APA (7th ed.) Citation

Wu, X., & Zhou, X. (2008). Stochastic scheduling to minimize expected maximum lateness. European journal of operational research, 190(1), 103-115. https://doi.org/10.1016/j.ejor.2007.06.015

Chicago Style (17th ed.) Citation

Wu, Xianyi, and Xian Zhou. "Stochastic Scheduling to Minimize Expected Maximum Lateness." European Journal of Operational Research 190, no. 1 (2008): 103-115. https://doi.org/10.1016/j.ejor.2007.06.015.

MLA (9th ed.) Citation

Wu, Xianyi, and Xian Zhou. "Stochastic Scheduling to Minimize Expected Maximum Lateness." European Journal of Operational Research, vol. 190, no. 1, 2008, pp. 103-115, https://doi.org/10.1016/j.ejor.2007.06.015.

Warning: These citations may not always be 100% accurate.