Optimizing the net transfer capacity of a cross-border interconnector by Reactive Power Planning
In this paper, a method for Reactive Power Planning (RPP) is proposed which ensures voltage stability in a system with cross-border electricity flows. One or more cross-border tie-lines connect the Source-area, containing cheap generation, to the Sink-area which is willing to import this cheap power...
Uloženo v:
| Vydáno v: | IEEE Power & Energy Society General Meeting s. 1 - 5 |
|---|---|
| Hlavní autoři: | , , |
| Médium: | Konferenční příspěvek |
| Jazyk: | angličtina |
| Vydáno: |
IEEE
01.07.2016
|
| Témata: | |
| ISSN: | 1944-9933 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | In this paper, a method for Reactive Power Planning (RPP) is proposed which ensures voltage stability in a system with cross-border electricity flows. One or more cross-border tie-lines connect the Source-area, containing cheap generation, to the Sink-area which is willing to import this cheap power. A mathematical method is used to maximize the economic benefit of the Sink-area with respect to the cost of the installed reactive compensators which maximize the Net Transfer Capacity (NTC) of the tie-lines. An analytic expression for the NTC does not exist and two methods are henceforth proposed to approximate the NTC: (1) approximation by a piecewise linear function and (2) by a polynomial obtained with statistical regression. The method is programmed in GAMS and formulated as a Mixed-Integer Non-Linear Programming problem (MINLP). |
|---|---|
| ISSN: | 1944-9933 |
| DOI: | 10.1109/PESGM.2016.7742012 |