Orderly Power Utilization Based on a Full-Cycle-Variable-Intervals Optimization Algorithm

This year, extremely hot weather in China has caused a hydropower shortage in the southwest and an increased load in the east, thus placing great pressure on the system. Orderly power utilization (OPU) is the most efficient means to address severe short-term power shortage so as to avoid cycled blac...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:2023 13th International Conference on Power, Energy and Electrical Engineering (CPEEE) s. 416 - 420
Hlavní autoři: JunTao, Pan, Zhou, Yang, Xingqiu, Wei, Peng, Xu
Médium: Konferenční příspěvek
Jazyk:angličtina
Vydáno: IEEE 25.02.2023
Témata:
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Popis
Shrnutí:This year, extremely hot weather in China has caused a hydropower shortage in the southwest and an increased load in the east, thus placing great pressure on the system. Orderly power utilization (OPU) is the most efficient means to address severe short-term power shortage so as to avoid cycled blackout events. However, the traditional OPU strategy usually ignores Openness, Equity and Justness (OEJ) principles which may inconvenience many end users (especially big industrial users) and affect satisfaction. Herein, an optimization framework for full cycle OPU is proposed. According to the demand difference in OPU plans in different periods, the optimization model of a full cycle OPU plan with variable intervals is established. Numerical simulation results indicate the great potential of the proposed method to solve power shortage problems by considering the OEJ principles.
DOI:10.1109/CPEEE56777.2023.10217557