A stochastic production planning problem with nonlinear cost

Most production planning models are deterministic and often assume a linear relation between production volume and production cost. In this paper, we investigate a production planning problem in a steel production process considering the energy consumption cost which is a nonlinear function of the p...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Computers & operations research Jg. 39; H. 9; S. 1977 - 1987
Hauptverfasser: Tang, Lixin, Che, Ping, Liu, Jiyin
Format: Journal Article
Sprache:Englisch
Veröffentlicht: Kidlington Elsevier Ltd 01.09.2012
Elsevier
Pergamon Press Inc
Schlagworte:
ISSN:0305-0548, 1873-765X, 0305-0548
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Most production planning models are deterministic and often assume a linear relation between production volume and production cost. In this paper, we investigate a production planning problem in a steel production process considering the energy consumption cost which is a nonlinear function of the production quantity. Due to the uncertain environment, the production demands are stochastic. Taking a scenario-based approach to express the stochastic demands according to the knowledge of planners on the demand distributions, we formulate the stochastic production planning problem as a mixed integer nonlinear programming (MINLP) model. Approximated with the piecewise linear functions, the MINLP model is transformed into a mixed integer linear programming model. The approximation error can be improved by adjusting the linearization ranges repeatedly. Based on the piecewise linearization, a stepwise Lagrangian relaxation (SLR) heuristic for the problem is proposed where variable splitting is introduced during Lagrangian relaxation (LR). After decomposition, one subproblem is solved by linear programming and the other is solved by an effective polynomial time algorithm. The SLR heuristic is tested on a large set of problem instances and the results show that the algorithm generates solutions very close to optimums in an acceptable time. The impact of demand uncertainty on the solution is studied by a computational discussion on scenario generation.
Bibliographie:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ObjectType-Article-2
content type line 23
ISSN:0305-0548
1873-765X
0305-0548
DOI:10.1016/j.cor.2011.09.007