Bidding-based process planning and scheduling in a multi-agent system

Effective and efficient implementation of intelligent and/or agile manufacturing systems requires an enterprise level integration. The first step in this direction is to integrate design, process planning and and scheduling. This paper describes a bidding-based approach to the integration of compute...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:Computers & industrial engineering Ročník 32; číslo 2; s. 477 - 496
Hlavní autoři: Gu, P., Balasubramanian, S., Norrie, D.H.
Médium: Journal Article
Jazyk:angličtina
Vydáno: Seoul Elsevier Ltd 01.04.1997
Oxford Pergamon Press
New York, NY Pergamon Press Inc
Témata:
ISSN:0360-8352, 1879-0550
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Abstract Effective and efficient implementation of intelligent and/or agile manufacturing systems requires an enterprise level integration. The first step in this direction is to integrate design, process planning and and scheduling. This paper describes a bidding-based approach to the integration of computer-aided design, process planning and real time scheduling. The product is represented in a STEP model with detailed design and administrative information including design specifications, batch size, and due dates. Upon arrival at the manufacturing facility, the product is registered in the shop floor manager which is essentially a coordinating agent. The shop floor manager broadcasts the product's requirements to the machines. The shop contains autonomous machines that have knowledge about their functionality, capabilities, tooling and schedules. Each machine has its own process planner and responds to the product's request in a way that is consistent with its capabilities and capacities. When more than one machine offers certain process(es) for the same requirements, they enter into negotiation. Based on processing time, due date and cost, one of the machines wins the contract. The successful machine updates its schedule and advises the product to request raw material for processing. The concept was implemented using a multi-agent system in an object-oriented programming language. The task decomposition and planning are achieved through contract nets. Examples are included to illustrate the approach.
AbstractList Effective and efficient implementation of intelligent and/or agile manufacturing systems requires an enterprise level integration. The first step in this direction is to integrate design, process planning and and scheduling. This paper describes a bidding-based approach to the integration of computer-aided design, process planning and real time scheduling. The product is represented in a STEP model with detailed design and administrative information including design specifications, batch size, and due dates. Upon arrival at the manufacturing facility, the product is registered in the shop floor manager which is essentially a coordinating agent. The shop floor manager broadcasts the product's requirements to the machines. The shop contains autonomous machines that have knowledge about their functionality, capabilities, tooling and schedules. Each machine has its own process planner and responds to the product's request in a way that is consistent with its capabilities and capacities. When more than one machine offers certain process(es) for the same requirements, they enter into negotiation. Based on processing time, due date and cost, one of the machines wins the contract. The successful machine updates its schedule and advises the product to request raw material for processing. The concept was implemented using a multi-agent system in an object-oriented programming language. The task decomposition and planning are achieved through contract nets. Examples are included to illustrate the approach.
A bidding-based approach to the integration of computer-aided design, process planning and real time scheduling is described. The product is represented in a STEP model with detailed design and administrative information including design specifications, batch size, and due dates. Upon arrival at the manufacturing facility, the product is registered in the shop floor manager, who then broadcasts the product's requirements to the machines. The shop contains autonomous machines that have knowledge about their functionality, capabilities, tooling and schedules. When more than one machine offers certain process(es) for the same requirements, they enter into negotiation. Based on processing time, due date and cost, one of the machines wins the contract. The successful machine updates its schedule and advises the product to request raw material for processing. The concept was implemented using a multi-agent system in an object-oriented programming language. The task decomposition and planning are achieved through contract nets.
Author Balasubramanian, S.
Norrie, D.H.
Gu, P.
Author_xml – sequence: 1
  givenname: P.
  surname: Gu
  fullname: Gu, P.
  organization: Department of Mechanical Engineering, University of Saskatchewan, Saskatoon, SK, Canada
– sequence: 2
  givenname: S.
  surname: Balasubramanian
  fullname: Balasubramanian, S.
  organization: Department of Mechanical Engineering, The University of Calgary, Calgary, AB, Canada
– sequence: 3
  givenname: D.H.
  surname: Norrie
  fullname: Norrie, D.H.
  organization: Department of Mechanical Engineering, The University of Calgary, Calgary, AB, Canada
BackLink http://pascal-francis.inist.fr/vibad/index.php?action=getRecordDetail&idt=2609539$$DView record in Pascal Francis
BookMark eNqFkE1LAzEQhoMo2FZ_grCIBz2sJptNdoMH0VI_QPCgnsNsMquRbbYmqeC_d9uKBy89DTM878zwjMmu7z0ScsToOaNMXjxTLmlec1GcKnlGKRUy5ztkxOpK5VQIuktGf8g-Gcf4MUClUGxEZjfOWuff8gYi2mwReoMxZosOvB_GGXibRfOOdtmtWuczyObLLrkc3tCnLH7HhPMDstdCF_Hwt07I6-3sZXqfPz7dPUyvH3NT1jzlxra1KgpAqwpeQsUrsKpitKnbtmGAJRM1NQVHY2XTGkZFK01NaVNYBqVo-IQcb_YOf34uMSb90S-DH07qgvFKSDWUCTn5hSAa6NoA3rioF8HNIXzrQlIluBowscFM6GMM2P4RjOqVV732qlfStJJ67VXzIXf5L2dcguR6nwK4bmv6apPGQdOXw6CjcegNWhfQJG17t2XDDwywk1I
CODEN CINDDL
CitedBy_id crossref_primary_10_1016_j_cirpj_2013_07_001
crossref_primary_10_1016_j_procir_2021_01_043
crossref_primary_10_1016_S0007_8506_07_62994_1
crossref_primary_10_1080_00207543_2010_492407
crossref_primary_10_1016_j_procs_2025_01_114
crossref_primary_10_1016_S1474_0346_02_00007_1
crossref_primary_10_1016_j_jmsy_2014_11_013
crossref_primary_10_1080_00207543_2016_1267414
crossref_primary_10_1007_s00170_008_1844_3
crossref_primary_10_1016_S0007_8506_07_62131_3
crossref_primary_10_1007_s00170_004_2317_y
crossref_primary_10_1080_00207540500521071
crossref_primary_10_1080_00207543_2021_1925772
crossref_primary_10_1007_s10845_005_1661_6
crossref_primary_10_1080_00207540412331299710
crossref_primary_10_1080_00207540310001613683
crossref_primary_10_1016_S0924_0136_03_00088_8
crossref_primary_10_1016_j_eswa_2011_04_067
crossref_primary_10_1243_0954405011519060
crossref_primary_10_1016_j_compchemeng_2013_09_004
crossref_primary_10_1007_s10845_014_1023_3
crossref_primary_10_1016_j_jom_2004_01_004
crossref_primary_10_1016_S0278_6125_03_90008_2
crossref_primary_10_1080_00207543_2015_1098786
crossref_primary_10_1080_00207540701441921
crossref_primary_10_1007_s10845_020_01548_3
crossref_primary_10_1080_00207543_2011_636763
crossref_primary_10_1155_2019_1572614
crossref_primary_10_1016_j_cirp_2010_03_144
crossref_primary_10_1016_j_eswa_2018_01_027
crossref_primary_10_1016_j_ijpe_2013_08_022
crossref_primary_10_1515_IJMSP_2004_6_1_2_89
crossref_primary_10_1016_S0925_5273_98_00222_9
crossref_primary_10_1111_itor_12195
crossref_primary_10_1016_j_engappai_2016_04_005
crossref_primary_10_1007_BF02830019
crossref_primary_10_1109_TSMCA_2007_897710
crossref_primary_10_1016_j_eswa_2005_09_073
crossref_primary_10_1080_00207540410001733959
crossref_primary_10_1007_s10845_008_0223_0
crossref_primary_10_1007_s00170_008_1403_y
crossref_primary_10_1080_00207543_2012_720393
crossref_primary_10_1016_S0924_0136_03_00233_4
crossref_primary_10_1023_A_1025797124367
crossref_primary_10_1016_j_eswa_2009_06_014
crossref_primary_10_1080_00207540210159554
crossref_primary_10_1016_j_cie_2016_10_015
crossref_primary_10_1007_s00170_008_1858_x
crossref_primary_10_1016_j_ifacol_2018_08_355
crossref_primary_10_1016_S0360_8352_98_00132_6
crossref_primary_10_1007_s00170_007_1087_8
crossref_primary_10_1080_00207540500142167
crossref_primary_10_1109_TSMCC_2006_874022
crossref_primary_10_1023_A_1025705426184
crossref_primary_10_1007_s00170_005_0345_x
Cites_doi 10.1080/00207548908942569
10.1016/0010-4485(90)90093-R
10.1111/j.1468-0394.1991.tb00246.x
10.1016/S0007-8506(07)62750-4
10.1115/1.2901800
10.1016/S0007-8506(07)60756-2
10.1016/0360-8352(94)90007-8
10.1016/S0278-6125(83)80026-0
10.1016/S0007-8506(07)61899-X
10.1016/S0007-8506(07)61431-0
10.1016/0166-3615(87)90051-0
10.1016/S0007-8506(07)61801-0
10.1016/S0007-8506(07)63322-8
ContentType Journal Article
Copyright 1997
1997 INIST-CNRS
Copyright Pergamon Press Inc. Apr 1997
Copyright_xml – notice: 1997
– notice: 1997 INIST-CNRS
– notice: Copyright Pergamon Press Inc. Apr 1997
DBID AAYXX
CITATION
IQODW
7SC
8FD
JQ2
L7M
L~C
L~D
DOI 10.1016/S0360-8352(96)00056-3
DatabaseName CrossRef
Pascal-Francis
Computer and Information Systems Abstracts
Technology Research Database
ProQuest Computer Science Collection
Advanced Technologies Database with Aerospace
Computer and Information Systems Abstracts – Academic
Computer and Information Systems Abstracts Professional
DatabaseTitle CrossRef
Computer and Information Systems Abstracts
Technology Research Database
Computer and Information Systems Abstracts – Academic
Advanced Technologies Database with Aerospace
ProQuest Computer Science Collection
Computer and Information Systems Abstracts Professional
DatabaseTitleList
Computer and Information Systems Abstracts
DeliveryMethod fulltext_linktorsrc
Discipline Applied Sciences
Engineering
EISSN 1879-0550
EndPage 496
ExternalDocumentID 11842627
2609539
10_1016_S0360_8352_96_00056_3
S0360835296000563
GroupedDBID --K
--M
-~X
.DC
.~1
0R~
1B1
1RT
1~.
1~5
29F
4.4
457
4G.
5GY
5VS
7-5
71M
8P~
9JN
9JO
AAAKG
AABNK
AACTN
AAEDT
AAEDW
AAFWJ
AAIAV
AAIKC
AAIKJ
AAKOC
AALRI
AAMNW
AAOAW
AAQFI
AAQXK
AARIN
AAXUO
ABAOU
ABMAC
ABUCO
ABXDB
ABYKQ
ACAZW
ACDAQ
ACGFO
ACGFS
ACNCT
ACNNM
ACRLP
ADBBV
ADEZE
ADGUI
ADMUD
ADRHT
ADTZH
AEBSH
AECPX
AEKER
AENEX
AFKWA
AFTJW
AGHFR
AGUBO
AGYEJ
AHHHB
AHJVU
AIEXJ
AIGVJ
AIKHN
AITUG
AJBFU
AJOXV
ALMA_UNASSIGNED_HOLDINGS
AMFUW
AMRAJ
APLSM
ARUGR
ASPBG
AVWKF
AXJTR
AZFZN
BJAXD
BKOJK
BKOMP
BLXMC
CS3
DU5
EBS
EFJIC
EFLBG
EJD
EO8
EO9
EP2
EP3
FDB
FEDTE
FGOYB
FIRID
FNPLU
FYGXN
G-2
G-Q
G8K
GBLVA
HAMUX
HLZ
HVGLF
HZ~
H~9
IHE
J1W
JJJVA
KOM
LX9
LY1
LY7
M41
MHUIS
MO0
MS~
N9A
O-L
O9-
OAUVE
OZT
P-8
P-9
P2P
PC.
PQQKQ
Q38
R2-
RIG
RNS
ROL
RPZ
RXW
SBC
SDF
SDG
SDP
SDS
SES
SET
SEW
SPC
SPCBC
SSB
SSD
SST
SSW
SSZ
T5K
TAE
TN5
WUQ
XPP
ZMT
~G-
9DU
AATTM
AAXKI
AAYWO
AAYXX
ABDPE
ABJNI
ABWVN
ACLOT
ACRPL
ACVFH
ADCNI
ADNMO
AEIPS
AEUPX
AFJKZ
AFPUW
AGQPQ
AIGII
AIIUN
AKBMS
AKRWK
AKYEP
ANKPU
APXCP
CITATION
EFKBS
~HD
AFXIZ
AGCQF
AGRNS
BNPGV
IQODW
SSH
7SC
8FD
JQ2
L7M
L~C
L~D
ID FETCH-LOGICAL-c483t-cdf8922aed9234a737ad9710b8ffb1ae41580c23ecd6bfc105f6c800b2d1a45b3
ISICitedReferencesCount 88
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=10_1016_S0360_8352_96_00056_3&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 0360-8352
IngestDate Sun Nov 09 08:22:00 EST 2025
Mon Jul 21 09:13:57 EDT 2025
Tue Nov 18 22:19:05 EST 2025
Sat Nov 29 01:39:35 EST 2025
Fri Feb 23 02:24:00 EST 2024
IsPeerReviewed true
IsScholarly true
Issue 2
Keywords Autonomous system
Multiagent system
Process planning
Object oriented
Flow shop
Scheduling
Manufacturing
Hierarchical system
Computer aided design
Language English
License https://www.elsevier.com/tdm/userlicense/1.0
CC BY 4.0
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-c483t-cdf8922aed9234a737ad9710b8ffb1ae41580c23ecd6bfc105f6c800b2d1a45b3
Notes ObjectType-Article-1
SourceType-Scholarly Journals-1
content type line 14
PQID 213756921
PQPubID 9545
PageCount 20
ParticipantIDs proquest_journals_213756921
pascalfrancis_primary_2609539
crossref_primary_10_1016_S0360_8352_96_00056_3
crossref_citationtrail_10_1016_S0360_8352_96_00056_3
elsevier_sciencedirect_doi_10_1016_S0360_8352_96_00056_3
PublicationCentury 1900
PublicationDate 1997-04-01
PublicationDateYYYYMMDD 1997-04-01
PublicationDate_xml – month: 04
  year: 1997
  text: 1997-04-01
  day: 01
PublicationDecade 1990
PublicationPlace Seoul
Oxford
New York, NY
PublicationPlace_xml – name: Oxford
– name: Seoul
– name: New York, NY
– name: New York
PublicationTitle Computers & industrial engineering
PublicationYear 1997
Publisher Elsevier Ltd
Pergamon Press
Pergamon Press Inc
Publisher_xml – name: Elsevier Ltd
– name: Pergamon Press
– name: Pergamon Press Inc
References Chryssolouris, Chan (BIB6) 1986; 35
Descotte, Latombe (BIB8) 1984
Berenji, Khoshnevis (BIB2) 1986
Chang, Anderson, Mitchell (BIB3) 1988
Giusti, Santochi, Dini (BIB9) 1989; 38
Wang, Wysk (BIB20) 1987
Alting, Zhang (BIB1) 1989; 27
Van't Erve, Kals (BIB19) 1986
Cho, Derebail, Hale, Wysk (BIB5) 1994; 116
Van't Erve, Kals (BIB18) 1986; 35
Ham, Lu (BIB11) 1988; 37
Lee, Lim, Nee (BIB13) 1991; 8
Chang, Wysk (BIB4) 1983; 2
Li, Han, Ham (BIB14) 1987
Perng, Chen, Rong (BIB17) 1990; 22
Wright, Darbyshire, Park, Davies (BIB22) 1987
Gu, Zhang (BIB10) 1994; 26
Davies, Darbyshire (BIB7) 1984; 33
Matsushima, Okada, Sata (BIB15) 1982; 31
Kanumury (BIB12) 1988
NIST, ISO DIS 10303-21 (BIB16) 1993
Wang, Wysk (BIB21) 1987; 8
NIST (10.1016/S0360-8352(96)00056-3_BIB16) 1993
Cho (10.1016/S0360-8352(96)00056-3_BIB5) 1994; 116
Perng (10.1016/S0360-8352(96)00056-3_BIB17) 1990; 22
Lee (10.1016/S0360-8352(96)00056-3_BIB13) 1991; 8
Alting (10.1016/S0360-8352(96)00056-3_BIB1) 1989; 27
Chang (10.1016/S0360-8352(96)00056-3_BIB3) 1988
Van't Erve (10.1016/S0360-8352(96)00056-3_BIB18) 1986; 35
Van't Erve (10.1016/S0360-8352(96)00056-3_BIB19) 1986
Li (10.1016/S0360-8352(96)00056-3_BIB14) 1987
Berenji (10.1016/S0360-8352(96)00056-3_BIB2) 1986
Chryssolouris (10.1016/S0360-8352(96)00056-3_BIB6) 1986; 35
Matsushima (10.1016/S0360-8352(96)00056-3_BIB15) 1982; 31
Giusti (10.1016/S0360-8352(96)00056-3_BIB9) 1989; 38
Wright (10.1016/S0360-8352(96)00056-3_BIB22) 1987
Chang (10.1016/S0360-8352(96)00056-3_BIB4) 1983; 2
Descotte (10.1016/S0360-8352(96)00056-3_BIB8) 1984
Ham (10.1016/S0360-8352(96)00056-3_BIB11) 1988; 37
Davies (10.1016/S0360-8352(96)00056-3_BIB7) 1984; 33
Kanumury (10.1016/S0360-8352(96)00056-3_BIB12) 1988
Wang (10.1016/S0360-8352(96)00056-3_BIB20) 1987
Gu (10.1016/S0360-8352(96)00056-3_BIB10) 1994; 26
Wang (10.1016/S0360-8352(96)00056-3_BIB21) 1987; 8
References_xml – volume: 116
  start-page: 108
  year: 1994
  end-page: 116
  ident: BIB5
  article-title: A formal approach to intergrating computer-aided process planning and shop floor control
  publication-title: Trans. ASME, J. Engng Ind.
– start-page: 309
  year: 1987
  end-page: 313
  ident: BIB22
  article-title: EXCAP and ICAPP: integrated knowledge-based systems for process-planning components
  publication-title: Proc. of 19th CIRP International Seminar on Manufacturing System Computer-Aided Process Planning
– year: 1993
  ident: BIB16
  article-title: Product Data Representation and Exchange-Part 21: Clear Text Encoding of the Exchange Structure
– volume: 22
  start-page: 285
  year: 1990
  end-page: 295
  ident: BIB17
  article-title: Automatic 3D machining feature extraction from 3D CSG solid input
  publication-title: Computer Aided Design J.
– volume: 35
  start-page: 325
  year: 1986
  end-page: 330
  ident: BIB18
  article-title: XPLANE, a generative computer-aided process planning system for part manufacturing
  publication-title: Ann CIRP
– volume: 38
  start-page: 481
  year: 1989
  end-page: 484
  ident: BIB9
  article-title: KAPLAN: a knowledge-based approach to process planning of rotational parts
  publication-title: Ann. CIRP
– start-page: 417
  year: 1988
  end-page: 426
  ident: BIB3
  article-title: QTC-an integrated design/manufacturing/inspection system for prismatic parts
  publication-title: Proc. of the 1988 ASME International Computers in Engineering Conference and Exhibition
– volume: 33
  start-page: 303
  year: 1984
  end-page: 306
  ident: BIB7
  article-title: The use of expert systems in process-planning
  publication-title: Ann. CIRP
– volume: 35
  start-page: 413
  year: 1986
  end-page: 417
  ident: BIB6
  article-title: An integrated approach to process planning and scheduling
  publication-title: Ann. CIRP
– start-page: 41
  year: 1986
  end-page: 46
  ident: BIB19
  article-title: XPLANE, a knowledge-based driven process planning expert system
  publication-title: Proc of International Conference on Computer-Aided Production Engineering
– volume: 31
  start-page: 329
  year: 1982
  end-page: 332
  ident: BIB15
  article-title: The integration of CAD and CAM by application of artificial intelligence techniques
  publication-title: Ann. CIRP
– year: 1988
  ident: BIB12
  article-title: AMPS-an automatic process planning system
  publication-title: M.S. Thesis
– volume: 8
  start-page: 19
  year: 1991
  end-page: 33
  ident: BIB13
  article-title: IKOOPPS: an intelligent knowledge-based object-oriented process planning system for the manufacture of progressive dies
  publication-title: Expert Systems
– volume: 2
  start-page: 127
  year: 1983
  end-page: 135
  ident: BIB4
  article-title: CAD/generative process planning with TIPPS
  publication-title: J. Manu. Systems
– volume: 26
  start-page: 709
  year: 1994
  end-page: 731
  ident: BIB10
  article-title: OOPPS: an object-oriented process planning system
  publication-title: Computers Ind. Engng
– start-page: 161
  year: 1987
  end-page: 169
  ident: BIB20
  article-title: TURBO-CAPP: a knowledge-based computer aided process planning system
  publication-title: Proc. of 19th CIRP International Seminar on Manufacturing System Computer-Aided Process Planning
– start-page: 219
  year: 1987
  end-page: 225
  ident: BIB14
  article-title: CORE-CAPP: company-oriented semi-generative computer automated process-planning system
  publication-title: Proc. of 19th CIRP International Seminar on Manufacturing System Computer-Aided Process Planning
– volume: 8
  start-page: 293
  year: 1987
  end-page: 309
  ident: BIB21
  article-title: Intelligent reasoning for process planning
  publication-title: Computers in Industry
– start-page: 47
  year: 1986
  end-page: 55
  ident: BIB2
  article-title: Use of artificial intelligence in automated process planning
  publication-title: Computers Mech. Engng
– volume: 27
  start-page: 553
  year: 1989
  end-page: 585
  ident: BIB1
  article-title: Computer aided process planning: the state of the art survey
  publication-title: Int J. Prod. Res.
– volume: 37
  start-page: 591
  year: 1988
  end-page: 601
  ident: BIB11
  article-title: Computer-aided process planning: the present and the future
  publication-title: Ann. CIRP
– start-page: 329
  year: 1984
  end-page: 345
  ident: BIB8
  article-title: GARI: an expert system for process planning
  publication-title: Solid Modelling by Computers
– volume: 27
  start-page: 553
  year: 1989
  ident: 10.1016/S0360-8352(96)00056-3_BIB1
  article-title: Computer aided process planning: the state of the art survey
  publication-title: Int J. Prod. Res.
  doi: 10.1080/00207548908942569
– start-page: 219
  year: 1987
  ident: 10.1016/S0360-8352(96)00056-3_BIB14
  article-title: CORE-CAPP: company-oriented semi-generative computer automated process-planning system
– year: 1988
  ident: 10.1016/S0360-8352(96)00056-3_BIB12
  article-title: AMPS-an automatic process planning system
– start-page: 417
  year: 1988
  ident: 10.1016/S0360-8352(96)00056-3_BIB3
  article-title: QTC-an integrated design/manufacturing/inspection system for prismatic parts
– volume: 22
  start-page: 285
  year: 1990
  ident: 10.1016/S0360-8352(96)00056-3_BIB17
  article-title: Automatic 3D machining feature extraction from 3D CSG solid input
  publication-title: Computer Aided Design J.
  doi: 10.1016/0010-4485(90)90093-R
– volume: 8
  start-page: 19
  year: 1991
  ident: 10.1016/S0360-8352(96)00056-3_BIB13
  article-title: IKOOPPS: an intelligent knowledge-based object-oriented process planning system for the manufacture of progressive dies
  publication-title: Expert Systems
  doi: 10.1111/j.1468-0394.1991.tb00246.x
– year: 1993
  ident: 10.1016/S0360-8352(96)00056-3_BIB16
– volume: 38
  start-page: 481
  issue: 1
  year: 1989
  ident: 10.1016/S0360-8352(96)00056-3_BIB9
  article-title: KAPLAN: a knowledge-based approach to process planning of rotational parts
  publication-title: Ann. CIRP
  doi: 10.1016/S0007-8506(07)62750-4
– start-page: 309
  year: 1987
  ident: 10.1016/S0360-8352(96)00056-3_BIB22
  article-title: EXCAP and ICAPP: integrated knowledge-based systems for process-planning components
– volume: 116
  start-page: 108
  year: 1994
  ident: 10.1016/S0360-8352(96)00056-3_BIB5
  article-title: A formal approach to intergrating computer-aided process planning and shop floor control
  publication-title: Trans. ASME, J. Engng Ind.
  doi: 10.1115/1.2901800
– volume: 37
  start-page: 591
  year: 1988
  ident: 10.1016/S0360-8352(96)00056-3_BIB11
  article-title: Computer-aided process planning: the present and the future
  publication-title: Ann. CIRP
  doi: 10.1016/S0007-8506(07)60756-2
– start-page: 41
  year: 1986
  ident: 10.1016/S0360-8352(96)00056-3_BIB19
  article-title: XPLANE, a knowledge-based driven process planning expert system
– start-page: 161
  year: 1987
  ident: 10.1016/S0360-8352(96)00056-3_BIB20
  article-title: TURBO-CAPP: a knowledge-based computer aided process planning system
– volume: 26
  start-page: 709
  year: 1994
  ident: 10.1016/S0360-8352(96)00056-3_BIB10
  article-title: OOPPS: an object-oriented process planning system
  publication-title: Computers Ind. Engng
  doi: 10.1016/0360-8352(94)90007-8
– volume: 2
  start-page: 127
  year: 1983
  ident: 10.1016/S0360-8352(96)00056-3_BIB4
  article-title: CAD/generative process planning with TIPPS
  publication-title: J. Manu. Systems
  doi: 10.1016/S0278-6125(83)80026-0
– volume: 35
  start-page: 325
  issue: 1
  year: 1986
  ident: 10.1016/S0360-8352(96)00056-3_BIB18
  article-title: XPLANE, a generative computer-aided process planning system for part manufacturing
  publication-title: Ann CIRP
  doi: 10.1016/S0007-8506(07)61899-X
– start-page: 47
  year: 1986
  ident: 10.1016/S0360-8352(96)00056-3_BIB2
  article-title: Use of artificial intelligence in automated process planning
  publication-title: Computers Mech. Engng
– volume: 33
  start-page: 303
  issue: 1
  year: 1984
  ident: 10.1016/S0360-8352(96)00056-3_BIB7
  article-title: The use of expert systems in process-planning
  publication-title: Ann. CIRP
  doi: 10.1016/S0007-8506(07)61431-0
– start-page: 329
  year: 1984
  ident: 10.1016/S0360-8352(96)00056-3_BIB8
  article-title: GARI: an expert system for process planning
– volume: 8
  start-page: 293
  year: 1987
  ident: 10.1016/S0360-8352(96)00056-3_BIB21
  article-title: Intelligent reasoning for process planning
  publication-title: Computers in Industry
  doi: 10.1016/0166-3615(87)90051-0
– volume: 35
  start-page: 413
  issue: 1
  year: 1986
  ident: 10.1016/S0360-8352(96)00056-3_BIB6
  article-title: An integrated approach to process planning and scheduling
  publication-title: Ann. CIRP
  doi: 10.1016/S0007-8506(07)61801-0
– volume: 31
  start-page: 329
  issue: 1
  year: 1982
  ident: 10.1016/S0360-8352(96)00056-3_BIB15
  article-title: The integration of CAD and CAM by application of artificial intelligence techniques
  publication-title: Ann. CIRP
  doi: 10.1016/S0007-8506(07)63322-8
SSID ssj0004591
Score 1.8211623
Snippet Effective and efficient implementation of intelligent and/or agile manufacturing systems requires an enterprise level integration. The first step in this...
A bidding-based approach to the integration of computer-aided design, process planning and real time scheduling is described. The product is represented in a...
SourceID proquest
pascalfrancis
crossref
elsevier
SourceType Aggregation Database
Index Database
Enrichment Source
Publisher
StartPage 477
SubjectTerms Agency theory
Applied sciences
Bidders
CAD
Computer aided design
Computer science; control theory; systems
Design specifications
Exact sciences and technology
Manufacturing
Object oriented programming
Operational research and scientific management
Operational research. Management science
Operations research
Process planning
Scheduling
Scheduling, sequencing
Software
Studies
Title Bidding-based process planning and scheduling in a multi-agent system
URI https://dx.doi.org/10.1016/S0360-8352(96)00056-3
https://www.proquest.com/docview/213756921
Volume 32
WOSCitedRecordID wos10_1016_S0360_8352_96_00056_3&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVESC
  databaseName: Elsevier SD Freedom Collection Journals 2021
  customDbUrl:
  eissn: 1879-0550
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0004591
  issn: 0360-8352
  databaseCode: AIEXJ
  dateStart: 19950101
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1Lb9QwELaWlgMI8SggllLkA5XgYJrYSRwfW7orQNVSia20N8uxE7TSKl32UfW_8GcZx86LCgoHLtHKkTeR5_M84pn5EHoDmyDjVCkSxSwhEbjsRIXCkCKNRKiF0HlSVGQTfDJJZzNxPhj8qGthrha8LNPra7H8r6KGMRC2LZ39B3E3fwoD8BuEDlcQO1z_SvAnc2PtEbH2yfYAqAoBLFt0RU5UHRZARAsWZuHLWZTLKiTKVln51s5dn7UmflhXMJm3XB9528uwSePZ9mrGTmyV5hYCcttl45dPrZPLlefyOvUVEsZX4_FOzoqFy3m--mZJkVy-SD91E0xjQKx_5yyNU68pFySIXavZWv-23zebMNgp08gRvNxQ8u57w9fmAeCKCxip6E8TwlrLVp_mT77I8cXZmZyOZtP-XRcHQZRLE8oP2Xj5nVhCMntwf8hOHTjuoF3KYwEqc_f402j2udOM3hEy1u_RFogdtS_3ViTv_Iv9zvV5sFRr2JCFY1K54RRUns70MXroQxR87KD1BA3ycg898uEK9sZgvYfud3pZPkWjHu6wxx2ucYcBd7jFHZ6XWOEO7rDD3TN0MR5NP3wknqOD6ChlG6JNkQpKVW4gUogUZ1wZAV5rlhZFFqoc_MM00JTl2iRZocGbLxINQUpGTaiiOGPP0U55WeYvEBY6oDzIQq4gSg55JoI0C0zIMmEo6LtkiKJ6-aT2Dewtj8pCtpmKsOrSrroUNlsTVl2yIXrfTFu6Di63TUhr2Ujvhjr3UgIAb5t60JNl80Ba9XUUQ7Rfy1Z6lbGWNGQ8TgQNX_7x7j661-7AV2hns9rmB-iuvtrM16vXHps_AUu5s4s
linkProvider Elsevier
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Bidding-based+process+planning+and+scheduling+in+a+multi-agent+system&rft.jtitle=Computers+%26+industrial+engineering&rft.au=Gu%2C+P&rft.au=Balasubramanian%2C+S&rft.au=Norrie%2C+D+H&rft.date=1997-04-01&rft.pub=Pergamon+Press+Inc&rft.issn=0360-8352&rft.eissn=1879-0550&rft.volume=32&rft.issue=2&rft.spage=477&rft_id=info:doi/10.1016%2FS0360-8352%2896%2900056-3&rft.externalDBID=NO_FULL_TEXT&rft.externalDocID=11842627
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0360-8352&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0360-8352&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0360-8352&client=summon