Citace podle APA (7th ed.)

Banaszak, Z., Zaremba, M., & Muszyński, W. (2009). Constraint programming for project-driven manufacturing. International journal of production economics, 120(2), 463-475. https://doi.org/10.1016/j.ijpe.2008.12.016

Citace podle Chicago (17th ed.)

Banaszak, Z.A, M.B Zaremba, a W. Muszyński. "Constraint Programming for Project-driven Manufacturing." International Journal of Production Economics 120, no. 2 (2009): 463-475. https://doi.org/10.1016/j.ijpe.2008.12.016.

Citace podle MLA (9th ed.)

Banaszak, Z.A, et al. "Constraint Programming for Project-driven Manufacturing." International Journal of Production Economics, vol. 120, no. 2, 2009, pp. 463-475, https://doi.org/10.1016/j.ijpe.2008.12.016.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..