Citace podle APA (7th ed.)

Kosztyán, Z. T., & Szalkai, I. (2020). Multimode resource-constrained project scheduling in flexible projects. Journal of global optimization, 76(1), 211-241. https://doi.org/10.1007/s10898-019-00832-8

Citace podle Chicago (17th ed.)

Kosztyán, Zsolt T., a István Szalkai. "Multimode Resource-constrained Project Scheduling in Flexible Projects." Journal of Global Optimization 76, no. 1 (2020): 211-241. https://doi.org/10.1007/s10898-019-00832-8.

Citace podle MLA (9th ed.)

Kosztyán, Zsolt T., a István Szalkai. "Multimode Resource-constrained Project Scheduling in Flexible Projects." Journal of Global Optimization, vol. 76, no. 1, 2020, pp. 211-241, https://doi.org/10.1007/s10898-019-00832-8.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..