Citace podle APA (7th ed.)

Li, S., Ng, C., Cheng, T., & Yuan, J. (2011). Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan. European journal of operational research, 210(3), 482-488. https://doi.org/10.1016/j.ejor.2010.11.021

Citace podle Chicago (17th ed.)

Li, Shisheng, C.T Ng, T.C.E Cheng, a Jinjiang Yuan. "Parallel-batch Scheduling of Deteriorating Jobs with Release Dates to Minimize the Makespan." European Journal of Operational Research 210, no. 3 (2011): 482-488. https://doi.org/10.1016/j.ejor.2010.11.021.

Citace podle MLA (9th ed.)

Li, Shisheng, et al. "Parallel-batch Scheduling of Deteriorating Jobs with Release Dates to Minimize the Makespan." European Journal of Operational Research, vol. 210, no. 3, 2011, pp. 482-488, https://doi.org/10.1016/j.ejor.2010.11.021.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..