Yanai, S., & Fujie, T. (2006). A three-machine permutation flow-shop problem with minimum makespan on the second machine. Journal of the Operational Research Society, 57, 460-468. https://doi.org/10.1057/palgrave.jors.2602014
Citace podle Chicago (17th ed.)Yanai, S., a T. Fujie. "A Three-machine Permutation Flow-shop Problem with Minimum Makespan on the Second Machine." Journal of the Operational Research Society 57 (2006): 460-468. https://doi.org/10.1057/palgrave.jors.2602014.
Citace podle MLA (9th ed.)Yanai, S., a T. Fujie. "A Three-machine Permutation Flow-shop Problem with Minimum Makespan on the Second Machine." Journal of the Operational Research Society, vol. 57, 2006, pp. 460-468, https://doi.org/10.1057/palgrave.jors.2602014.
Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..