Wu, X., & Zhou, X. (2008). Stochastic scheduling to minimize expected maximum lateness. European journal of operational research, 190(1), 103-115. https://doi.org/10.1016/j.ejor.2007.06.015
Citace podle Chicago (17th ed.)Wu, Xianyi, a Xian Zhou. "Stochastic Scheduling to Minimize Expected Maximum Lateness." European Journal of Operational Research 190, no. 1 (2008): 103-115. https://doi.org/10.1016/j.ejor.2007.06.015.
Citace podle MLA (9th ed.)Wu, Xianyi, a Xian Zhou. "Stochastic Scheduling to Minimize Expected Maximum Lateness." European Journal of Operational Research, vol. 190, no. 1, 2008, pp. 103-115, https://doi.org/10.1016/j.ejor.2007.06.015.
Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..