Citace podle APA (7th ed.)

Wang, J., Zhang, F., Liu, H., Ding, J., & Gao, C. (2021). Interruptible load scheduling model based on an improved chicken swarm optimization algorithm. CSEE Journal of Power and Energy Systems, 7(2), 232-240. https://doi.org/10.17775/CSEEJPES.2020.01150

Citace podle Chicago (17th ed.)

Wang, Jinsong, Fan Zhang, Huanan Liu, Jianyong Ding, a Ciwei Gao. "Interruptible Load Scheduling Model Based on an Improved Chicken Swarm Optimization Algorithm." CSEE Journal of Power and Energy Systems 7, no. 2 (2021): 232-240. https://doi.org/10.17775/CSEEJPES.2020.01150.

Citace podle MLA (9th ed.)

Wang, Jinsong, et al. "Interruptible Load Scheduling Model Based on an Improved Chicken Swarm Optimization Algorithm." CSEE Journal of Power and Energy Systems, vol. 7, no. 2, 2021, pp. 232-240, https://doi.org/10.17775/CSEEJPES.2020.01150.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..