Subramaniyan, M., Skoogh, A., Salomonsson, H., Bangalore, P., & Bokrantz, J. (2018). A data-driven algorithm to predict throughput bottlenecks in a production system based on active periods of the machines. Computers & industrial engineering, 125, 533-544. https://doi.org/10.1016/j.cie.2018.04.024
Citace podle Chicago (17th ed.)Subramaniyan, Mukund, Anders Skoogh, Hans Salomonsson, Pramod Bangalore, a Jon Bokrantz. "A Data-driven Algorithm to Predict Throughput Bottlenecks in a Production System Based on Active Periods of the Machines." Computers & Industrial Engineering 125 (2018): 533-544. https://doi.org/10.1016/j.cie.2018.04.024.
Citace podle MLA (9th ed.)Subramaniyan, Mukund, et al. "A Data-driven Algorithm to Predict Throughput Bottlenecks in a Production System Based on Active Periods of the Machines." Computers & Industrial Engineering, vol. 125, 2018, pp. 533-544, https://doi.org/10.1016/j.cie.2018.04.024.