Energy Optimal Scheduling on Multiprocessors with Migration

We show that the problem of finding an energy minimal schedule for execution of a collection of jobs on a multiprocessor with job migration allowed has polynomial complexity. Each job is specified by a release time, a deadline, and an amount of work to be performed. All of the processors have the sa...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:2008 IEEE International Symposium on Parallel and Distributed Processing with Applications s. 153 - 161
Hlavní autoři: Bingham, B.D., Greenstreet, M.R.
Médium: Konferenční příspěvek
Jazyk:angličtina
Vydáno: IEEE 01.12.2008
Témata:
ISBN:9780769534718, 0769534716
ISSN:2158-9178
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Popis
Shrnutí:We show that the problem of finding an energy minimal schedule for execution of a collection of jobs on a multiprocessor with job migration allowed has polynomial complexity. Each job is specified by a release time, a deadline, and an amount of work to be performed. All of the processors have the same, convex power-speed trade-off of the form P = phi(s), where P is power, s is speed, and phi is convex. Unlike previous work on multiprocessor scheduling, we place no restriction on the release times, deadlines, or amount of work to be done. We show that the scheduling problem is convex, and give an algorithm based on linear programming. We show that the optimal schedule is the same for any convex power-speed trade-off function.
ISBN:9780769534718
0769534716
ISSN:2158-9178
DOI:10.1109/ISPA.2008.128