APA (7th ed.) Citation

Ge, X., Zhang, L., & Wang, C. (2013). Mixed integer model for multi-objective short-term cascaded hydropower optimal scheduling. Dianli Xitong Baohu yu Kongzhi, 41(4), 55-60.

Chicago Style (17th ed.) Citation

Ge, Xiao-Lin, Li-Zi Zhang, and Chun-Li Wang. "Mixed Integer Model for Multi-objective Short-term Cascaded Hydropower Optimal Scheduling." Dianli Xitong Baohu Yu Kongzhi 41, no. 4 (2013): 55-60.

MLA (9th ed.) Citation

Ge, Xiao-Lin, et al. "Mixed Integer Model for Multi-objective Short-term Cascaded Hydropower Optimal Scheduling." Dianli Xitong Baohu Yu Kongzhi, vol. 41, no. 4, 2013, pp. 55-60.

Warning: These citations may not always be 100% accurate.