Enhanced Construction Project Duration Estimation Using Artificial Neural Networks: Initial Design and Planning Stages. |
| Authors: |
Al-Attar, Heba1 attarheba97@gmail.com, Sweis, Ghaleb1 gsweis@ju.edu.jo, Tarawneh, Bashar1 btarawneh@ju.edu.jo, Abu-Khader, Waleed2 abukhaderw@merrimack.edu, Haddad, Leen3 leenhaddad@email.arizona.edu, Sweis, Rateb4 r.sweis@ju.edu.jo |
| Source: |
Construction Economics & Building. Jul2025, Vol. 25 Issue 2, p168-191. 24p. |
| Subject Terms: |
*ARTIFICIAL neural networks, *STAKEHOLDER analysis, *BUILDING design & construction, *DATA analysis, CONSTRUCTION planning, CONSTRUCTION industry forecasting, CONCEPTUAL design, STATISTICAL accuracy |
| Geographic Terms: |
JORDAN |
| Abstract: |
Maintaining efficiency and quality control during the early phases of construction projects depends on accurate duration estimation. However, because there is not enough data available in the initial stages of project planning, traditional methodologies suffer. To address these challenges, this study presents an innovative approach using artificial neural networks (ANNs) through Python. This method offers reliable predictions for early-stage duration estimation. ANN models were created and validated with 53 design parameters using data from 100 different construction projects in Jordan. Furthermore, the study refined the models to 43 parameters using a questionnaire-driven approach. The average duration estimation accuracy of the ANN models was 90% during the initial stage and 95% during the planning stage, demonstrating their great accuracy. Its uniqueness comes in its application of ANN to early-stage building, an area that has not been extensively studied in the literature to date, and in its demonstration that reliable predictions may be generated in the absence of abundant data. This study demonstrates ANN’s effectiveness in enhancing early-stage construction planning by providing stakeholders with a more accurate duration estimation tool than traditional methods. The findings contribute significantly to improving decision-making and project planning in the early phases. [ABSTRACT FROM AUTHOR] |
|
Copyright of Construction Economics & Building is the property of University of Technology, Sydney and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) |