APA (7th ed.) Citation

Banaszak, Z., Zaremba, M., & Muszyński, W. (2009). Constraint programming for project-driven manufacturing. International journal of production economics, 120(2), 463-475. https://doi.org/10.1016/j.ijpe.2008.12.016

Chicago Style (17th ed.) Citation

Banaszak, Z.A, M.B Zaremba, and W. Muszyński. "Constraint Programming for Project-driven Manufacturing." International Journal of Production Economics 120, no. 2 (2009): 463-475. https://doi.org/10.1016/j.ijpe.2008.12.016.

MLA (9th ed.) Citation

Banaszak, Z.A, et al. "Constraint Programming for Project-driven Manufacturing." International Journal of Production Economics, vol. 120, no. 2, 2009, pp. 463-475, https://doi.org/10.1016/j.ijpe.2008.12.016.

Warning: These citations may not always be 100% accurate.