Nong, Q., Cheng, T., & Ng, C. (2011). Two-agent scheduling to minimize the total cost. European journal of operational research, 215(1), 39-44. https://doi.org/10.1016/j.ejor.2011.05.041
Chicago-Zitierstil (17. Ausg.)Nong, Q.Q, T.C.E Cheng, und C.T Ng. "Two-agent Scheduling to Minimize the Total Cost." European Journal of Operational Research 215, no. 1 (2011): 39-44. https://doi.org/10.1016/j.ejor.2011.05.041.
MLA-Zitierstil (9. Ausg.)Nong, Q.Q, et al. "Two-agent Scheduling to Minimize the Total Cost." European Journal of Operational Research, vol. 215, no. 1, 2011, pp. 39-44, https://doi.org/10.1016/j.ejor.2011.05.041.
Achtung: Diese Zitate sind unter Umständen nicht zu 100% korrekt.