Hybridizing a multi-objective simulated annealing algorithm with a multi-objective evolutionary algorithm to solve a multi-objective project scheduling problem

► We address a multi-objective project scheduling problem. ► Objectives: minimize project makespan and maximize effectiveness of human resources. ► To solve the problem, we propose a multi-objective hybrid algorithm. ► Integrating a simulated annealing algorithm and an evolutionary algorithm. ► The...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Expert systems with applications Jg. 40; H. 7; S. 2421 - 2434
Hauptverfasser: Yannibelli, Virginia, Amandi, Analía
Format: Journal Article
Sprache:Englisch
Veröffentlicht: Amsterdam Elsevier Ltd 01.06.2013
Elsevier
Schlagworte:
ISSN:0957-4174, 1873-6793
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Abstract ► We address a multi-objective project scheduling problem. ► Objectives: minimize project makespan and maximize effectiveness of human resources. ► To solve the problem, we propose a multi-objective hybrid algorithm. ► Integrating a simulated annealing algorithm and an evolutionary algorithm. ► The proposed hybrid algorithm outperforms the existing algorithm for the problem. In this paper, a multi-objective project scheduling problem is addressed. This problem considers two conflicting, priority optimization objectives for project managers. One of these objectives is to minimize the project makespan. The other objective is to assign the most effective set of human resources to each project activity. To solve the problem, a multi-objective hybrid search and optimization algorithm is proposed. This algorithm is composed by a multi-objective simulated annealing algorithm and a multi-objective evolutionary algorithm. The multi-objective simulated annealing algorithm is integrated into the multi-objective evolutionary algorithm to improve the performance of the evolutionary-based search. To achieve this, the behavior of the multi-objective simulated annealing algorithm is self-adaptive to either an exploitation process or an exploration process depending on the state of the evolutionary-based search. The multi-objective hybrid algorithm generates a number of near non-dominated solutions so as to provide solutions with different trade-offs between the optimization objectives to project managers. The performance of the multi-objective hybrid algorithm is evaluated on nine different instance sets, and is compared with that of the only multi-objective algorithm previously proposed in the literature for solving the addressed problem. The performance comparison shows that the multi-objective hybrid algorithm significantly outperforms the previous multi-objective algorithm.
AbstractList In this paper, a multi-objective project scheduling problem is addressed. This problem considers two conflicting, priority optimization objectives for project managers. One of these objectives is to minimize the project makespan. The other objective is to assign the most effective set of human resources to each project activity. To solve the problem, a multi-objective hybrid search and optimization algorithm is proposed. This algorithm is composed by a multi-objective simulated annealing algorithm and a multi-objective evolutionary algorithm. The multi-objective simulated annealing algorithm is integrated into the multi-objective evolutionary algorithm to improve the performance of the evolutionary-based search. To achieve this, the behavior of the multi-objective simulated annealing algorithm is self-adaptive to either an exploitation process or an exploration process depending on the state of the evolutionary-based search. The multi-objective hybrid algorithm generates a number of near non-dominated solutions so as to provide solutions with different trade-offs between the optimization objectives to project managers. The performance of the multi-objective hybrid algorithm is evaluated on nine different instance sets, and is compared with that of the only multi-objective algorithm previously proposed in the literature for solving the addressed problem. The performance comparison shows that the multi-objective hybrid algorithm significantly outperforms the previous multi-objective algorithm.
► We address a multi-objective project scheduling problem. ► Objectives: minimize project makespan and maximize effectiveness of human resources. ► To solve the problem, we propose a multi-objective hybrid algorithm. ► Integrating a simulated annealing algorithm and an evolutionary algorithm. ► The proposed hybrid algorithm outperforms the existing algorithm for the problem. In this paper, a multi-objective project scheduling problem is addressed. This problem considers two conflicting, priority optimization objectives for project managers. One of these objectives is to minimize the project makespan. The other objective is to assign the most effective set of human resources to each project activity. To solve the problem, a multi-objective hybrid search and optimization algorithm is proposed. This algorithm is composed by a multi-objective simulated annealing algorithm and a multi-objective evolutionary algorithm. The multi-objective simulated annealing algorithm is integrated into the multi-objective evolutionary algorithm to improve the performance of the evolutionary-based search. To achieve this, the behavior of the multi-objective simulated annealing algorithm is self-adaptive to either an exploitation process or an exploration process depending on the state of the evolutionary-based search. The multi-objective hybrid algorithm generates a number of near non-dominated solutions so as to provide solutions with different trade-offs between the optimization objectives to project managers. The performance of the multi-objective hybrid algorithm is evaluated on nine different instance sets, and is compared with that of the only multi-objective algorithm previously proposed in the literature for solving the addressed problem. The performance comparison shows that the multi-objective hybrid algorithm significantly outperforms the previous multi-objective algorithm.
Author Yannibelli, Virginia
Amandi, Analía
Author_xml – sequence: 1
  givenname: Virginia
  surname: Yannibelli
  fullname: Yannibelli, Virginia
  email: vyannibe@exa.unicen.edu.ar
  organization: ISISTAN Research Institute, Fac. Cs. Exactas, UNCPBA, Campus Universitario, Paraje Arroyo Seco, Tandil 7000, Buenos Aires, Argentina
– sequence: 2
  givenname: Analía
  surname: Amandi
  fullname: Amandi, Analía
  email: amandi@exa.unicen.edu.ar
  organization: ISISTAN Research Institute, Fac. Cs. Exactas, UNCPBA, Campus Universitario, Paraje Arroyo Seco, Tandil 7000, Buenos Aires, Argentina
BackLink http://pascal-francis.inist.fr/vibad/index.php?action=getRecordDetail&idt=27100255$$DView record in Pascal Francis
BookMark eNqFkUFrFTEUhYNU8PXpH3A1G8HNvN5kMpMZcCNFrVBwo-uQSe60eWSSmmReqX_Gv2qmr0JRqQSScHK-GzjnlJz44JGQ1xR2FGh3tt9hulU7BpQVYQdt_4xsaC-auhNDc0I2MLSi5lTwF-Q0pT0AFQBiQ35e3I3RGvvD-qtKVfPisq3DuEed7QGrZIuiMppKeY_K3bvcVYg2X8_Vbdn_AeEhuCXb4FW8e-TOoUrBlfe_iZsY1muV9DWa5f6XIo0O55fk-aRcwlcP55Z8-_jh6_lFffnl0-fz95e15hxybQzTnR4Eg3aAkTW6n6YWtBlo2wGOwAQfTS8UnziMpqwJR84nyrgQoulMsyVvj3PLv98XTFnONml0TnkMS5IlLgr90HfN_62c94L1ogS_JW8erCpp5aaovLZJ3kQ7l2wkExSAtW3x9UefjiGliJPUNqs1whyVdZKCXGuWe7nWLNeaV63UXFD2B_p7-pPQuyOEJdKDxSiTtug1GhtLD9IE-xT-C5jQyBo
CitedBy_id crossref_primary_10_1155_2019_8134674
crossref_primary_10_1016_j_scs_2016_12_013
crossref_primary_10_1007_s10479_023_05580_3
crossref_primary_10_1016_j_advengsoft_2013_11_004
crossref_primary_10_3390_jmse10121890
crossref_primary_10_1007_s40565_014_0081_z
crossref_primary_10_1016_j_asoc_2025_112776
crossref_primary_10_1016_j_cie_2019_106183
crossref_primary_10_1007_s00521_018_3472_7
crossref_primary_10_1016_j_engappai_2024_108572
crossref_primary_10_1016_j_tre_2020_102060
crossref_primary_10_4018_IJORIS_2020010102
crossref_primary_10_1155_2015_841637
crossref_primary_10_1108_JM2_06_2023_0123
crossref_primary_10_1016_j_asoc_2020_106382
crossref_primary_10_1016_j_ejor_2022_05_049
crossref_primary_10_1016_j_cie_2020_106620
crossref_primary_10_1007_s10668_024_05066_7
crossref_primary_10_1016_j_ejor_2021_05_004
crossref_primary_10_1080_23302674_2025_2456212
crossref_primary_10_1016_j_asoc_2015_10_042
crossref_primary_10_1007_s42461_024_01005_2
crossref_primary_10_1016_j_cie_2022_108240
crossref_primary_10_1007_s00500_014_1455_x
crossref_primary_10_1007_s11750_022_00633_5
crossref_primary_10_1016_j_advengsoft_2016_04_001
crossref_primary_10_1177_1687814015573785
crossref_primary_10_1016_j_apm_2014_04_009
crossref_primary_10_1016_j_eswa_2015_04_009
crossref_primary_10_1007_s12652_018_0816_1
crossref_primary_10_1016_j_asoc_2017_05_030
crossref_primary_10_1016_j_eswa_2021_115338
crossref_primary_10_1016_j_cie_2021_107855
crossref_primary_10_1016_j_oceaneng_2024_117796
crossref_primary_10_1016_j_cie_2016_06_009
crossref_primary_10_1016_j_compag_2017_05_034
crossref_primary_10_1016_j_cor_2025_107158
crossref_primary_10_1016_j_eswa_2019_112836
crossref_primary_10_1007_s12597_020_00450_z
crossref_primary_10_1016_j_asoc_2017_10_014
crossref_primary_10_1016_j_engappai_2014_03_010
crossref_primary_10_2478_mspe_2024_0012
crossref_primary_10_1007_s00500_017_2997_5
crossref_primary_10_1007_s00607_018_0625_6
Cites_doi 10.1016/j.ejor.2004.07.014
10.1037/0021-9010.83.3.377
10.1109/TEVC.2008.2004262
10.1016/j.ins.2010.02.019
10.1016/j.eswa.2008.10.031
10.1007/s10951-008-0079-3
10.1002/(SICI)1520-6750(199810)45:7<733::AID-NAV5>3.0.CO;2-C
10.1016/j.ress.2005.11.018
10.1016/j.ejor.2007.11.008
10.1016/j.neucom.2011.06.021
10.1109/TEVC.2003.810752
10.1016/j.ijpe.2006.08.021
10.1007/s10100-008-0057-z
10.1016/0166-218X(83)90012-4
10.1115/1.1329875
10.1016/j.eswa.2011.01.035
10.1007/s00291-009-0169-4
ContentType Journal Article
Copyright 2012 Elsevier Ltd
2014 INIST-CNRS
Copyright_xml – notice: 2012 Elsevier Ltd
– notice: 2014 INIST-CNRS
DBID AAYXX
CITATION
IQODW
7SC
8FD
JQ2
L7M
L~C
L~D
DOI 10.1016/j.eswa.2012.10.058
DatabaseName CrossRef
Pascal-Francis
Computer and Information Systems Abstracts
Technology Research Database
ProQuest Computer Science Collection
Advanced Technologies Database with Aerospace
Computer and Information Systems Abstracts – Academic
Computer and Information Systems Abstracts Professional
DatabaseTitle CrossRef
Computer and Information Systems Abstracts
Technology Research Database
Computer and Information Systems Abstracts – Academic
Advanced Technologies Database with Aerospace
ProQuest Computer Science Collection
Computer and Information Systems Abstracts Professional
DatabaseTitleList Computer and Information Systems Abstracts

Computer and Information Systems Abstracts
DeliveryMethod fulltext_linktorsrc
Discipline Computer Science
Applied Sciences
EISSN 1873-6793
EndPage 2434
ExternalDocumentID 27100255
10_1016_j_eswa_2012_10_058
S0957417412011827
GroupedDBID --K
--M
.DC
.~1
0R~
13V
1B1
1RT
1~.
1~5
4.4
457
4G.
5GY
5VS
7-5
71M
8P~
9JN
9JO
AAAKF
AABNK
AACTN
AAEDT
AAEDW
AAIAV
AAIKJ
AAKOC
AALRI
AAOAW
AAQFI
AARIN
AAXUO
AAYFN
ABBOA
ABFNM
ABMAC
ABMVD
ABUCO
ABXDB
ABYKQ
ACDAQ
ACGFS
ACHRH
ACNTT
ACRLP
ACZNC
ADBBV
ADEZE
ADTZH
AEBSH
AECPX
AEKER
AENEX
AFKWA
AFTJW
AGHFR
AGJBL
AGUBO
AGUMN
AGYEJ
AHHHB
AHJVU
AHZHX
AIALX
AIEXJ
AIKHN
AITUG
AJBFU
AJOXV
ALEQD
ALMA_UNASSIGNED_HOLDINGS
AMFUW
AMRAJ
AOUOD
APLSM
AXJTR
BJAXD
BKOJK
BLXMC
BNSAS
CS3
DU5
EBS
EFJIC
EFLBG
EJD
EO8
EO9
EP2
EP3
F5P
FDB
FIRID
FNPLU
FYGXN
G-Q
GBLVA
GBOLZ
HAMUX
IHE
J1W
JJJVA
KOM
LG9
LY1
LY7
M41
MO0
N9A
O-L
O9-
OAUVE
OZT
P-8
P-9
P2P
PC.
PQQKQ
Q38
RIG
ROL
RPZ
SDF
SDG
SDP
SDS
SES
SPC
SPCBC
SSB
SSD
SSL
SST
SSV
SSZ
T5K
TN5
~G-
29G
9DU
AAAKG
AAQXK
AATTM
AAXKI
AAYWO
AAYXX
ABJNI
ABKBG
ABUFD
ABWVN
ACLOT
ACNNM
ACRPL
ACVFH
ADCNI
ADJOM
ADMUD
ADNMO
AEIPS
AEUPX
AFJKZ
AFPUW
AGQPQ
AIGII
AIIUN
AKBMS
AKRWK
AKYEP
ANKPU
APXCP
ASPBG
AVWKF
AZFZN
CITATION
EFKBS
FEDTE
FGOYB
G-2
HLZ
HVGLF
HZ~
R2-
SBC
SET
SEW
WUQ
XPP
ZMT
~HD
BNPGV
IQODW
SSH
7SC
8FD
JQ2
L7M
L~C
L~D
ID FETCH-LOGICAL-c440t-dd2c6c9720590b23c8ff50cd91560eb0274bd87a4f40bdbdbfeb44f12477736d3
ISICitedReferencesCount 56
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000315616500007&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 0957-4174
IngestDate Wed Oct 01 15:00:35 EDT 2025
Sun Sep 28 05:51:18 EDT 2025
Wed Apr 02 07:49:45 EDT 2025
Sat Nov 29 04:44:34 EST 2025
Tue Nov 18 20:35:36 EST 2025
Fri Feb 23 02:26:29 EST 2024
IsDoiOpenAccess false
IsOpenAccess true
IsPeerReviewed true
IsScholarly true
Issue 7
Keywords Non-dominated solutions
Multi-objective project scheduling
Multi-objective evolutionary algorithm
Multi-objective hybrid algorithm
Multi-objective simulated annealing algorithm
Human capital
Adaptive algorithm
Software development
Evolutionary algorithm
Project management
Priority
Adaptability
Multiobjective programming
Staff management
Scheduling
Makespan
Optimization
Search algorithm
Human activity
Genetic algorithm
Simulated annealing
Problem solving
Hybrid model
Human resource management
Language English
License https://www.elsevier.com/tdm/userlicense/1.0
CC BY 4.0
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-c440t-dd2c6c9720590b23c8ff50cd91560eb0274bd87a4f40bdbdbfeb44f12477736d3
Notes ObjectType-Article-2
SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 23
ObjectType-Article-1
ObjectType-Feature-2
OpenAccessLink https://www.sciencedirect.com/science/article/pii/S0957417412011827
PQID 1448728779
PQPubID 23500
PageCount 14
ParticipantIDs proquest_miscellaneous_1701089863
proquest_miscellaneous_1448728779
pascalfrancis_primary_27100255
crossref_citationtrail_10_1016_j_eswa_2012_10_058
crossref_primary_10_1016_j_eswa_2012_10_058
elsevier_sciencedirect_doi_10_1016_j_eswa_2012_10_058
PublicationCentury 2000
PublicationDate 2013-06-01
PublicationDateYYYYMMDD 2013-06-01
PublicationDate_xml – month: 06
  year: 2013
  text: 2013-06-01
  day: 01
PublicationDecade 2010
PublicationPlace Amsterdam
PublicationPlace_xml – name: Amsterdam
PublicationTitle Expert systems with applications
PublicationYear 2013
Publisher Elsevier Ltd
Elsevier
Publisher_xml – name: Elsevier Ltd
– name: Elsevier
References Deb (b0045) 2009
Corchado, Abraham, Carvalho (b0035) 2010; 180
Barrick, Stewart, Neubert, Mount (b0010) 1998; 83
Bellenguez, O. (2008). A reactive approach for the multi-skill project scheduling problem. In
Corchado, Graña, Wozniak (b0040) 2012; 75
Coello Coello, Lamont, Veldhuizen (b0030) 2007
Yannibelli, Amandi (b0140) 2012
Goldberg (b0060) 2007
Kolisch, Hartmann (b0095) 1999
Hartmann (b0075) 1998; 45
Lee, S., Von Allmen, P., Fink, W., Petropoulos, A. E., & Terrile, R.J. (2005). Comparison of multi-objective genetic algorithms in optimizing Q-law low-thrust orbit transfers. In
Ishibuchi, Yoshida, Murata (b0090) 2003; 7
Drezet, Billaut (b0050) 2008; 112
Yannibelli, Amandi (b0135) 2011; 38
Aickelin, Burke, Li (b0005) 2009; 13
Hanne, Nickel (b0070) 2005; 167
Eiben, Smith (b0055) 2007
Wu, Azarm (b0125) 2001; 123
Heimerl, Kolisch (b0085) 2010; 32
Gutjahr, Katzensteiner, Reiter, Stummer, Denk (b0065) 2008; 16
Lau, Chan, Tsui, Chan, Ho, Choy (b0105) 2009; 36
Yannibelli, Amandi (b0145) 2012; Vol. 7208
Blazewicz, Lenstra, Rinnooy Kan (b0025) 1983; 5
Heerkens (b0080) 2002
Valls, Pérez, Quintanilla (b0120) 2009; 193
25–29 June, Washington DC.
Bellenguez, Néron (b0020) 2005; Vol. 3616
(pp.18–22) August, Montreal.
Konak, Coit, Smith (b0100) 2006; 91
Li, Womer (b0115) 2009; 12
Wysocki (b0130) 2003
Bellenguez (10.1016/j.eswa.2012.10.058_b0020) 2005; Vol. 3616
Wu (10.1016/j.eswa.2012.10.058_b0125) 2001; 123
Eiben (10.1016/j.eswa.2012.10.058_b0055) 2007
Ishibuchi (10.1016/j.eswa.2012.10.058_b0090) 2003; 7
Kolisch (10.1016/j.eswa.2012.10.058_b0095) 1999
Heerkens (10.1016/j.eswa.2012.10.058_b0080) 2002
Goldberg (10.1016/j.eswa.2012.10.058_b0060) 2007
Yannibelli (10.1016/j.eswa.2012.10.058_b0135) 2011; 38
Wysocki (10.1016/j.eswa.2012.10.058_b0130) 2003
Valls (10.1016/j.eswa.2012.10.058_b0120) 2009; 193
Corchado (10.1016/j.eswa.2012.10.058_b0040) 2012; 75
Barrick (10.1016/j.eswa.2012.10.058_b0010) 1998; 83
Deb (10.1016/j.eswa.2012.10.058_b0045) 2009
Yannibelli (10.1016/j.eswa.2012.10.058_b0145) 2012; Vol. 7208
10.1016/j.eswa.2012.10.058_b0015
Hanne (10.1016/j.eswa.2012.10.058_b0070) 2005; 167
10.1016/j.eswa.2012.10.058_b0110
Corchado (10.1016/j.eswa.2012.10.058_b0035) 2010; 180
Blazewicz (10.1016/j.eswa.2012.10.058_b0025) 1983; 5
Aickelin (10.1016/j.eswa.2012.10.058_b0005) 2009; 13
Konak (10.1016/j.eswa.2012.10.058_b0100) 2006; 91
Li (10.1016/j.eswa.2012.10.058_b0115) 2009; 12
Yannibelli (10.1016/j.eswa.2012.10.058_b0140) 2012
Coello Coello (10.1016/j.eswa.2012.10.058_b0030) 2007
Drezet (10.1016/j.eswa.2012.10.058_b0050) 2008; 112
Gutjahr (10.1016/j.eswa.2012.10.058_b0065) 2008; 16
Heimerl (10.1016/j.eswa.2012.10.058_b0085) 2010; 32
Lau (10.1016/j.eswa.2012.10.058_b0105) 2009; 36
Hartmann (10.1016/j.eswa.2012.10.058_b0075) 1998; 45
References_xml – volume: 13
  start-page: 433
  year: 2009
  end-page: 443
  ident: b0005
  article-title: An evolutionary squeaky wheel optimization approach to personnel scheduling
  publication-title: IEEE Transactions on Evolutionary Computation
– volume: 7
  start-page: 204
  year: 2003
  end-page: 223
  ident: b0090
  article-title: Balance between genetic search and local search in memetic algorithms for multiobjective permutation flowshop scheduling
  publication-title: IEEE Transactions on Evolutionary Computation
– volume: 12
  start-page: 281
  year: 2009
  end-page: 298
  ident: b0115
  article-title: Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm
  publication-title: Journal of Scheduling
– volume: 91
  start-page: 992
  year: 2006
  end-page: 1007
  ident: b0100
  article-title: Multi-objective optimization using genetic algorithms: A tutorial
  publication-title: Reliability Engineering and System Safety
– volume: 112
  start-page: 217
  year: 2008
  end-page: 225
  ident: b0050
  article-title: A project scheduling problem with labour constraints and time-dependent activities requirements
  publication-title: International Journal of Production Economics
– volume: 45
  start-page: 733
  year: 1998
  end-page: 750
  ident: b0075
  article-title: A competitive genetic algorithm for resource-constrained project scheduling
  publication-title: Naval Research Logistics
– reference: Bellenguez, O. (2008). A reactive approach for the multi-skill project scheduling problem. In
– volume: 193
  start-page: 791
  year: 2009
  end-page: 804
  ident: b0120
  article-title: Skilled workforce scheduling in service centers
  publication-title: European Journal of Operational Research
– volume: 180
  start-page: 2633
  year: 2010
  end-page: 2634
  ident: b0035
  article-title: Hybrid intelligent algorithms and applications
  publication-title: Information Sciences
– volume: Vol. 3616
  start-page: 229
  year: 2005
  end-page: 243
  ident: b0020
  article-title: Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills
  publication-title: PATAT 2004, lecture notes in computer science
– volume: 75
  start-page: 61
  year: 2012
  end-page: 63
  ident: b0040
  article-title: New trends and applications on hybrid artificial intelligence systems
  publication-title: Neurocomputing
– year: 2009
  ident: b0045
  article-title: Multi-objective optimization using evolutionary algorithms
– year: 2002
  ident: b0080
  article-title: Project management
– volume: 5
  start-page: 11
  year: 1983
  end-page: 24
  ident: b0025
  article-title: Scheduling subject to resource constraints: Classification and complexity
  publication-title: Discrete Applied Mathematics
– volume: 38
  start-page: 8403
  year: 2011
  end-page: 8413
  ident: b0135
  article-title: A knowledge-based evolutionary assistant to software development project scheduling
  publication-title: Expert Systems with Applications
– year: 2003
  ident: b0130
  article-title: Effective project management
– year: 2007
  ident: b0060
  article-title: Genetic algorithms in search, optimization, and machine learning
– volume: 32
  start-page: 343
  year: 2010
  end-page: 368
  ident: b0085
  article-title: Scheduling and staffing multiple projects with a multi-skilled workforce
  publication-title: OR Spectrum
– reference: (pp.18–22) August, Montreal.
– start-page: 147
  year: 1999
  end-page: 178
  ident: b0095
  article-title: Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
  publication-title: Project scheduling: Recent models, algorithms and applications
– year: 2007
  ident: b0030
  article-title: Evolutionary algorithms for solving multi-objectives problems
– volume: 83
  start-page: 377
  year: 1998
  end-page: 391
  ident: b0010
  article-title: Relating member ability and personality to work-team processes and team effectiveness
  publication-title: Journal of Applied Psychology
– reference: Lee, S., Von Allmen, P., Fink, W., Petropoulos, A. E., & Terrile, R.J. (2005). Comparison of multi-objective genetic algorithms in optimizing Q-law low-thrust orbit transfers. In
– year: 2007
  ident: b0055
  article-title: Introduction to evolutionary computing
– reference: 25–29 June, Washington DC.
– volume: Vol. 7208
  start-page: 159
  year: 2012
  end-page: 173
  ident: b0145
  article-title: A memetic approach to project scheduling that maximizes the effectiveness of the human resources assigned to project activities
  publication-title: HAIS 2012, part I, lecture notes in computer science
– volume: 36
  start-page: 8255
  year: 2009
  end-page: 8268
  ident: b0105
  article-title: A fuzzy guided multi-objective evolutionary algorithm model for solving transportation problem
  publication-title: Expert Systems with Applications
– volume: 167
  start-page: 663
  year: 2005
  end-page: 678
  ident: b0070
  article-title: A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects
  publication-title: European Journal of Operational Research
– volume: 16
  start-page: 281
  year: 2008
  end-page: 306
  ident: b0065
  article-title: Competence-driven project portfolio selection, scheduling and staff assignment
  publication-title: Central European Journal of Operations Research
– year: 2012
  ident: b0140
  article-title: Project scheduling: A multi-objective evolutionary algorithm that optimizes the effectiveness of human resources and the project makespan
  publication-title: Engineering Optimization
– volume: 123
  start-page: 18
  year: 2001
  end-page: 25
  ident: b0125
  article-title: Metrics for quality assessment of a multiobjective design optimization solution set
  publication-title: Transactions of the ASME, Journal of Mechanical Design
– volume: Vol. 7208
  start-page: 159
  year: 2012
  ident: 10.1016/j.eswa.2012.10.058_b0145
  article-title: A memetic approach to project scheduling that maximizes the effectiveness of the human resources assigned to project activities
– volume: Vol. 3616
  start-page: 229
  year: 2005
  ident: 10.1016/j.eswa.2012.10.058_b0020
  article-title: Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills
– volume: 167
  start-page: 663
  issue: 3
  year: 2005
  ident: 10.1016/j.eswa.2012.10.058_b0070
  article-title: A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2004.07.014
– volume: 83
  start-page: 377
  issue: 3
  year: 1998
  ident: 10.1016/j.eswa.2012.10.058_b0010
  article-title: Relating member ability and personality to work-team processes and team effectiveness
  publication-title: Journal of Applied Psychology
  doi: 10.1037/0021-9010.83.3.377
– volume: 13
  start-page: 433
  issue: 2
  year: 2009
  ident: 10.1016/j.eswa.2012.10.058_b0005
  article-title: An evolutionary squeaky wheel optimization approach to personnel scheduling
  publication-title: IEEE Transactions on Evolutionary Computation
  doi: 10.1109/TEVC.2008.2004262
– volume: 180
  start-page: 2633
  issue: 14
  year: 2010
  ident: 10.1016/j.eswa.2012.10.058_b0035
  article-title: Hybrid intelligent algorithms and applications
  publication-title: Information Sciences
  doi: 10.1016/j.ins.2010.02.019
– year: 2003
  ident: 10.1016/j.eswa.2012.10.058_b0130
– volume: 36
  start-page: 8255
  issue: 4
  year: 2009
  ident: 10.1016/j.eswa.2012.10.058_b0105
  article-title: A fuzzy guided multi-objective evolutionary algorithm model for solving transportation problem
  publication-title: Expert Systems with Applications
  doi: 10.1016/j.eswa.2008.10.031
– volume: 12
  start-page: 281
  issue: 3
  year: 2009
  ident: 10.1016/j.eswa.2012.10.058_b0115
  article-title: Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm
  publication-title: Journal of Scheduling
  doi: 10.1007/s10951-008-0079-3
– volume: 45
  start-page: 733
  issue: 7
  year: 1998
  ident: 10.1016/j.eswa.2012.10.058_b0075
  article-title: A competitive genetic algorithm for resource-constrained project scheduling
  publication-title: Naval Research Logistics
  doi: 10.1002/(SICI)1520-6750(199810)45:7<733::AID-NAV5>3.0.CO;2-C
– year: 2009
  ident: 10.1016/j.eswa.2012.10.058_b0045
– volume: 91
  start-page: 992
  issue: 9
  year: 2006
  ident: 10.1016/j.eswa.2012.10.058_b0100
  article-title: Multi-objective optimization using genetic algorithms: A tutorial
  publication-title: Reliability Engineering and System Safety
  doi: 10.1016/j.ress.2005.11.018
– ident: 10.1016/j.eswa.2012.10.058_b0110
– volume: 193
  start-page: 791
  issue: 3
  year: 2009
  ident: 10.1016/j.eswa.2012.10.058_b0120
  article-title: Skilled workforce scheduling in service centers
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2007.11.008
– year: 2007
  ident: 10.1016/j.eswa.2012.10.058_b0030
– volume: 75
  start-page: 61
  issue: 1
  year: 2012
  ident: 10.1016/j.eswa.2012.10.058_b0040
  article-title: New trends and applications on hybrid artificial intelligence systems
  publication-title: Neurocomputing
  doi: 10.1016/j.neucom.2011.06.021
– year: 2002
  ident: 10.1016/j.eswa.2012.10.058_b0080
– volume: 7
  start-page: 204
  issue: 2
  year: 2003
  ident: 10.1016/j.eswa.2012.10.058_b0090
  article-title: Balance between genetic search and local search in memetic algorithms for multiobjective permutation flowshop scheduling
  publication-title: IEEE Transactions on Evolutionary Computation
  doi: 10.1109/TEVC.2003.810752
– year: 2007
  ident: 10.1016/j.eswa.2012.10.058_b0060
– volume: 112
  start-page: 217
  issue: 1
  year: 2008
  ident: 10.1016/j.eswa.2012.10.058_b0050
  article-title: A project scheduling problem with labour constraints and time-dependent activities requirements
  publication-title: International Journal of Production Economics
  doi: 10.1016/j.ijpe.2006.08.021
– volume: 16
  start-page: 281
  issue: 3
  year: 2008
  ident: 10.1016/j.eswa.2012.10.058_b0065
  article-title: Competence-driven project portfolio selection, scheduling and staff assignment
  publication-title: Central European Journal of Operations Research
  doi: 10.1007/s10100-008-0057-z
– year: 2007
  ident: 10.1016/j.eswa.2012.10.058_b0055
– volume: 5
  start-page: 11
  issue: 1
  year: 1983
  ident: 10.1016/j.eswa.2012.10.058_b0025
  article-title: Scheduling subject to resource constraints: Classification and complexity
  publication-title: Discrete Applied Mathematics
  doi: 10.1016/0166-218X(83)90012-4
– volume: 123
  start-page: 18
  year: 2001
  ident: 10.1016/j.eswa.2012.10.058_b0125
  article-title: Metrics for quality assessment of a multiobjective design optimization solution set
  publication-title: Transactions of the ASME, Journal of Mechanical Design
  doi: 10.1115/1.1329875
– ident: 10.1016/j.eswa.2012.10.058_b0015
– volume: 38
  start-page: 8403
  issue: 7
  year: 2011
  ident: 10.1016/j.eswa.2012.10.058_b0135
  article-title: A knowledge-based evolutionary assistant to software development project scheduling
  publication-title: Expert Systems with Applications
  doi: 10.1016/j.eswa.2011.01.035
– start-page: 147
  year: 1999
  ident: 10.1016/j.eswa.2012.10.058_b0095
  article-title: Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
– volume: 32
  start-page: 343
  issue: 4
  year: 2010
  ident: 10.1016/j.eswa.2012.10.058_b0085
  article-title: Scheduling and staffing multiple projects with a multi-skilled workforce
  publication-title: OR Spectrum
  doi: 10.1007/s00291-009-0169-4
– year: 2012
  ident: 10.1016/j.eswa.2012.10.058_b0140
  article-title: Project scheduling: A multi-objective evolutionary algorithm that optimizes the effectiveness of human resources and the project makespan
  publication-title: Engineering Optimization
SSID ssj0017007
Score 2.3302784
Snippet ► We address a multi-objective project scheduling problem. ► Objectives: minimize project makespan and maximize effectiveness of human resources. ► To solve...
In this paper, a multi-objective project scheduling problem is addressed. This problem considers two conflicting, priority optimization objectives for project...
SourceID proquest
pascalfrancis
crossref
elsevier
SourceType Aggregation Database
Index Database
Enrichment Source
Publisher
StartPage 2421
SubjectTerms Algorithms
Applied sciences
Computer science; control theory; systems
Decision theory. Utility theory
Evolutionary algorithms
Exact sciences and technology
Expert systems
Inventory control, production control. Distribution
Multi-objective evolutionary algorithm
Multi-objective hybrid algorithm
Multi-objective project scheduling
Multi-objective simulated annealing algorithm
Non-dominated solutions
Operational research and scientific management
Operational research. Management science
Optimization
Scheduling
Scheduling, sequencing
Searching
Simulated annealing
Software
Software engineering
Tradeoffs
Title Hybridizing a multi-objective simulated annealing algorithm with a multi-objective evolutionary algorithm to solve a multi-objective project scheduling problem
URI https://dx.doi.org/10.1016/j.eswa.2012.10.058
https://www.proquest.com/docview/1448728779
https://www.proquest.com/docview/1701089863
Volume 40
WOSCitedRecordID wos000315616500007&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVESC
  databaseName: Elsevier SD Freedom Collection Journals 2021
  customDbUrl:
  eissn: 1873-6793
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0017007
  issn: 0957-4174
  databaseCode: AIEXJ
  dateStart: 19950101
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1bi9NAFB5q1wdBvIv1sozgW0lJJpNM8lh0ZRVZBNelbyGZmawpbVrabl39M_4Y_5jnZCZptl2LClIIJZ1pJpxvzjlzroS8UiDimOdrh4tcOdzDPecz5YQqEsLzpI6raMKzD-LkJBqN4o-dzs86F2Y9EWUZXV7G8_9KargHxMbU2b8gd_OncAO-A9HhCmSH6x8R_vgbJmEV36vsQxMw6MyysWFs_WUxxYZdGiu0lqAkVqMm57NFsfoytZluO5P02q4YQ-w2o0FthVeB33dnWANPH87OIMtsynvVuuaKKwDrLK9sNek6z67lUW9YEjZWQg9JFXpwVizOi7Jo5Mlwiqk5JjoznVSe_zdp25pRdZZoWzOaNJtNTJOxVQrAkWnnM9CGU0fCd0Jh2ivWrNxUfrKQFW2-zE0etpXxjBsL6o78MKaM8UAvv2JRKo8NMPTPFJffqsv9CVeFi_JQh4qYuEEOmAjiqEsOhu-ORu8bZ5ZwTdZ-_RY2d8uEGW4_6Xf60e15uoRdm5t2KzuaQ6UOnd4jd-w5hg4N_u6Tji4fkLt1jxBqRcZD8qMFR5rSLZzQBo60gSNtAEYRENdMasOxNXo1oxUcr5lh4Ug3cKQWjo_I57dHp6-PHdsUxJGcuytHKSZDGQuGWdMZ82WU54ErVYwlAXSGVpYM-EzKc-5mCj65zjjPQY0VQvih8h-Tbjkr9RNCPeWlKg9dTyvJRZhlUsk0U4GEI3ie8axHvJoUibQV87FxyySpQyPHCZIvQfLhPSBfj_SbOXNTL2bv6KCmcGI1XqPJJgDIvfMOr8CheRTDYl0sCHrkZY2PBOQFOgHTUs8ulnDU55FgwIjjPWOE67lRHIX-039c4DNya7O7n5PuanGhX5Cbcr0qlotDu0F-AQdn_3c
linkProvider Elsevier
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Hybridizing+a+multi-objective+simulated+annealing+algorithm+with+a+multi-objective+evolutionary+algorithm+to+solve+a+multi-objective+project+scheduling+problem&rft.jtitle=Expert+systems+with+applications&rft.au=Yannibelli%2C+Virginia&rft.au=Amandi%2C+Anal%C3%ADa&rft.date=2013-06-01&rft.pub=Elsevier+Ltd&rft.issn=0957-4174&rft.eissn=1873-6793&rft.volume=40&rft.issue=7&rft.spage=2421&rft.epage=2434&rft_id=info:doi/10.1016%2Fj.eswa.2012.10.058&rft.externalDocID=S0957417412011827
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0957-4174&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0957-4174&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0957-4174&client=summon