, L., Staníčková, M. (2021) “Project Management Skills: Hard Versus Soft. Is It Enough? Technical Tools That Really Work” Jun, T. K., Ramiah, S. (2023) “Preliminary study: Professional Collaboration Application with Project Management Tools” 269–273. Stanimirovic, P., Borozan, T., Radojicic, M., Tomic, A. D. (2023) “Project Management Software Tools - One Step Closer to UN Sustainable Development Goals” Shanmugan, P., Kesavan, K., Senthilkumar, C., Shantharam, Y., Sivakaumar, C. T. (2022) "Need for metro rail system & Its planning using MSP", AIP Conference Proceedings. doi 160–164. Chowdhury, D., Gharami, P., Akter, J. (2019) “Implementing Advanced Software in Construction Project Management and Control” Li, Q., Jiang, M., Tao, S., Hao, J., and Chong, H.-Y. (2023) “The Integrated Problem of Construction Project Scheduling and Multiskilled Staff Assignment with Learning Effect”, J Constr Eng Manag 149 (8). doi Pirola, F., Boucher, X., Wiesner, S., Pezzotta, G. (2020) “Digital technologies in product-service systems: a literature review and a research agenda” Ahmad, T., Arif, F. (2021) “Open Source Project Management Software Evaluation: Application to an E-commerce Project” 142–151. Luong, H. H., Huynh, T. K. N., Dao, A. T., Nguyen, H. T. (2021) “An Approach for Project Management System Based on Blockchain” Raj, H., Punhani, R., Punhani, I. (2023) “A practical approach to visualizing different phases of project management using MSProject” 55–73. 851–859. 8322–8332. 012054. Silva, D., Gomes, A., Macieira, R., Silva, E., Soares, S. (2020) “Pah Pum: A project management tool based on TAKT PM” Yan, 10.1016/j.procs.2025.02.313_bib20 10.1016/j.procs.2025.02.313_bib15 10.1016/j.procs.2025.02.313_bib14 10.1016/j.procs.2025.02.313_bib17 10.1016/j.procs.2025.02.313_bib16 10.1016/j.procs.2025.02.313_bib11 10.1016/j.procs.2025.02.313_bib99 10.1016/j.procs.2025.02.313_bib10 10.1016/j.procs.2025.02.313_bib98 10.1016/j.procs.2025.02.313_bib13 10.1016/j.procs.2025.02.313_bib12 10.1016/j.procs.2025.02.313_bib19 10.1016/j.procs.2025.02.313_bib18 10.1016/j.procs.2025.02.313_bib95 10.1016/j.procs.2025.02.313_bib94 10.1016/j.procs.2025.02.313_bib97 10.1016/j.procs.2025.02.313_bib96 10.1016/j.procs.2025.02.313_bib91 10.1016/j.procs.2025.02.313_bib90 10.1016/j.procs.2025.02.313_bib93 10.1016/j.procs.2025.02.313_bib92 10.1016/j.procs.2025.02.313_bib88 10.1016/j.procs.2025.02.313_bib87 10.1016/j.procs.2025.02.313_bib89 10.1016/j.procs.2025.02.313_bib111 10.1016/j.procs.2025.02.313_bib40 10.1016/j.procs.2025.02.313_bib42 10.1016/j.procs.2025.02.313_bib41 10.1016/j.procs.2025.02.313_bib37 10.1016/j.procs.2025.02.313_bib36 10.1016/j.procs.2025.02.313_bib39 10.1016/j.procs.2025.02.313_bib38 10.1016/j.procs.2025.02.313_bib9 10.1016/j.procs.2025.02.313_bib33 10.1016/j.procs.2025.02.313_bib32 10.1016/j.procs.2025.02.313_bib35 10.1016/j.procs.2025.02.313_bib34 10.1016/j.procs.2025.02.313_bib5 10.1016/j.procs.2025.02.313_bib110 10.1016/j.procs.2025.02.313_bib6 10.1016/j.procs.2025.02.313_bib7 10.1016/j.procs.2025.02.313_bib8 10.1016/j.procs.2025.02.313_bib1 10.1016/j.procs.2025.02.313_bib2 10.1016/j.procs.2025.02.313_bib3 10.1016/j.procs.2025.02.313_bib4 10.1016/j.procs.2025.02.313_bib107 10.1016/j.procs.2025.02.313_bib106 10.1016/j.procs.2025.02.313_bib105 10.1016/j.procs.2025.02.313_bib104 10.1016/j.procs.2025.02.313_bib103 10.1016/j.procs.2025.02.313_bib102 10.1016/j.procs.2025.02.313_bib101 10.1016/j.procs.2025.02.313_bib100 10.1016/j.procs.2025.02.313_bib31 10.1016/j.procs.2025.02.313_bib30 10.1016/j.procs.2025.02.313_bib109 10.1016/j.procs.2025.02.313_bib108 10.1016/j.procs.2025.02.313_bib26 10.1016/j.procs.2025.02.313_bib25 10.1016/j.procs.2025.02.313_bib28 10.1016/j.procs.2025.02.313_bib27 10.1016/j.procs.2025.02.313_bib22 10.1016/j.procs.2025.02.313_bib21 10.1016/j.procs.2025.02.313_bib24 10.1016/j.procs.2025.02.313_bib23 10.1016/j.procs.2025.02.313_bib29 10.1016/j.procs.2025.02.313_bib62 10.1016/j.procs.2025.02.313_bib61 10.1016/j.procs.2025.02.313_bib64 10.1016/j.procs.2025.02.313_bib63 10.1016/j.procs.2025.02.313_bib60 10.1016/j.procs.2025.02.313_bib59 10.1016/j.procs.2025.02.313_bib58 10.1016/j.procs.2025.02.313_bib55 10.1016/j.procs.2025.02.313_bib54 10.1016/j.procs.2025.02.313_bib57 10.1016/j.procs.2025.02.313_bib56 10.1016/j.procs.2025.02.313_bib51 10.1016/j.procs.2025.02.313_bib50 10.1016/j.procs.2025.02.313_bib53 10.1016/j.procs.2025.02.313_bib52 10.1016/j.procs.2025.02.313_bib48 10.1016/j.procs.2025.02.313_bib47 10.1016/j.procs.2025.02.313_bib49 10.1016/j.procs.2025.02.313_bib44 10.1016/j.procs.2025.02.313_bib43 10.1016/j.procs.2025.02.313_bib46 10.1016/j.procs.2025.02.313_bib45 10.1016/j.procs.2025.02.313_bib84 10.1016/j.procs.2025.02.313_bib83 10.1016/j.procs.2025.02.313_bib86 10.1016/j.procs.2025.02.313_bib85 10.1016/j.procs.2025.02.313_bib80 10.1016/j.procs.2025.02.313_bib82 10.1016/j.procs.2025.02.313_bib81 10.1016/j.procs.2025.02.313_bib77 10.1016/j.procs.2025.02.313_bib76 10.1016/j.procs.2025.02.313_bib79 10.1016/j.procs.2025.02.313_bib78 10.1016/j.procs.2025.02.313_bib73 10.1016/j.procs.2025.02.313_bib72 10.1016/j.procs.2025.02.313_bib75 10.1016/j.procs.2025.02.313_bib74 10.1016/j.procs.2025.02.313_bib71 10.1016/j.procs.2025.02.313_bib70 10.1016/j.procs.2025.02.313_bib69 10.1016/j.procs.2025.02.313_bib66 10.1016/j.procs.2025.02.313_bib65 10.1016/j.procs.2025.02.313_bib68 10.1016/j.procs.2025.02.313_bib67 |
| References_xml | – reference: Głodziński, E., Szymborski, M. (2019) “Utilization of software supporting project management in middle and large project-based organizations: An empirical study in Poland”, – reference: Huang, R., Pu, H., Zou, L., and Shi, W. (2020) “Design of Multi-project Collaborative Management System”, – reference: . 143–152. – reference: : 73828–73842. – reference: Aishwarya, S., Muthu, D., Venkata, S. C. (2019) “Progress monitoring in a real time infrastructure projects”, – reference: Assaad, R. H., El-Adaway, I. H., Hastak, M., Needy, K. L. S. (2021) “Smart and Emerging Technologies: Shaping the Future of the Industry and Offsite Construction”, – reference: : 347–353. – reference: CCIS: 310–326. – reference: Hu, F. (2020) “The application of information system in the management of university’s repair project”, – reference: : 1817–1825. – reference: Castro-Maldonado, J. J., Londoño-Gallego, J. A., Londoño-Marin, S., Patiño-Murillo, J. A. (2019) “Implementation of a technological, information, and communication tool for project management in the network of Tecnoparque, Colombia”, – reference: Yehorchenkova, N., Teslia, I., Yehorchenkov, O. (2020) “Method of project and operational processes integration in the activities of project-oriented enterprises based on functional 4Р-environment”, – reference: Gusnawan, R., Lubis, M. (2023) “Web-Based Village Bridge and Road Project Monitoring Information System”, – reference: : 912–915. – reference: Badiru, A. B. (2019) “Project Management: Systems, Principles, and Applications”, Second Edition, CRC Press. – reference: Atmika, I. M. B., Wahyuni, P. I., Sinarta, I. N. (2023) “Implementation of construction management system based on information technology (IT) and integrated towards digital construction in industry 4.0”, – reference: Soleh, O., Rosdiana, Dewi, M. A., Ningsih, Y. F. (2020) “Utilization of Information System in Electrical Panel Project Management to Provide Various Facility in Project Implementation”, – reference: Chunyi, L. (2023) “Power Engineering Construction Management Information System Based on Data Mining Algorithm”, – reference: Mikkelsen, M. F., Aaltonen, K. (2023) “IT-enabled management of project complexity – An Action Design Research project”, – reference: Shanmugan, P., Kesavan, K., Senthilkumar, C., Shantharam, Y., Sivakaumar, C. T. (2022) “Need for metro rail system & Its planning using MSP”, – reference: : 780–790. – reference: 69–74. – reference: : 160–164. – reference: : 180–185. – reference: : 40–43. – reference: : 449–459. – reference: : 743–747. – reference: Stanimirovic, P., Borozan, T., Radojicic, M., Tomic, A. D. (2023) “Project Management Software Tools - One Step Closer to UN Sustainable Development Goals”, – reference: Pedrosa, J., Varajão, J., Magalhães, L., and Martinho, R. (2021) “Process Mining for IS Project Success Factors Management: A proposal” – reference: Owolabi, O. A. et al. (Year not specified) “Utilization of Social Management Theoretical Framework and Program Management Tool to Successfully Manage Large Multi-Department STEM Projects”, – reference: : 131–136. – reference: Teslia, I. et al. (2023) “Development of the Concept of Intelligent Add-On over Project Planning Instruments”, – reference: : 55–73. – reference: Bošnjak, A., Majstorovic, V. (2020) “Practical application of contemporary project management software”, – reference: Aziz, M., Ghuzdewan, T. (2023) “Evaluation of a construction management software: ‘Progresi’”, – reference: Churacharit, C., Chutima, P. (2022) “An Integration of Project Management Body of Knowledge and Project Management Information System to Improve On-time Deliverable of Liquefied Natural Gas Station Construction Projects”, – reference: Dehao, G. (2020) “Analysis and improvement of construction project management system based on network information”, – reference: Harshavardhan, T., Reddy, V. S., Vardhani, P. S. R. P. S. S. S., Shrihari, S., Alawadi, A. H. R., Sharma, S. D. (2023) “Resource Allocation, Scheduling and Planning of a Multi Storeyed Residential Building”, – reference: Kock, A., Schulz, B., Kopmann, J., Gemünden, H. G. (2020) “Project portfolio management information systems’ positive influence on performance – the importance of process maturity”, – reference: Alvanchi, A., Shiri, N., Alikhani, H. (2020) “In-depth investigation of project planning and control software package application in the construction industry of Iran”, – reference: Project Management Institute. (2021). A guide to the Project Management Body of Knowledge (PMBOK guide) (7th ed.). – reference: Choi, J., Ha, M. (2022) “Validation of project management information systems for industrial construction projects”, – reference: Irfan, M., Hassan, M., Hassan, N., Habib, M., Khan, S., Nasruddin, A. M. (2020) “Project Management Maturity and Organizational Reputation: A Case Study of Public Sector Organizations”, – reference: Santoso, F., Widyani, Y. (2021) “EssenceProject: Software Project Planning Tools based on OMG’s Essence”, – reference: Diao, Y., Zhang, Q. (2021) “Optimization of Management Mode of Small- and Medium-Sized Enterprises Based on Decision Tree Model”, – reference: : 11–20. – reference: Aljebory, K. M., QaisIssam, M. (2019) “Developing AI Based Scheme for Project Planning by Expert Merging Revit and Primavera Software”, – reference: Zhang, K., Zhang, X. (2021) “Research on the overall architecture design of project management information system based on SOA”, – reference: : 1814–1824. – reference: Pavlíčková, P., Brožová, H., Rydval, J., Havlíček, J., Šubrt, T. (2021) “New MS Project Add-in for Task Threatness Evaluation”, – reference: , – reference: : 198–206. – reference: : 144–150. – reference: Panakala Rao, K. L. N., Chamberlin, K. S. (2019) “Resources optimization in construction of a residential apartment by using primavera: A Case Study”, – reference: Vărzaru, A. A. (2022) “An Empirical Framework for Assessing the Digital Technologies Users’ Acceptance in Project Management” – reference: Haloul, M. I. K., Mohd Ariffin, M. K. A., Supeni, E. E., Ahmad, S. A. B., Bilema, M., Ahmad, M. (2024) “A Systematic Review of the Project Management Information Systems in Different Types of Construction Projects”, – reference: : 295–310. – reference: Shanmugan, P., Kesavan, K., Senthilkumar, C., Shantharam, Y., Sivakaumar, C. T. (2022) "Need for metro rail system & Its planning using MSP", AIP Conference Proceedings. doi: – reference: : 851–859. – reference: Garyaeva, V., Garyaev, A., Parfenov, S. (2023) “Automation of the process of coordinating project work”, – reference: Purohit, A., Chopra, G., Dangwal, P. G. (2022) “Measuring the Effectiveness of the Project Management Information System (PMIS) on the Financial Wellness of Rural Households in the Hill Districts of Uttarakhand, India: An IS-FW Model”, – reference: Piñero Ramírez, P. E., Pérez Pupo, I., Piñero Pérez, P. Y., Marquez Ruiz, Y., Fustiel Alvarez, Y. (2022) “A Software Ecosystem for Project Management in BIM Environments Assisted by Artificial Intelligent Techniques” – reference: Chowdhury, D., Gharami, P., Akter, J. (2019) “Implementing Advanced Software in Construction Project Management and Control”, – reference: Miranda, S., Sugarindra, M. (2019) “Utilizing project management software in project scheduling: A case study”, – reference: Narlawar, G. S., Chaphalkar, N. B., Sandbhor, S. (2019) “Application of primavera software in management of construction project: A review”, – reference: Tsurkan, M. V., Liubarskaia, M. A., Chekalin, V. S., Mironova, S. M., Artemiev, A. A. (2020) “Information Systems for Project Management in the Public Sector”, – reference: : 474–477. – reference: Fadillah, A. P., Fitriana, D. (2019) “Design of Project Data Management Information System – reference: , 641–654. – reference: : 367–376. – reference: : 381–388. – reference: Gejo-García, J., Gallego-García, S., García-García, M. (2022) “Project Design and Management of Optimized Self-Protection Plans: A Case Study for Spanish Public Buildings”, – reference: Tulupov, M. A. (2020) “Methodology for Constructing a Project Management Information System Based on the Enterprise Application Integration”, – reference: : 877–888. – reference: Martínez, P. Q., Puyén, R. C. (2021) “Design of a Project Monitoring and Control System based on the Earned Value Management Technique to Improve the Management of Institutional Projects in a Microfinance Entity in Trujillo, 2020”, – reference: Warinda, E. (2019) “Evaluating operationalisation of integrated monitoring and evaluation system in Kisumu County: Implications for policy makers”, – reference: Abrantes, R., and Figueiredo, J. (2021) “Information systems and change in project based organizations”, – reference: : 53–65. – reference: : 787–794. – reference: : 149–161. – reference: Jimenez-Barros, M. A., Ramirez Rios, D. G., Ardila Hernandez, C. J., Castro Bolaño, L. J., Neira Rodado, D. (2020) “Design of a Decision Support System for Multiobjective Activity Planning and Programming Using Global Bacteria Optimization”, – reference: Ali, N. H. M., et al. (2021) “Agile Project Management Software for Construction and Management Industries” – reference: Corrigan, M. J., van der Poll, J. A., Mtsweni, E. S. (2019) “The project management information system as enabler for ICT4D achievement at capability maturity level 2 and above”, – reference: Teslia, I. et al. (2022) “Development of the concept of construction of the project management information standard on the basis of the Primadoc information management system”, – reference: Zhao, P. (2021) “Engineering Management Information System Based on Adaptive Ant Colony Algorithm”, – reference: Ledenev, M., and Shashkin, A. (2022) “Project Management System Tools Based on Approximate Information Models”, in Proceedings of – reference: : 453–456. – reference: Huang, X., Huang, J., Ao, Z., Cui, Y. (2023) “Research on application software architecture under the project management informatization of power grid enterprises”, – reference: Teslia, I., Khlevna, I., Yehorchenkov, O., Zaspa, H., Khlevnyi, A. (2021) “The concept of integrated information technology of enterprises project activities management implementation”, – reference: 1–6. – reference: 30 – reference: Shah, P., Chandragade, A. A. (2023) “Application of project management tool in construction for Planning, Scheduling and Optimization”, – reference: : 103301. – reference: Fachrizal, M. R., Wibawa, J. C., Afifah, Z. (2020) “Web-Based Project Management Information System in Construction Projects”, – reference: 332–337. – reference: : 269–273. – reference: Goldstein, M., Eliezer, O. (2024) “A Software Package (in progress) that Implements the Hammock-EFL Methodology”, – reference: Pirola, F., Boucher, X., Wiesner, S., Pezzotta, G. (2020) “Digital technologies in product-service systems: a literature review and a research agenda”, – reference: Chadegani, A. A. et al. (2013) “A Comparison between Two Main Academic Literature Collections: Web of Science and Scopus Databases”, – reference: Jun, T. K., Ramiah, S. (2023) “Preliminary study: Professional Collaboration Application with Project Management Tools”, – reference: Melecký, L., Staníčková, M. (2021) “Project Management Skills: Hard Versus Soft. Is It Enough? Technical Tools That Really Work”, – reference: Alves, P. R., Tereso, A., Fernandes, G. (2019) "Project management system implementation in SMEs: A case study", – reference: Retnowardhani, A., Suroso, J. S. (2019) “Project Management Information Systems (PMIS) for Project Management Effectiveness: Comparison of Case Studies”, – reference: LNCS: 235–238. – reference: : 183–188. – reference: Lukianov, D., Mazhei, K., Gogunskii, V., Kolesnikov, O. (2021) “Transformation Digital Competence Area in the Competence Model of Project Managers”, – reference: Al-Nakeeb, A., El Khatib, M., Abu Zitar, R., Alhosani, A., Alhosani, I. (2023) “Project Manager’s Role in Manage Project Knowledge Process: An Approach to Enhance Project Quality”, – reference: 693–697. – reference: Silva, D., Gomes, A., Macieira, R., Silva, E., Soares, S. (2020) “Pah Pum: A project management tool based on TAKT PM”, – reference: Wach, M., Chomiak-Orsa, I. (2019) “Improvement of investment processes in mining company by implementation of project management system”, – reference: Ou, J., Yuan, J., Tian, J., Zhang, W., Cao, W., Bai, K. (2021) “Research on Early Warning System of Consulting Risk for Power Engineering Project”, – reference: Mukhamadiev, R., Staroverova, N., Shustrova, M. (2020) “Specifics of Project Management System Development for Large Organizations”, – reference: : 141–164. – reference: Raj, H., Punhani, R., Punhani, I. (2023) “A practical approach to visualizing different phases of project management using MSProject”, – reference: LNCS: 158–171. – reference: : 1582–1586. – reference: : 1924–1932. – reference: Yan, Z., Wei, G., Dongdong, L., Lei, N., Mengran, Y. (2020) “University Research Project Management System Based on Cloud Platform”, – reference: Li, C., Zhang, S. Y., Na, J. S., Yue, L. (2022) “Design and Implementation of Project Management System Based on Vue3.0 Framework”, – reference: Schimanski, C. P., Monizza, G. P., Marcher, C., Matt, D. T. (2019) “Conceptual foundations for a new lean BIM-based production system in construction”, – reference: : 142–151. – reference: Ahmad, T., Arif, F. (2021) “Open Source Project Management Software Evaluation: Application to an E-commerce Project”, – reference: Li, Q., Jiang, M., Tao, S., Hao, J., and Chong, H.-Y. (2023) “The Integrated Problem of Construction Project Scheduling and Multiskilled Staff Assignment with Learning Effect”, J Constr Eng Manag 149 (8). doi: – reference: Gao, Z. (2023) “Development and application of web information system in enterprise management under SSH framework”, – reference: AL-Zubaidi, E. D. A. (2019) “Project management information system effect decision making in the construction industry of Iraq”, – reference: Alam, S. (2019) “An Innovative Project Management System”, – reference: Mohammed, A., Al Busaeedi, N., Mohamed, A. A., Saud, S. (2022) “Smart Project Management System (SPMS) - An Integrated and Predictive Solution for Proactively Managing Oil & Gas client Projects”, – reference: Ren, Y. et al. (2020) “Discussion and Research on informatization of Power Grid Infrastructure Project management”, – reference: Xie, B., Lin, Z., Chen, J., Maizura, I. (2021) “Application of artificial intelligence computer control technology in management information system”, – reference: Abdel-Khalek, H. A., Aziz, R. F., Abdellatif, I. A. (2019) “Prepare and analysis for claims in construction projects using Primavera Contract Management (PCM)”, – reference: : 386–390. – reference: Yehorchenkova, N., Yehorchenkov, O., Teslia, I., Kataieva, Y., Mitsenko, S. (2020) “The Concept of an Add-On of a Functional Portfolio and Project Management Environment”, – reference: Blaga, F. S., Pop, A., Hule, V., Karczis, A., Buzdugan, D. (2021) “Using critical path method for a new project scheduling - The case of a new product launch in production”, – reference: : 404–412. – reference: : 757–760. – reference: Teslia, I., Klevanna, G. (2022) “Development of a Reflective Intelligent Project Planning System”, – reference: : 8322–8332. – reference: ): 53–65. – reference: Salama, T., Salah, A., Moselhi, O. (2019) “Integrated scheduling of modular construction using mod-scheduler”, – reference: Ottaviani, F. M., Rebuglio, M., and De Marco, A. (2023) “Project management information system data model development and explanation", in – reference: : 2046–2057. – reference: : 773–779. – reference: : 184–187. – reference: : 229–241. – reference: Amarasekara, T. N. E., Isurindi, H. G. P., Navanjana, E. H. D. T. D., Gamage, O. M., Samarakoon, U., Kugathasan, A. (2021) “Project Zone: An Advanced Undergraduate Project Management System For Software Development”, – reference: : 100014. – reference: : 012054. – reference: Yanzheng, W. (2021) “Design and application of information system and technology in business management: Take the design of the Chengdu Panda Park project as an example”, – reference: Jally, V., Kulkarni, V. N., Gaitonde, V. N., Satis, G. J., Kotturshettar, B. B. (2021) “A review on project management transformation using industry 4.0”, – reference: Naik, N., Jenkins, P. (2019) “A web based method for managing PRINCE2® projects using trello®”, – reference: 47–55. – reference: : 465–493. – reference: Weiss, C., Keckeis, J. (2020) “Procedural model for selecting enterprise systems based on project management software", – reference: Yan, Y., Song, Y., Zhang, X., Ai, L. (2021) “Research on the construction of project management information system based on multi-tier architecture”, – reference: : 1577–1581. – reference: : 1–5. – reference: : 425–439. – reference: : 487–497. – reference: Zulfiandri, Yasmin, F. D., and Kusumaningtyas, R. H. (2022) “Implementation of Critical Path Method and What If Analysis in Project Management Information System” in – reference: Lauth, E., Scholz, S. G. (2023) “Introduction and Evaluation of a Project Management Software Tool in the Context of the Administration of Science and Research Projects”, – reference: Baharom, M. A. A., Rahman, M. S. A., Sabudin, A. R., Nor, M. F. M. (2023) “Decision Support Tools: Machine Learning Application in Smart Planner”, – reference: 101–111. – reference: Luong, H. H., Huynh, T. K. N., Dao, A. T., Nguyen, H. T. (2021) “An Approach for Project Management System Based on Blockchain”, – reference: , 1305.0377. – reference: : 357–361. – reference: Yehorchenkova, N., Yehorchenkov, O., Sazonov, A. (2021) “Project management information systems: An experience of developing and implementation on a production enterprise. Case study”, – reference: . – reference: Haas, O., Markovič, P. (2023) “Management Information System of the Critical Path of Construction Projects by Way of Example Berlin Brandenburg Airport (BER)”, – reference: Nyandongo, K. M., Lubisi, J. (2019) “Assessing the use of project management information systems and its impact on project outcome”, – reference: Muttaqin, F., Akbar, F. A., Mandyartha, E. P., Prasetya, L. M. I. (2020) “Development project management information systems at Unicode Indonesia”, – reference: : 389–396. – reference: Pratama, I. N., Dachyar, M., Pratama, N. R. (2023) “Optimization of Resource Allocation and Task Allocation with Project Management Information Systems in Information Technology Companies”, – reference: : 87–105. – reference: : 240–247. – reference: Santy, Magdalena, Y. (2022) “Project Management SaaS Feature Framework for MSMEs in Indonesia”, – reference: 1 ( – reference: Lima, R., Tereso, A., Faria, J. (2019) "Project management under uncertainty: Resource flexibility visualization in the schedule", – reference: Micale, R., La Fata, C. M., Lombardo, A., La Scalia, G. (2021) “Project management information systems (Pmiss): A statistical-based analysis for the evaluation of software packages features”, – ident: 10.1016/j.procs.2025.02.313_bib67 doi: 10.1088/1755-1315/769/4/042014 – ident: 10.1016/j.procs.2025.02.313_bib74 – ident: 10.1016/j.procs.2025.02.313_bib23 doi: 10.1007/978-3-030-11235-6_19 – ident: 10.1016/j.procs.2025.02.313_bib43 doi: 10.2118/210877-MS – ident: 10.1016/j.procs.2025.02.313_bib10 doi: 10.4186/ej.2022.26.1.55 – ident: 10.1016/j.procs.2025.02.313_bib45 – ident: 10.1016/j.procs.2025.02.313_bib80 doi: 10.1201/9780429320774-6 – ident: 10.1016/j.procs.2025.02.313_bib97 – ident: 10.1016/j.procs.2025.02.313_bib49 doi: 10.1007/978-3-030-47679-3_14 – ident: 10.1016/j.procs.2025.02.313_bib21 doi: 10.5829/ije.2020.33.10a.01 – ident: 10.1016/j.procs.2025.02.313_bib36 doi: 10.1016/j.procs.2019.12.197 – ident: 10.1016/j.procs.2025.02.313_bib59 doi: 10.1109/AHPCAI57455.2022.10087744 – ident: 10.1016/j.procs.2025.02.313_bib88 doi: 10.1051/e3sconf/202339101217 – ident: 10.1016/j.procs.2025.02.313_bib18 – ident: 10.1016/j.procs.2025.02.313_bib47 doi: 10.1051/e3sconf/202342901010 – ident: 10.1016/j.procs.2025.02.313_bib6 doi: 10.1080/13467581.2021.1941999 – ident: 10.1016/j.procs.2025.02.313_bib30 doi: 10.1109/ICIMTech55957.2022.9915140 – ident: 10.1016/j.procs.2025.02.313_bib8 doi: 10.1007/978-981-16-8062-5_21 – ident: 10.1016/j.procs.2025.02.313_bib46 doi: 10.1007/978-3-031-49252-5_19 – ident: 10.1016/j.procs.2025.02.313_bib20 doi: 10.1016/j.ijproman.2020.05.001 – ident: 10.1016/j.procs.2025.02.313_bib65 doi: 10.1155/2021/2815086 – ident: 10.1016/j.procs.2025.02.313_bib70 doi: 10.1109/ICBDIE50010.2020.00112 – ident: 10.1016/j.procs.2025.02.313_bib63 doi: 10.1109/ICNETIC59568.2023.00014 – ident: 10.1016/j.procs.2025.02.313_bib25 – ident: 10.1016/j.procs.2025.02.313_bib68 doi: 10.1007/978-3-030-97269-1_11 – ident: 10.1016/j.procs.2025.02.313_bib7 doi: 10.1063/5.0057988 – ident: 10.1016/j.procs.2025.02.313_bib37 doi: 10.15587/1729-4061.2022.253299 – ident: 10.1016/j.procs.2025.02.313_bib108 doi: 10.1109/CITSM56380.2022.9935912 – ident: 10.1016/j.procs.2025.02.313_bib16 doi: 10.5539/ass.v9n5p18 – ident: 10.1016/j.procs.2025.02.313_bib34 – ident: 10.1016/j.procs.2025.02.313_bib35 doi: 10.1109/FarEastCon50210.2020.9271201 – ident: 10.1016/j.procs.2025.02.313_bib76 – ident: 10.1016/j.procs.2025.02.313_bib39 doi: 10.1109/ICIMTech.2019.8843768 – ident: 10.1016/j.procs.2025.02.313_bib3 doi: 10.1016/j.ijproman.2020.05.001 – ident: 10.1016/j.procs.2025.02.313_bib62 doi: 10.55267/iadt.07.13841 – ident: 10.1016/j.procs.2025.02.313_bib29 doi: 10.1109/DeSE58274.2023.10099939 – ident: 10.1016/j.procs.2025.02.313_bib48 doi: 10.1109/ICEDCS60513.2023.00070 – ident: 10.1016/j.procs.2025.02.313_bib41 doi: 10.1109/ISSE46696.2019.8984516 – ident: 10.1016/j.procs.2025.02.313_bib28 doi: 10.1109/ICECCME57830.2023.10252628 – ident: 10.1016/j.procs.2025.02.313_bib101 doi: 10.1007/s10559-020-00281-2 – ident: 10.1016/j.procs.2025.02.313_bib24 doi: 10.3390/su142113862 – ident: 10.1016/j.procs.2025.02.313_bib57 doi: 10.1109/ICter53630.2021.9774820 – ident: 10.1016/j.procs.2025.02.313_bib50 doi: 10.1088/1742-6596/1641/1/012054 – ident: 10.1016/j.procs.2025.02.313_bib89 doi: 10.4018/978-1-6684-5255-4.ch001 – ident: 10.1016/j.procs.2025.02.313_bib56 doi: 10.1109/ITME53901.2021.00011 – ident: 10.1016/j.procs.2025.02.313_bib85 – ident: 10.1016/j.procs.2025.02.313_bib52 doi: 10.1145/3422392.3422504 – ident: 10.1016/j.procs.2025.02.313_bib103 doi: 10.1007/978-3-030-25128-4_96 – ident: 10.1016/j.procs.2025.02.313_bib110 doi: 10.1016/j.procs.2021.01.184 – ident: 10.1016/j.procs.2025.02.313_bib4 doi: 10.15587/1729-4061.2022.253299 – ident: 10.1016/j.procs.2025.02.313_bib64 doi: 10.1109/ICMTMA50254.2020.00153 – ident: 10.1016/j.procs.2025.02.313_bib83 doi: 10.1016/j.matpr.2022.11.446 – ident: 10.1016/j.procs.2025.02.313_bib33 doi: 10.2507/31st.daaam.proceedings.119 – ident: 10.1016/j.procs.2025.02.313_bib66 doi: 10.1088/1757-899X/662/2/022014 – ident: 10.1016/j.procs.2025.02.313_bib98 doi: 10.24928/2019/0106 – ident: 10.1016/j.procs.2025.02.313_bib12 doi: 10.1061/9780784483893.097 – ident: 10.1016/j.procs.2025.02.313_bib96 – ident: 10.1016/j.procs.2025.02.313_bib91 doi: 10.1063/5.0076283 – ident: 10.1016/j.procs.2025.02.313_bib55 – ident: 10.1016/j.procs.2025.02.313_bib111 doi: 10.1007/978-981-16-0742-4_7 – ident: 10.1016/j.procs.2025.02.313_bib78 – ident: 10.1016/j.procs.2025.02.313_bib99 doi: 10.1007/978-981-19-1939-8_58 – ident: 10.1016/j.procs.2025.02.313_bib69 doi: 10.1145/3482632.3483995 – ident: 10.1016/j.procs.2025.02.313_bib11 doi: 10.1109/ACCESS.2020.2988511 – ident: 10.1016/j.procs.2025.02.313_bib13 doi: 10.1109/ICOMITEE.2019.8921046 – ident: 10.1016/j.procs.2025.02.313_bib32 doi: 10.1109/ComTech52583.2021.9616886 – ident: 10.1016/j.procs.2025.02.313_bib92 doi: 10.1063/5.0076283 – ident: 10.1016/j.procs.2025.02.313_bib31 doi: 10.3390/app112311233 – ident: 10.1016/j.procs.2025.02.313_bib44 doi: 10.1088/1742-6596/1639/1/012091 – ident: 10.1016/j.procs.2025.02.313_bib26 doi: 10.21533/pen.v7i4.942 – ident: 10.1016/j.procs.2025.02.313_bib75 doi: 10.1016/j.aej.2019.05.001 – ident: 10.1016/j.procs.2025.02.313_bib73 doi: 10.1109/CSIT49958.2020.9322051 – ident: 10.1016/j.procs.2025.02.313_bib100 doi: 10.1145/3482632.3483996 – ident: 10.1016/j.procs.2025.02.313_bib71 doi: 10.1109/ICESIT53460.2021.9696613 – ident: 10.1016/j.procs.2025.02.313_bib93 doi: 10.1007/978-3-031-27506-7_18 – ident: 10.1016/j.procs.2025.02.313_bib94 doi: 10.1088/1757-899X/1009/1/012005 – ident: 10.1016/j.procs.2025.02.313_bib84 doi: 10.1088/1742-6596/1418/1/012014 – ident: 10.1016/j.procs.2025.02.313_bib95 doi: 10.1109/CIBDA50819.2020.00112 – ident: 10.1016/j.procs.2025.02.313_bib54 doi: 10.1109/ICoDSE53690.2021.9648477 – ident: 10.1016/j.procs.2025.02.313_bib27 doi: 10.1051/e3sconf/202338909021 – ident: 10.1016/j.procs.2025.02.313_bib77 doi: 10.4102/aej.v7i1.385 – ident: 10.1016/j.procs.2025.02.313_bib14 – ident: 10.1016/j.procs.2025.02.313_bib87 – ident: 10.1016/j.procs.2025.02.313_bib40 doi: 10.1109/SSD.2019.8893274 – ident: 10.1016/j.procs.2025.02.313_bib79 doi: 10.1088/1757-899X/528/1/012037 – ident: 10.1016/j.procs.2025.02.313_bib109 – ident: 10.1016/j.procs.2025.02.313_bib105 doi: 10.5220/0012052200003546 – ident: 10.1016/j.procs.2025.02.313_bib53 – ident: 10.1016/j.procs.2025.02.313_bib102 doi: 10.1007/978-3-030-29586-8_52 – ident: 10.1016/j.procs.2025.02.313_bib90 doi: 10.1007/978-981-19-9205-6_2 – ident: 10.1016/j.procs.2025.02.313_bib22 doi: 10.1016/j.procs.2019.12.198 – ident: 10.1016/j.procs.2025.02.313_bib5 doi: 10.18421/TEM123-65 – ident: 10.1016/j.procs.2025.02.313_bib19 – ident: 10.1016/j.procs.2025.02.313_bib38 – ident: 10.1016/j.procs.2025.02.313_bib60 doi: 10.1007/978-981-19-7660-5_32 – ident: 10.1016/j.procs.2025.02.313_bib104 doi: 10.1061/JCEMD4.COENG-13150 – ident: 10.1016/j.procs.2025.02.313_bib82 doi: 10.3390/app12094401 – ident: 10.1016/j.procs.2025.02.313_bib106 doi: 10.1109/SUMMA57301.2022.9973960 – ident: 10.1016/j.procs.2025.02.313_bib42 doi: 10.1088/1757-899X/879/1/012064 – ident: 10.1016/j.procs.2025.02.313_bib61 doi: 10.1007/978-3-031-35467-0_10 – ident: 10.1016/j.procs.2025.02.313_bib17 doi: 10.1109/SIST50301.2021.9465900 – ident: 10.1016/j.procs.2025.02.313_bib58 – ident: 10.1016/j.procs.2025.02.313_bib1 – ident: 10.1016/j.procs.2025.02.313_bib9 – ident: 10.1016/j.procs.2025.02.313_bib81 doi: 10.1108/IJMPB-09-2021-0229 – ident: 10.1016/j.procs.2025.02.313_bib72 doi: 10.1145/3483794.3483815 – ident: 10.1016/j.procs.2025.02.313_bib15 doi: 10.1016/j.compind.2020.103301 – ident: 10.1016/j.procs.2025.02.313_bib51 doi: 10.1109/ITIS50118.2020.9321070 – ident: 10.1016/j.procs.2025.02.313_bib86 doi: 10.1063/5.0146372 – ident: 10.1016/j.procs.2025.02.313_bib107 doi: 10.3390/electronics11233872 – ident: 10.1016/j.procs.2025.02.313_bib2 doi: 10.1201/9780429282829 |
| SSID | ssj0000388917 |
| Score | 2.342529 |
| Snippet | This paper presents a systematic scientific literature review of software in Project Management over the past five years. Through keyword-based research and... |
| SourceID | crossref elsevier |
| SourceType | Index Database Publisher |
| StartPage | 1739 |
| SubjectTerms | Project Management Project Management Information System Project Management Software Systematic Literature Review |
| Title | Project Management Information Systems: a Systematic Review |
| URI | https://dx.doi.org/10.1016/j.procs.2025.02.313 |
| Volume | 256 |
| hasFullText | 1 |
| inHoldings | 1 |
| isFullTextHit | |
| isPrint | |
| journalDatabaseRights | – providerCode: PRVHPJ databaseName: ROAD: Directory of Open Access Scholarly Resources customDbUrl: eissn: 1877-0509 dateEnd: 99991231 omitProxy: false ssIdentifier: ssj0000388917 issn: 1877-0509 databaseCode: M~E dateStart: 20100101 isFulltext: true titleUrlDefault: https://road.issn.org providerName: ISSN International Centre |
| link | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1LTxsxELYi6KGXAn2otAX5wC1dadeO1-v2VPG8gJBKJW4r27srbdRuUEgjxKF_oX-5M7b3AY0QHLisEktxEn9fZmYn880QshdrkYLRK6KimJQReIg4ytLERKkpgT4V11oZN2xCnp1ll5fqfDT622phlj9l02Q3N-rqWaGGNQAbpbNPgLvbFBbgMYAOV4Adro8C_tznVgaFLeOgOfLGwbco9yLn730f58GfBNNuI4u6Eld2jpMfxsFd9lls-EH9mgWUIBD3NV0uDw0m9LZ246LGx1jv2jR1l89dLPSy9rOkxkeYz7maoWao7jzEAQ5EmtugwMHS79kwO-E1zMGUZlJG2F3Ge5oVa8H-MjG0oInkauCN4YZJrrT0PukwRT9jse06E9h7lXth692-2vf8XVeF2Ba4TXO3SY6b5DHLOU5BXmdSKKwRPP3TJ-2wdY5yU5y7b9J2snI1g_99mNXRziCCudgkr8KtB_3mKbNFRmXzmmy0Yz1osPJvyNfAINoziA4YRAODvlBNe_5Qz5-35MfR4cX-SRRmbEQWgj0elaqqdKbTVFtRGG2UsILHJpa2yJhVrJokpTJGZtzIiqlEQfiZJGYiWCU5BN_8HVlrZk35nlANsXsVp6U0Op5wq7JEWiZTJTTjYOmTbfK5PQs4cNdKJX8Agm2StueVB3r7KC8HCjz0wg9Pe5-P5CU-82m1T2RtMf9d7pAXdrmor-e7Dv9_3jCBiw |
| linkProvider | ISSN International Centre |
| openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Project+Management+Information+Systems%3A+a+Systematic+Review&rft.jtitle=Procedia+computer+science&rft.au=Massimo%2C+Rebuglio&rft.au=Zenezini%2C+Giovanni&rft.au=Ottaviani%2C+Filippo+Maria&rft.au=De+Marco%2C+Alberto&rft.date=2025&rft.issn=1877-0509&rft.eissn=1877-0509&rft.volume=256&rft.spage=1739&rft.epage=1747&rft_id=info:doi/10.1016%2Fj.procs.2025.02.313&rft.externalDBID=n%2Fa&rft.externalDocID=10_1016_j_procs_2025_02_313 |
| thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1877-0509&client=summon |
| thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1877-0509&client=summon |
| thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1877-0509&client=summon |