Duan, J., Chen, Q., Sun, W., & Pan, Q. (2017, July). A multi-swarm fruit fly optimization algorithm to minimize makespan for the hybrid flowshop problem. Chinese Control Conference, 2796-2800. https://doi.org/10.23919/ChiCC.2017.8027788
Chicago Style (17th ed.) CitationDuan, Junhua, Qingda Chen, Weiqing Sun, and Quanke Pan. "A Multi-swarm Fruit Fly Optimization Algorithm to Minimize Makespan for the Hybrid Flowshop Problem." Chinese Control Conference Jul. 2017: 2796-2800. https://doi.org/10.23919/ChiCC.2017.8027788.
MLA (9th ed.) CitationDuan, Junhua, et al. "A Multi-swarm Fruit Fly Optimization Algorithm to Minimize Makespan for the Hybrid Flowshop Problem." Chinese Control Conference, Jul. 2017, pp. 2796-2800, https://doi.org/10.23919/ChiCC.2017.8027788.