APA (7th ed.) Citation

van der Beek, T., van Essen, J., Pruyn, J., & Aardal, K. (2025). Exact solution methods for the Resource Constrained Project Scheduling Problem with a flexible Project Structure. European journal of operational research, 322(1), 56-69. https://doi.org/10.1016/j.ejor.2024.10.029

Chicago Style (17th ed.) Citation

van der Beek, T., J.T van Essen, J. Pruyn, and K. Aardal. "Exact Solution Methods for the Resource Constrained Project Scheduling Problem with a Flexible Project Structure." European Journal of Operational Research 322, no. 1 (2025): 56-69. https://doi.org/10.1016/j.ejor.2024.10.029.

MLA (9th ed.) Citation

van der Beek, T., et al. "Exact Solution Methods for the Resource Constrained Project Scheduling Problem with a Flexible Project Structure." European Journal of Operational Research, vol. 322, no. 1, 2025, pp. 56-69, https://doi.org/10.1016/j.ejor.2024.10.029.

Warning: These citations may not always be 100% accurate.