Modifying lines-of-flight in the planning process for improved maintenance robustness

As a part of their planning process, airlines construct lines-of-flight ( LOFs ) – daily repeating sequences of flights, each of which will be flown by a single aircraft. In the week leading up to the actual day-of-operations, these LOFs are then assigned to specific aircraft ( tails), forming multi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Computers & operations research Jg. 39; H. 9; S. 2051 - 2062
Hauptverfasser: Lapp, Marcial, Cohn, Amy
Format: Journal Article
Sprache:Englisch
Veröffentlicht: Kidlington Elsevier Ltd 01.09.2012
Elsevier
Pergamon Press Inc
Schlagworte:
ISSN:0305-0548, 1873-765X, 0305-0548
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:As a part of their planning process, airlines construct lines-of-flight ( LOFs ) – daily repeating sequences of flights, each of which will be flown by a single aircraft. In the week leading up to the actual day-of-operations, these LOFs are then assigned to specific aircraft ( tails), forming multi-day aircraft routings that in turn enable the scheduling of routine maintenance checks. Operational disruptions, however, can lead to deviations from these routings, which in turn disrupt the maintenance plan. The goal of our research is to improve the construction of LOFs so as to increase the likelihood of being able to recover from maintenance disruptions without costly over-the-day aircraft swaps. We present a new metric, maintenance reachability ( MR), which measures the robustness of a planned set of LOFs, and develop a mathematical programming approach to improving the MR of a given set of LOFs. We provide computational results based on data from a major U.S. carrier demonstrating that significant improvements in MR can be achieved with only a small number of changes to the original set of LOFs. Finally, we conclude by showing that even under imperfect input data, MR can be improved relative to a planned set of LOFs.
Bibliographie:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ObjectType-Article-2
content type line 23
ISSN:0305-0548
1873-765X
0305-0548
DOI:10.1016/j.cor.2011.08.024