Two-agent scheduling to minimize the total cost

► We consider a two-agent single-machine scheduling problem to minimize the total costs of the agents. ► The cost of the first agent is the maximum weighted completion time of his jobs and the cost of the second agent is the total weighted completion time of his jobs. ► We provide a 2-approximation...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:European journal of operational research Ročník 215; číslo 1; s. 39 - 44
Hlavní autori: Nong, Q.Q., Cheng, T.C.E., Ng, C.T.
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: Amsterdam Elsevier B.V 16.11.2011
Elsevier
Elsevier Sequoia S.A
Edícia:European Journal of Operational Research
Predmet:
ISSN:0377-2217, 1872-6860
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Popis
Shrnutí:► We consider a two-agent single-machine scheduling problem to minimize the total costs of the agents. ► The cost of the first agent is the maximum weighted completion time of his jobs and the cost of the second agent is the total weighted completion time of his jobs. ► We provide a 2-approximation algorithm for the problem. ► We show that the case where the number of jobs of the first agent is fixed is NP-hard. ► We devise a polynomial time approximation scheme for this case. Two agents, each having his own set of jobs, compete to perform their own jobs on a common processing resource. Each job of the agents has a weight that specifies its importance. The cost of the first agent is the maximum weighted completion time of his jobs while the cost of the second agent is the total weighted completion time of his jobs. We consider the scheduling problem of determining the sequence of the jobs such that the total cost of the two agents is minimized. We provide a 2-approximation algorithm for the problem, show that the case where the number of jobs of the first agent is fixed is NP-hard, and devise a polynomial time approximation scheme for this case.
Bibliografia:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ObjectType-Article-2
content type line 23
ISSN:0377-2217
1872-6860
DOI:10.1016/j.ejor.2011.05.041