Zhang, T., Liang, W., Ji, H., & Zhang, C. (2025). A linear programming joint optimization model of overnight train timetabling and maintenance planning on high-speed railway. Scientific reports, 15(1), 42073-30. https://doi.org/10.1038/s41598-025-26026-9
Chicago-Zitierstil (17. Ausg.)Zhang, Tianwei, Wei Liang, Hangyu Ji, und Chuntian Zhang. "A Linear Programming Joint Optimization Model of Overnight Train Timetabling and Maintenance Planning on High-speed Railway." Scientific Reports 15, no. 1 (2025): 42073-30. https://doi.org/10.1038/s41598-025-26026-9.
MLA-Zitierstil (9. Ausg.)Zhang, Tianwei, et al. "A Linear Programming Joint Optimization Model of Overnight Train Timetabling and Maintenance Planning on High-speed Railway." Scientific Reports, vol. 15, no. 1, 2025, pp. 42073-30, https://doi.org/10.1038/s41598-025-26026-9.