Yin, Y., Cheng, T., & Wang, D. (2016). Rescheduling on identical parallel machines with machine disruptions to minimize total completion time. European journal of operational research, 252(3), 737-749. https://doi.org/10.1016/j.ejor.2016.01.045
Chicago-Zitierstil (17. Ausg.)Yin, Yunqiang, T.C.E Cheng, und Du-Juan Wang. "Rescheduling on Identical Parallel Machines with Machine Disruptions to Minimize Total Completion Time." European Journal of Operational Research 252, no. 3 (2016): 737-749. https://doi.org/10.1016/j.ejor.2016.01.045.
MLA-Zitierstil (9. Ausg.)Yin, Yunqiang, et al. "Rescheduling on Identical Parallel Machines with Machine Disruptions to Minimize Total Completion Time." European Journal of Operational Research, vol. 252, no. 3, 2016, pp. 737-749, https://doi.org/10.1016/j.ejor.2016.01.045.