A Priority-based Dynamic Chain Operation Planning Model

Aiming at the problem of joint formation ship-borne aircraft formation operations, a corresponding resource scheduling model is established in the operational design stage based on the time constraint relationship between the platform and resources by using the task sequence. The resources Schedulin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International Conference on Dependable Systems and Their Applications (Online) S. 356 - 359
Hauptverfasser: Liu, Yihong, Chen, Xingjun
Format: Tagungsbericht
Sprache:Englisch
Veröffentlicht: IEEE 10.08.2023
Schlagworte:
ISSN:2767-6684
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Aiming at the problem of joint formation ship-borne aircraft formation operations, a corresponding resource scheduling model is established in the operational design stage based on the time constraint relationship between the platform and resources by using the task sequence. The resources Scheduling based on priority is realized by aggregating multiple tasks into task chains. A greedy algorithm is constructed to solve the model and verify its rationality.
ISSN:2767-6684
DOI:10.1109/DSA59317.2023.00050