Dong, L., Bian, L., & Tang, H. (2008). Faster approximation algorithm for generalized maximum concurrent flow problem with budget constraint. 2008 IEEE International Conference on Service Operations and Logistics, and Informatics, 1, 1186-1191. https://doi.org/10.1109/SOLI.2008.4686579
Chicago Style (17th ed.) CitationDong, Liwei, Liying Bian, and Hengyong Tang. "Faster Approximation Algorithm for Generalized Maximum Concurrent Flow Problem with Budget Constraint." 2008 IEEE International Conference on Service Operations and Logistics, and Informatics 1 (2008): 1186-1191. https://doi.org/10.1109/SOLI.2008.4686579.
MLA (9th ed.) CitationDong, Liwei, et al. "Faster Approximation Algorithm for Generalized Maximum Concurrent Flow Problem with Budget Constraint." 2008 IEEE International Conference on Service Operations and Logistics, and Informatics, vol. 1, 2008, pp. 1186-1191, https://doi.org/10.1109/SOLI.2008.4686579.