Citace podle APA (7th ed.)

Yin, Y., Cheng, T., & Wang, D. (2016). Rescheduling on identical parallel machines with machine disruptions to minimize total completion time. European journal of operational research, 252(3), 737-749. https://doi.org/10.1016/j.ejor.2016.01.045

Citace podle Chicago (17th ed.)

Yin, Yunqiang, T.C.E Cheng, a Du-Juan Wang. "Rescheduling on Identical Parallel Machines with Machine Disruptions to Minimize Total Completion Time." European Journal of Operational Research 252, no. 3 (2016): 737-749. https://doi.org/10.1016/j.ejor.2016.01.045.

Citace podle MLA (9th ed.)

Yin, Yunqiang, et al. "Rescheduling on Identical Parallel Machines with Machine Disruptions to Minimize Total Completion Time." European Journal of Operational Research, vol. 252, no. 3, 2016, pp. 737-749, https://doi.org/10.1016/j.ejor.2016.01.045.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..