Varadharajan, T., & Rajendran, C. (2005). A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs. European journal of operational research, 167(3), 772-795. https://doi.org/10.1016/j.ejor.2004.07.020
Citácia podle Chicago (17th ed.)Varadharajan, T.K, a Chandrasekharan Rajendran. "A Multi-objective Simulated-annealing Algorithm for Scheduling in Flowshops to Minimize the Makespan and Total Flowtime of Jobs." European Journal of Operational Research 167, no. 3 (2005): 772-795. https://doi.org/10.1016/j.ejor.2004.07.020.
Citácia podľa MLA (8th ed.)Varadharajan, T.K, a Chandrasekharan Rajendran. "A Multi-objective Simulated-annealing Algorithm for Scheduling in Flowshops to Minimize the Makespan and Total Flowtime of Jobs." European Journal of Operational Research, vol. 167, no. 3, 2005, pp. 772-795, https://doi.org/10.1016/j.ejor.2004.07.020.