Lin, W. (2018). Minimizing the Makespan for a Two-Stage Three-Machine Assembly Flow Shop Problem with the Sum-of-Processing-Time Based Learning Effect. Discrete dynamics in nature and society, 2018(2018), 1-15. https://doi.org/10.1155/2018/8170294
Chicago-Zitierstil (17. Ausg.)Lin, Win-Chin. "Minimizing the Makespan for a Two-Stage Three-Machine Assembly Flow Shop Problem with the Sum-of-Processing-Time Based Learning Effect." Discrete Dynamics in Nature and Society 2018, no. 2018 (2018): 1-15. https://doi.org/10.1155/2018/8170294.
MLA-Zitierstil (9. Ausg.)Lin, Win-Chin. "Minimizing the Makespan for a Two-Stage Three-Machine Assembly Flow Shop Problem with the Sum-of-Processing-Time Based Learning Effect." Discrete Dynamics in Nature and Society, vol. 2018, no. 2018, 2018, pp. 1-15, https://doi.org/10.1155/2018/8170294.