The Continuous Assignment Problem and Its Application to Preemptive and Non-Preemptive Scheduling with Irregular Cost Functions
This paper focuses on the continuous assignment problem with the eventual aim to solve scheduling problems with irregular cost functions. It consists of partitioning a region of R d into subregions of prescribed volumes so that the total cost is minimized. The dual problem of the continuous assignme...
Uloženo v:
| Vydáno v: | INFORMS journal on computing Ročník 16; číslo 2; s. 198 - 208 |
|---|---|
| Hlavní autor: | |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Linthicum
INFORMS
22.03.2004
Institute for Operations Research and the Management Sciences |
| Témata: | |
| ISSN: | 1091-9856, 1526-5528, 1091-9856 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | This paper focuses on the continuous assignment problem with the eventual aim to solve scheduling problems with irregular cost functions. It consists of partitioning a region of R d into subregions of prescribed volumes so that the total cost is minimized. The dual problem of the continuous assignment problem is an unconstrained maximization of a non-smooth concave function. The preemptive variant of the scheduling problem with irregular cost functions corresponds to the one-dimensional continuous assignment problem and a lower bound for the non-preemptive variant can be derived. It is computationally tested in a branch-and-bound algorithm. |
|---|---|
| Bibliografie: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 |
| ISSN: | 1091-9856 1526-5528 1091-9856 |
| DOI: | 10.1287/ijoc.1030.0034 |