Orderly Power Utilization Based on a Full-Cycle-Variable-Intervals Optimization Algorithm

This year, extremely hot weather in China has caused a hydropower shortage in the southwest and an increased load in the east, thus placing great pressure on the system. Orderly power utilization (OPU) is the most efficient means to address severe short-term power shortage so as to avoid cycled blac...

Full description

Saved in:
Bibliographic Details
Published in:2023 13th International Conference on Power, Energy and Electrical Engineering (CPEEE) pp. 416 - 420
Main Authors: JunTao, Pan, Zhou, Yang, Xingqiu, Wei, Peng, Xu
Format: Conference Proceeding
Language:English
Published: IEEE 25.02.2023
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first