Note on Program Uncertainty in the Dynamic Programming Problem
In this note we study the dynamic inventory problem for a follow-on provisioning in which the program length is subject to uncertainty with a known distribution. It is shown that under rather general cost conditions, the optimal policy is of the (S, s) type. This is true whether or not there exists...
Gespeichert in:
| Veröffentlicht in: | Econometrica Jg. 30; H. 2; S. 336 - 342 |
|---|---|
| 1. Verfasser: | |
| Format: | Journal Article |
| Sprache: | Englisch |
| Veröffentlicht: |
Menasha, Wis
The Econometric Society
01.04.1962
George Banta Pub. Co. for the Econometric Society Blackwell Publishing Ltd |
| Schlagworte: | |
| ISSN: | 0012-9682, 1468-0262 |
| Online-Zugang: | Volltext |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| Zusammenfassung: | In this note we study the dynamic inventory problem for a follow-on provisioning in which the program length is subject to uncertainty with a known distribution. It is shown that under rather general cost conditions, the optimal policy is of the (S, s) type. This is true whether or not there exists a time lag in delivery provided that excess demand is always backlogged. The case of an infinite program horizon is also briefly discussed. |
|---|---|
| Bibliographie: | ObjectType-Article-2 SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 ObjectType-Article-1 |
| ISSN: | 0012-9682 1468-0262 |
| DOI: | 10.2307/1910222 |