One approach to temperature distribution control in thermal power plant boilers

Optimization of the combustion control process in a tangentially fired pulverized coal boiler, to achieve uniform temperature distribution, is discussed in the paper. This issue is even more critical in those thermal power plants which are not equipped with modern systems for combustion enhancement,...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:Automatika Ročník 61; číslo 2; s. 273 - 283
Hlavní autoři: Marjanović, Aleksandra, Vujnović, Sanja, Ðurović, Željko
Médium: Journal Article Paper
Jazyk:angličtina
Vydáno: Ljubljana Taylor & Francis 02.04.2020
Taylor & Francis Ltd
KoREMA - Hrvatsko društvo za komunikacije,računarstvo, elektroniku, mjerenja i automatiku
Taylor & Francis Group
Témata:
ISSN:0005-1144, 1848-3380
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Popis
Shrnutí:Optimization of the combustion control process in a tangentially fired pulverized coal boiler, to achieve uniform temperature distribution, is discussed in the paper. This issue is even more critical in those thermal power plants which are not equipped with modern systems for combustion enhancement, such as low NOx burners. Research has shown that the temperature distribution inside the boiler of such power plant can be controlled by adjusting firing, through coal redistribution among the mills. Furthermore, disturbed flame symmetry (i.e. non-uniform temperature distribution in the boiler) is reflected in a large difference between the output temperatures measured on the left and right sides of the boiler. Given the non-stationary conditions typical of thermal power plant boilers, an adaptive control approach is proposed, based on PI controllers which are very popular in industry and widely accepted. Self-tuning of the PI controllers is based on dynamic model parameters derived applying the weighted recursive least squares (WRLS) method to real data recorded at Nikola Tesla B thermal power plant in Serbia, whose nominal power is 650 MW. The same model was later used to test the proposed control approach.
Bibliografie:ObjectType-Article-1