Interruptible load scheduling model based on an improved chicken swarm optimization algorithm
With the continuous growth of the tertiary industry and residential loads, balancing the power supply and consumption during peak demand time has become a critical issue. Some studies try to alleviate peak load by increasing power generation on the supply side. Due to the short duration of peak load...
Gespeichert in:
| Veröffentlicht in: | CSEE Journal of Power and Energy Systems Jg. 7; H. 2; S. 232 - 240 |
|---|---|
| Hauptverfasser: | , , , , |
| Format: | Journal Article |
| Sprache: | Englisch |
| Veröffentlicht: |
Beijing
Chinese Society for Electrical Engineering Journal of Power and Energy Systems
01.03.2021
China electric power research institute |
| Schlagworte: | |
| ISSN: | 2096-0042, 2096-0042 |
| Online-Zugang: | Volltext |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!