Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing
Assembly line balancing generally requires a set of acceptable solutions to the several conflicting objectives. In this study, a binary fuzzy goal programming approach is applied to assembly line balancing. Models for balancing straight and U-shaped assembly lines with fuzzy goals (the number of wor...
Uloženo v:
| Vydáno v: | European journal of operational research Ročník 195; číslo 2; s. 335 - 347 |
|---|---|
| Hlavní autoři: | , , |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Amsterdam
Elsevier B.V
01.06.2009
Elsevier Elsevier Sequoia S.A |
| Edice: | European Journal of Operational Research |
| Témata: | |
| ISSN: | 0377-2217, 1872-6860 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | Assembly line balancing generally requires a set of acceptable solutions to the several conflicting objectives. In this study, a binary fuzzy goal programming approach is applied to assembly line balancing. Models for balancing straight and U-shaped assembly lines with fuzzy goals (the number of workstations and cycle time goals) are proposed. The binary fuzzy goal programming models are solved using the methodology introduced by Chang [Chang, C.T., 2007. Binary fuzzy goal programming. European Journal of Operational Research 180 (1), 29–37]. An illustrative example is presented to demonstrate the validity of the proposed models and to compare the performance of straight and U-shaped line configurations. |
|---|---|
| Bibliografie: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 |
| ISSN: | 0377-2217 1872-6860 |
| DOI: | 10.1016/j.ejor.2008.01.003 |