Interruptible load scheduling model based on an improved chicken swarm optimization algorithm

With the continuous growth of the tertiary industry and residential loads, balancing the power supply and consumption during peak demand time has become a critical issue. Some studies try to alleviate peak load by increasing power generation on the supply side. Due to the short duration of peak load...

Full description

Saved in:
Bibliographic Details
Published in:CSEE Journal of Power and Energy Systems Vol. 7; no. 2; pp. 232 - 240
Main Authors: Jinsong Wang, Fan Zhang, Huanan Liu, Jianyong Ding, Ciwei Gao
Format: Journal Article
Language:English
Published: Beijing Chinese Society for Electrical Engineering Journal of Power and Energy Systems 01.03.2021
China electric power research institute
Subjects:
ISSN:2096-0042, 2096-0042
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first