Citace podle APA (7th ed.)

Sebt, M. H., Afshar, M. R., & Alipouri, Y. (2017). Hybridization of genetic algorithm and fully informed particle swarm for solving the multi-mode resource-constrained project scheduling problem. Engineering optimization, 49(3), 513-530. https://doi.org/10.1080/0305215X.2016.1197610

Citace podle Chicago (17th ed.)

Sebt, M. H., M. R. Afshar, a Y. Alipouri. "Hybridization of Genetic Algorithm and Fully Informed Particle Swarm for Solving the Multi-mode Resource-constrained Project Scheduling Problem." Engineering Optimization 49, no. 3 (2017): 513-530. https://doi.org/10.1080/0305215X.2016.1197610.

Citace podle MLA (9th ed.)

Sebt, M. H., et al. "Hybridization of Genetic Algorithm and Fully Informed Particle Swarm for Solving the Multi-mode Resource-constrained Project Scheduling Problem." Engineering Optimization, vol. 49, no. 3, 2017, pp. 513-530, https://doi.org/10.1080/0305215X.2016.1197610.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..