Gnagi, M., & Trautmann, N. (2019, December). A Continuous-Time Mixed-Binary Linear Programming Formulation for the Multi-Site Resource-Constrained Project Scheduling Problem. IEEE International Conference on Industrial Engineering and Engineering Management, 611-614. https://doi.org/10.1109/IEEM44572.2019.8978811
Chicago Style (17th ed.) CitationGnagi, M., and N. Trautmann. "A Continuous-Time Mixed-Binary Linear Programming Formulation for the Multi-Site Resource-Constrained Project Scheduling Problem." IEEE International Conference on Industrial Engineering and Engineering Management Dec. 2019: 611-614. https://doi.org/10.1109/IEEM44572.2019.8978811.
MLA (9th ed.) CitationGnagi, M., and N. Trautmann. "A Continuous-Time Mixed-Binary Linear Programming Formulation for the Multi-Site Resource-Constrained Project Scheduling Problem." IEEE International Conference on Industrial Engineering and Engineering Management, Dec. 2019, pp. 611-614, https://doi.org/10.1109/IEEM44572.2019.8978811.