Citace podle APA (7th ed.)

Shakeri, M., Low, M. Y. H., Turner, S. J., & Lee, E. W. (2012). A robust two-phase heuristic algorithm for the truck scheduling problem in a resource-constrained crossdock. Computers & operations research, 39(11), 2564-2577. https://doi.org/10.1016/j.cor.2012.01.002

Citace podle Chicago (17th ed.)

Shakeri, Mojtaba, Malcolm Yoke Hean Low, Stephen John Turner, a Eng Wah Lee. "A Robust Two-phase Heuristic Algorithm for the Truck Scheduling Problem in a Resource-constrained Crossdock." Computers & Operations Research 39, no. 11 (2012): 2564-2577. https://doi.org/10.1016/j.cor.2012.01.002.

Citace podle MLA (9th ed.)

Shakeri, Mojtaba, et al. "A Robust Two-phase Heuristic Algorithm for the Truck Scheduling Problem in a Resource-constrained Crossdock." Computers & Operations Research, vol. 39, no. 11, 2012, pp. 2564-2577, https://doi.org/10.1016/j.cor.2012.01.002.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..