Complexity of single machine scheduling subject to nonnegative inventory constraints

This paper focuses on single machine scheduling subject to inventory constraints. Jobs either add items to an inventory or remove items from that inventory. Jobs that have to remove items cannot be processed if the required number of items is not available. We consider scheduling problems on a singl...

Full description

Saved in:
Bibliographic Details
Published in:European journal of operational research Vol. 207; no. 2; pp. 605 - 619
Main Authors: Briskorn, Dirk, Choi, Byung-Cheon, Lee, Kangbok, Leung, Joseph, Pinedo, Michael
Format: Journal Article
Language:English
Published: Amsterdam Elsevier B.V 01.12.2010
Elsevier
Elsevier Sequoia S.A
Series:European Journal of Operational Research
Subjects:
ISSN:0377-2217, 1872-6860
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This paper focuses on single machine scheduling subject to inventory constraints. Jobs either add items to an inventory or remove items from that inventory. Jobs that have to remove items cannot be processed if the required number of items is not available. We consider scheduling problems on a single machine with the minimization of the total weighted completion time, the maximum lateness, and the number of tardy jobs, respectively, as objective and determine their computational complexity. Since the general versions of our problems turn out to be strongly NP-hard, we consider special cases by assuming that different jobs have certain parameter values in common. We determine the computational complexity for all special cases when the objective is either to minimize total completion time or to minimize maximum lateness and for several special cases when the objective is either to minimize total weighted completion time or to minimize the number of tardy jobs.
Bibliography:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ObjectType-Article-2
content type line 23
ISSN:0377-2217
1872-6860
DOI:10.1016/j.ejor.2010.05.036