Citace podle APA (7th ed.)

Hosseininasab, S., & Shetab-Boushehri, S. (2015). Integration of selecting and scheduling urban road construction projects as a time-dependent discrete network design problem. European journal of operational research, 246(3), 762-771. https://doi.org/10.1016/j.ejor.2015.05.039

Citace podle Chicago (17th ed.)

Hosseininasab, Seyyed-Mohammadreza, a Seyyed-Nader Shetab-Boushehri. "Integration of Selecting and Scheduling Urban Road Construction Projects as a Time-dependent Discrete Network Design Problem." European Journal of Operational Research 246, no. 3 (2015): 762-771. https://doi.org/10.1016/j.ejor.2015.05.039.

Citace podle MLA (9th ed.)

Hosseininasab, Seyyed-Mohammadreza, a Seyyed-Nader Shetab-Boushehri. "Integration of Selecting and Scheduling Urban Road Construction Projects as a Time-dependent Discrete Network Design Problem." European Journal of Operational Research, vol. 246, no. 3, 2015, pp. 762-771, https://doi.org/10.1016/j.ejor.2015.05.039.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..