Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm

Cluster tools, each of which consists of multiple processing modules, one material handling robot, and loadlocks, are widely used for wafer fabrication processes, such as lithography, etching, and deposition. There have been many approaches and algorithms for cyclic scheduling of cluster tools in wh...

Full description

Saved in:
Bibliographic Details
Published in:IEEE transactions on automation science and engineering Vol. 12; no. 2; pp. 690 - 700
Main Authors: Kim, Hyun-Jung, Lee, Jun-Ho, Lee, Tae-Eog
Format: Journal Article
Language:English
Published: New York IEEE 01.04.2015
The Institute of Electrical and Electronics Engineers, Inc. (IEEE)
Subjects:
ISSN:1545-5955, 1558-3783
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Abstract Cluster tools, each of which consists of multiple processing modules, one material handling robot, and loadlocks, are widely used for wafer fabrication processes, such as lithography, etching, and deposition. There have been many approaches and algorithms for cyclic scheduling of cluster tools in which the robot repeats a specified sequence for processing identical wafers. However, the lot order size has recently been decreasing due to the larger wafer size and circuit width reductions. In modern fabs, each wafer lot can have different flow patterns and process times for the same process step, and heterogeneous lots are processed consecutively in a tool. Even some tools in a fab have idle time waiting for wafer lots depending on the work-in-process fluctuations. Such different wafer lots and frequent tool state changes cannot be handled with cyclic scheduling methods, and accordingly noncyclic scheduling methods for such cases are required. Therefore, we develop an efficient branch and bound (B&B) procedure for noncyclic scheduling problems of cluster tools to minimize the makespan. Since a timed Petri net (TPN) is known for its powerful modeling ability and analysis capability, the algorithm is developed based on a TPN. We verify the efficiency of the B&B procedure with various cluster tool scheduling problems. There have been many studies on scheduling cluster tools, but most of them utilize different scheduling approaches or develop problem specialized properties. It is impractical to implement all the different methods to a tool scheduler because the scheduling requirements continuously change depending on wafer types and tool architectures. Hence, it is required to have an efficient solution method to address diverse cluster tool scheduling problems in fabs especially for frequent lot switchings and tool state changes due to larger wafer size and smaller lot order size. Therefore, we develop an efficient branch and bound procedure for noncyclic scheduling of a cluster tool with the makespan measurement. Since TPNs have the powerful modeling ability and analysis capability, the algorithm is developed based on a TPN. From the experimental results, we observe that one lot with 25 wafers can be easily solved in a reasonable time. The proposed method can be used for many different scheduling problems of a cluster tool by generating each corresponding TPN model.
AbstractList Cluster tools, each of which consists of multiple processing modules, one material handling robot, and loadlocks, are widely used for wafer fabrication processes, such as lithography, etching, and deposition. There have been many approaches and algorithms for cyclic scheduling of cluster tools in which the robot repeats a specified sequence for processing identical wafers. However, the lot order size has recently been decreasing due to the larger wafer size and circuit width reductions. In modern fabs, each wafer lot can have different flow patterns and process times for the same process step, and heterogeneous lots are processed consecutively in a tool. Even some tools in a fab have idle time waiting for wafer lots depending on the work-in-process fluctuations. Such different wafer lots and frequent tool state changes cannot be handled with cyclic scheduling methods, and accordingly noncyclic scheduling methods for such cases are required. Therefore, we develop an efficient branch and bound (B&B) procedure for noncyclic scheduling problems of cluster tools to minimize the makespan. Since a timed Petri net (TPN) is known for its powerful modeling ability and analysis capability, the algorithm is developed based on a TPN. We verify the efficiency of the B&B procedure with various cluster tool scheduling problems. There have been many studies on scheduling cluster tools, but most of them utilize different scheduling approaches or develop problem specialized properties. It is impractical to implement all the different methods to a tool scheduler because the scheduling requirements continuously change depending on wafer types and tool architectures. Hence, it is required to have an efficient solution method to address diverse cluster tool scheduling problems in fabs especially for frequent lot switchings and tool state changes due to larger wafer size and smaller lot order size. Therefore, we develop an efficient branch and bound procedure for noncyclic scheduling of a cluster tool with the makespan measurement. Since TPNs have the powerful modeling ability and analysis capability, the algorithm is developed based on a TPN. From the experimental results, we observe that one lot with 25 wafers can be easily solved in a reasonable time. The proposed method can be used for many different scheduling problems of a cluster tool by generating each corresponding TPN model.
Cluster tools, each of which consists of multiple processing modules, one material handling robot, and loadlocks, are widely used for wafer fabrication processes, such as lithography, etching, and deposition. There have been many approaches and algorithms for cyclic scheduling of cluster tools in which the robot repeats a specified sequence for processing identical wafers. However, the lot order size has recently been decreasing due to the larger wafer size and circuit width reductions. In modern fabs, each wafer lot can have different flow patterns and process times for the same process step, and heterogeneous lots are processed consecutively in a tool. Even some tools in a fab have idle time waiting for wafer lots depending on the work-in-process fluctuations. Such different wafer lots and frequent tool state changes cannot be handled with cyclic scheduling methods, and accordingly noncyclic scheduling methods for such cases are required. Therefore, we develop an efficient branch and bound (B&B) procedure for noncyclic scheduling problems of cluster tools to minimize the makespan. Since a timed Petri net (TPN) is known for its powerful modeling ability and analysis capability, the algorithm is developed based on a TPN. We verify the efficiency of the B&B procedure with various cluster tool scheduling problems.
Author Tae-Eog Lee
Jun-Ho Lee
Hyun-Jung Kim
Author_xml – sequence: 1
  givenname: Hyun-Jung
  surname: Kim
  fullname: Kim, Hyun-Jung
– sequence: 2
  givenname: Jun-Ho
  surname: Lee
  fullname: Lee, Jun-Ho
– sequence: 3
  givenname: Tae-Eog
  surname: Lee
  fullname: Lee, Tae-Eog
BookMark eNp9kE9PAjEQxRuDiYB-AOOliefF_t12j0AUTYgewHhsSreFkqXF7u6Bb-9uIB48eJl5ybzfTOaNwCDEYAG4x2iCMSqe1tPV84QgTCeEFJRzcgWGmHOZUSHpoNeMZ7zg_AaM6nqPEGGyQEOweI_BnEzlDVyZnS3byoctjA7Oq7ZubILrGKsafvlmBzWcJR1MJ0IJZ7Ht6rTaxtTNDrfg2umqtneXPgafL8_r-Wu2_Fi8zafLzDBKm6zg0pFN4XiJsdg4lGOjtcy1KCV1yFiZ4w0riBTGMW2owawsqSXECMqsM5aOweN57zHF79bWjdrHNoXupMK5YExwjHnnEmeXSbGuk3XK-EY3PoYmaV8pjFSfmupTU31q6pJaR-I_5DH5g06nf5mHM-Ottb_-PO_-kIT-AOomeY8
CODEN ITASC7
CitedBy_id crossref_primary_10_1109_TASE_2020_3014078
crossref_primary_10_1109_TASE_2023_3296087
crossref_primary_10_1109_TASE_2023_3275703
crossref_primary_10_1109_TASE_2016_2531105
crossref_primary_10_1109_TSM_2018_2811125
crossref_primary_10_1109_TASE_2015_2443107
crossref_primary_10_1109_TSM_2015_2390644
crossref_primary_10_1109_TASE_2017_2764105
crossref_primary_10_1109_TASE_2015_2478482
crossref_primary_10_1109_TASE_2020_3002560
crossref_primary_10_1109_TCST_2016_2598762
crossref_primary_10_1109_TASE_2024_3399818
crossref_primary_10_1109_TSM_2017_2721970
crossref_primary_10_3390_pr5040083
crossref_primary_10_1016_j_jmsy_2024_09_018
crossref_primary_10_1177_1687814016646503
crossref_primary_10_1109_TSM_2016_2530810
crossref_primary_10_1109_TSM_2015_2415523
crossref_primary_10_1109_LRA_2024_3396112
crossref_primary_10_1016_j_ifacol_2017_08_391
crossref_primary_10_1109_TASE_2020_3047924
crossref_primary_10_1109_TASE_2018_2874664
crossref_primary_10_1080_00207543_2015_1035813
crossref_primary_10_1109_ACCESS_2020_2988274
crossref_primary_10_1109_TASE_2017_2682271
crossref_primary_10_1109_TASE_2022_3203408
crossref_primary_10_1080_00207543_2021_1887533
crossref_primary_10_1109_TASE_2018_2878063
crossref_primary_10_1007_s10479_018_3098_2
crossref_primary_10_1080_00207543_2018_1553314
crossref_primary_10_1109_TASE_2014_2313979
crossref_primary_10_1109_TASE_2017_2690443
crossref_primary_10_1109_TSMC_2016_2598303
crossref_primary_10_1016_j_ifacol_2018_06_309
crossref_primary_10_1109_TSMC_2022_3222915
crossref_primary_10_1109_TASE_2017_2771751
crossref_primary_10_1109_TCST_2019_2902329
crossref_primary_10_1109_TSMC_2020_2964032
crossref_primary_10_1109_TSMC_2018_2852724
crossref_primary_10_1177_1687814017693217
crossref_primary_10_1109_TASE_2019_2930046
crossref_primary_10_1109_TASE_2022_3188858
crossref_primary_10_1109_TASE_2020_3009984
crossref_primary_10_1109_TASE_2016_2642997
crossref_primary_10_1109_ACCESS_2021_3077503
crossref_primary_10_1109_TASE_2025_3562191
crossref_primary_10_1109_TSM_2017_2759063
crossref_primary_10_1109_TSM_2022_3166908
crossref_primary_10_1109_TSM_2019_2910399
crossref_primary_10_1109_TASE_2021_3122576
crossref_primary_10_1109_TASE_2018_2868004
crossref_primary_10_1109_TSMC_2015_2507140
crossref_primary_10_1109_TASE_2020_3029737
crossref_primary_10_1016_j_jmsy_2023_02_002
crossref_primary_10_1109_TSM_2020_2998734
crossref_primary_10_1109_LRA_2025_3546072
crossref_primary_10_3233_JIFS_18096
crossref_primary_10_1109_TSMC_2023_3317390
crossref_primary_10_1109_TSMC_2016_2600583
crossref_primary_10_1080_00207543_2016_1243819
crossref_primary_10_1080_02533839_2018_1516515
crossref_primary_10_1109_TASE_2018_2815157
crossref_primary_10_1109_TSMC_2017_2721979
crossref_primary_10_1109_TASE_2015_2503325
crossref_primary_10_1109_TSMC_2019_2899590
crossref_primary_10_1016_j_eswa_2024_124471
Cites_doi 10.1109/TSMCA.2012.2187890
10.1109/41.334574
10.1109/70.63257
10.1109/TASE.2013.2285221
10.1109/TSM.2011.2180547
10.1142/3376
10.1109/TSM.2006.879414
10.1109/TASE.2011.2178023
10.1109/TSM.2009.2039243
10.1287/mnsc.17.12.B782
10.1109/70.964658
10.1080/00207543.2011.590949
10.1109/TASE.2010.2046891
10.1109/66.705370
10.1016/0005-1098(94)90024-8
10.1109/TASE.2005.851236
10.1109/TSM.2003.815203
10.1109/TASE.2012.2192476
10.1109/TSM.2008.2000425
10.1109/TASE.2012.2217128
10.1080/00207540802552659
10.1287/mnsc.35.2.164
10.1109/TASE.2010.2046893
10.1016/j.ejor.2004.09.019
10.1109/5.24143
10.1109/70.988976
10.1007/3-540-56689-9_43
10.1109/TASE.2010.2046736
10.1109/70.964662
10.1109/TSM.2012.2199338
10.1109/TASE.2013.2255037
10.1109/TASE.2009.2039567
10.1016/S0377-2217(82)80007-6
10.1109/TSM.2012.2199329
10.1109/5326.760564
10.1109/TASE.2007.912716
10.1109/TSM.2006.873402
10.1080/00207543.2013.765071
10.1080/00207543.2012.758392
10.1109/70.282537
10.1109/TASE.2008.2008633
10.1109/TSM.2012.2222945
10.1109/TASE.2011.2160452
10.1109/TASE.2012.2220355
10.1109/TSMCB.2011.2170678
ContentType Journal Article
Copyright Copyright The Institute of Electrical and Electronics Engineers, Inc. (IEEE) Apr 2015
Copyright_xml – notice: Copyright The Institute of Electrical and Electronics Engineers, Inc. (IEEE) Apr 2015
DBID 97E
RIA
RIE
AAYXX
CITATION
7SC
7SP
7TB
8FD
FR3
JQ2
L7M
L~C
L~D
DOI 10.1109/TASE.2013.2293552
DatabaseName IEEE All-Society Periodicals Package (ASPP) 2005–Present
IEEE All-Society Periodicals Package (ASPP) 1998–Present
IEEE/IET Electronic Library (IEL) (UW System Shared)
CrossRef
Computer and Information Systems Abstracts
Electronics & Communications Abstracts
Mechanical & Transportation Engineering Abstracts
Technology Research Database
Engineering Research Database
ProQuest Computer Science Collection
Advanced Technologies Database with Aerospace
Computer and Information Systems Abstracts – Academic
Computer and Information Systems Abstracts Professional
DatabaseTitle CrossRef
Technology Research Database
Computer and Information Systems Abstracts – Academic
Mechanical & Transportation Engineering Abstracts
Electronics & Communications Abstracts
ProQuest Computer Science Collection
Computer and Information Systems Abstracts
Engineering Research Database
Advanced Technologies Database with Aerospace
Computer and Information Systems Abstracts Professional
DatabaseTitleList
Technology Research Database
Database_xml – sequence: 1
  dbid: RIE
  name: IEEE Electronic Library (IEL)
  url: https://ieeexplore.ieee.org/
  sourceTypes: Publisher
DeliveryMethod fulltext_linktorsrc
Discipline Engineering
EISSN 1558-3783
EndPage 700
ExternalDocumentID 3660532591
10_1109_TASE_2013_2293552
6692882
Genre orig-research
GrantInformation_xml – fundername: Basic Science Research Program through the National Research Foundation of Korea
GroupedDBID -~X
0R~
29I
4.4
5GY
5VS
6IK
97E
AAJGR
AARMG
AASAJ
AAWTH
ABAZT
ABQJQ
ABVLG
ACGFO
ACGFS
ACIWK
AENEX
AETIX
AGQYO
AGSQL
AHBIQ
AIBXA
AKJIK
AKQYR
ALMA_UNASSIGNED_HOLDINGS
ATWAV
BEFXN
BFFAM
BGNUA
BKEBE
BPEOZ
CS3
DU5
EBS
EJD
F5P
HZ~
H~9
IFIPE
IPLJI
JAVBF
LAI
M43
O9-
OCL
PQQKQ
RIA
RIE
RNS
AAYXX
CITATION
7SC
7SP
7TB
8FD
FR3
JQ2
L7M
L~C
L~D
ID FETCH-LOGICAL-c433t-958f2b9f5d117bf061caa86a7d83f0ce861b49287cf4ac3c14dd3e22c734efce3
IEDL.DBID RIE
ISICitedReferencesCount 86
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000352502300028&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 1545-5955
IngestDate Sun Sep 07 03:36:24 EDT 2025
Sat Nov 29 04:12:44 EST 2025
Tue Nov 18 21:59:15 EST 2025
Tue Aug 26 16:40:59 EDT 2025
IsPeerReviewed false
IsScholarly true
Issue 2
Language English
License https://ieeexplore.ieee.org/Xplorehelp/downloads/license-information/IEEE.html
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c433t-958f2b9f5d117bf061caa86a7d83f0ce861b49287cf4ac3c14dd3e22c734efce3
Notes ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
PQID 1674475115
PQPubID 27623
PageCount 11
ParticipantIDs crossref_citationtrail_10_1109_TASE_2013_2293552
proquest_journals_1674475115
crossref_primary_10_1109_TASE_2013_2293552
ieee_primary_6692882
PublicationCentury 2000
PublicationDate 2015-04-01
PublicationDateYYYYMMDD 2015-04-01
PublicationDate_xml – month: 04
  year: 2015
  text: 2015-04-01
  day: 01
PublicationDecade 2010
PublicationPlace New York
PublicationPlace_xml – name: New York
PublicationTitle IEEE transactions on automation science and engineering
PublicationTitleAbbrev TASE
PublicationYear 2015
Publisher IEEE
The Institute of Electrical and Electronics Engineers, Inc. (IEEE)
Publisher_xml – name: IEEE
– name: The Institute of Electrical and Electronics Engineers, Inc. (IEEE)
References ref13
ref12
ref15
ref14
ref11
ref10
ref17
ref16
ref19
wang (ref41) 1998
billington (ref52) 2003; 2679
wu (ref18) 2013; 43
ref51
ref50
ref48
ref47
ref42
ref44
zhou (ref30) 1995
ref49
ref8
ref7
ref9
ref4
ref3
wu (ref45) 1999; 29
ref5
ref40
chan (ref24) 2004
ref35
ref34
ref37
ref36
ref33
lee (ref31) 1994; 10
ref2
ref1
ref39
ref38
paek (ref23) 2008
wu (ref6) 2010; 7
fehling (ref46) 1993; 674
ref26
ref25
ref20
ref22
ref21
divid (ref43) 1994; 30
ref28
ref27
ref29
kim (ref32) 2012
References_xml – volume: 43
  start-page: 1182
  year: 2013
  ident: ref18
  article-title: A Petri-net-based scheduling strategy for dual-arm cluster tools with wafer revisiting
  publication-title: IEEE Trans Syst Man Cybern Syst
  doi: 10.1109/TSMCA.2012.2187890
– ident: ref44
  doi: 10.1109/41.334574
– ident: ref34
  doi: 10.1109/70.63257
– ident: ref22
  doi: 10.1109/TASE.2013.2285221
– ident: ref21
  doi: 10.1109/TSM.2011.2180547
– ident: ref2
  doi: 10.1142/3376
– ident: ref39
  doi: 10.1109/TSM.2006.879414
– start-page: 103
  year: 2008
  ident: ref23
  article-title: Optimal scheduling of dual-armed cluster tools without swap restriction
  publication-title: Proc IEEE Int Conf Autom Sci Eng
– ident: ref7
  doi: 10.1109/TASE.2011.2178023
– ident: ref8
  doi: 10.1109/TSM.2009.2039243
– ident: ref48
  doi: 10.1287/mnsc.17.12.B782
– ident: ref28
  doi: 10.1109/70.964658
– ident: ref29
  doi: 10.1080/00207543.2011.590949
– ident: ref37
  doi: 10.1109/TASE.2010.2046891
– ident: ref1
  doi: 10.1109/66.705370
– volume: 30
  start-page: 175
  year: 1994
  ident: ref43
  article-title: Petri nets for modeling of dynamic systems?A survey
  publication-title: Automatica
  doi: 10.1016/0005-1098(94)90024-8
– ident: ref11
  doi: 10.1109/TASE.2005.851236
– ident: ref12
  doi: 10.1109/TSM.2003.815203
– ident: ref10
  doi: 10.1109/TASE.2012.2192476
– ident: ref5
  doi: 10.1109/TSM.2008.2000425
– ident: ref27
  doi: 10.1109/TASE.2012.2217128
– start-page: 568
  year: 2004
  ident: ref24
  article-title: Generating scheduling constraints for discrete event dynamic systems
  publication-title: Proc Winter Simulation Conf
– ident: ref36
  doi: 10.1080/00207540802552659
– ident: ref50
  doi: 10.1287/mnsc.35.2.164
– ident: ref38
  doi: 10.1109/TASE.2010.2046893
– ident: ref47
  doi: 10.1016/j.ejor.2004.09.019
– ident: ref42
  doi: 10.1109/5.24143
– ident: ref35
  doi: 10.1109/70.988976
– volume: 674
  start-page: 148
  year: 1993
  ident: ref46
  article-title: A concept of hierarchical Petri nets with building blocks
  publication-title: Advances in Petri Nets Lecture Notes in Computer Science
  doi: 10.1007/3-540-56689-9_43
– ident: ref19
  doi: 10.1109/TASE.2010.2046736
– ident: ref15
  doi: 10.1109/70.964662
– start-page: 1779
  year: 2012
  ident: ref32
  article-title: Petri net-based non-cyclic scheduling with a branch and bound algorithm
  publication-title: Proc IEEE Int Conf Syst Man Cybern
– ident: ref9
  doi: 10.1109/TSM.2012.2199338
– ident: ref25
  doi: 10.1109/TASE.2013.2255037
– ident: ref40
  doi: 10.1109/TASE.2009.2039567
– ident: ref49
  doi: 10.1016/S0377-2217(82)80007-6
– ident: ref3
  doi: 10.1109/TSM.2012.2199329
– volume: 29
  start-page: 192
  year: 1999
  ident: ref45
  article-title: Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model
  publication-title: IEEE Trans Syst Man Cybern Part C Appl Rev
  doi: 10.1109/5326.760564
– ident: ref13
  doi: 10.1109/TASE.2007.912716
– start-page: 9
  year: 1998
  ident: ref41
  publication-title: Timed Petri Nets Theory and Application
– ident: ref20
  doi: 10.1109/TSM.2006.873402
– ident: ref16
  doi: 10.1109/TSMCA.2012.2187890
– ident: ref51
  doi: 10.1080/00207543.2013.765071
– ident: ref4
  doi: 10.1080/00207543.2012.758392
– volume: 10
  start-page: 123
  year: 1994
  ident: ref31
  article-title: Scheduling flexible manufacturing systems using Petri nets and heuristic search
  publication-title: IEEE Trans Robot Autom
  doi: 10.1109/70.282537
– volume: 2679
  start-page: 483
  year: 2003
  ident: ref52
  article-title: The Petri net markup language: Concepts, technology, and tools
  publication-title: Application and Theory of Petri-Nets
– volume: 7
  start-page: 303
  year: 2010
  ident: ref6
  article-title: A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis
  publication-title: IEEE Trans Autom Sci Eng
  doi: 10.1109/TASE.2008.2008633
– ident: ref17
  doi: 10.1109/TSM.2012.2222945
– ident: ref14
  doi: 10.1109/TASE.2011.2160452
– ident: ref26
  doi: 10.1109/TASE.2012.2220355
– ident: ref33
  doi: 10.1109/TSMCB.2011.2170678
– start-page: 211
  year: 1995
  ident: ref30
  article-title: Petri net scheduling of FMS using branch and bound method
  publication-title: Proc IEEE Int Conf Ind Electron Control Instrum
SSID ssj0024890
Score 2.3741574
Snippet Cluster tools, each of which consists of multiple processing modules, one material handling robot, and loadlocks, are widely used for wafer fabrication...
SourceID proquest
crossref
ieee
SourceType Aggregation Database
Enrichment Source
Index Database
Publisher
StartPage 690
SubjectTerms Algorithms
Analysis
Branch and bound (B&B) algorithm
cluster tool
Clustering algorithms
Efficiency
Etching
Job shop scheduling
noncyclic scheduling
Offset printing
Optimal scheduling
Petri net
Robots
Semiconductor device modeling
Time factors
Title Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm
URI https://ieeexplore.ieee.org/document/6692882
https://www.proquest.com/docview/1674475115
Volume 12
WOSCitedRecordID wos000352502300028&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVIEE
  databaseName: IEEE Electronic Library (IEL)
  customDbUrl:
  eissn: 1558-3783
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0024890
  issn: 1545-5955
  databaseCode: RIE
  dateStart: 20040101
  isFulltext: true
  titleUrlDefault: https://ieeexplore.ieee.org/
  providerName: IEEE
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwlV1LSwMxEB60eNCDb7G-yMGTuHY32WyyxyqtHqQIVuxt2cwmWli70oe_3yRdq6II3gJ5EL5JMpNk5huA0whjZe-yKghZagIXehnkXOkgMiKUAilq6QOFb0WvJweD9G4JzhexMFpr73ymL1zR_-UXFc7cU1krSVJqLcJlWBYimcdqffLqSf-e4iyCgKec1z-YUZi2-u37jnPiYheUOjpx-k0H-aQqP05ir166G_-b2Cas12Ykac_lvgVLerQNa1_IBXfgulfZgxPLIZJ7K5nCuZw_kcqQq3Lm2BFIv6rKCXkcTp9JTi5dgg1bGBXk0mVaIu3yqRrbupddeOh2-lc3QZ02IcCYsWmQcmmoSg0vokgoYxU25rlMclFIZkILfhKp2M5XoIlzZBjFRcE0pShYrA1qtgeNUTXS-0CoDLny_D6JiZFqVSiaKGb3tEYlc92E8APIDGtOcZfaosz83SJMM4d95rDPauybcLbo8jon1Pir8Y4De9GwxrkJRx_SyuotN8lcOEUsrP3ID37vdQirdmw-d7s5gsZ0PNPHsIJv0-FkfOJX0ztfV8at
linkProvider IEEE
linkToHtml http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwlV1LS8QwEB58gXrwLa6umoMnsdomTZseV1FXXBfBFb2VZproQt3KPvz9Jtm6KorgLdCEhm_ymCQz3wdwEGAozVlWej5LtGdTL72MS-UFOvZFjBSVcInCrbjdFo-Pye0UHE1yYZRSLvhMHduie8vPSxzZq7KTKEqo8QinYdYqZ_FxttYns55wNyrWJ_B4wnn1hhn4yUmncXduw7jYMaWWUJx-24WcrMqPtdhtMBfL_-vaCixVjiRpjC2_ClOqtwaLX-gF1-GyXZqlE4sukjtjm9wGnT-RUpOzYmT5EUinLIsBeegOn0lGTq3Ehin0cnJqtZZIo3gq--bbywbcX5x3zppeJZzgYcjY0Eu40FQmmudBEEtttmzMMhFlcS6Y9g38USBD098YdZghwyDMc6YoxZiFSqNimzDTK3tqCwgVPpeO4SfSIVIlc0kjycysVihFpmrgfwCZYsUqbsUtitSdLvwktdinFvu0wr4Gh5Mmr2NKjb8qr1uwJxUrnGtQ_7BWWk26QWoTKsLYeJB8-_dW-zDf7Ny00tZV-3oHFsx_-DgIpw4zw_5I7cIcvg27g_6eG1nv6kLJ-A
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Noncyclic+Scheduling+of+Cluster+Tools+With+a+Branch+and+Bound+Algorithm&rft.jtitle=IEEE+transactions+on+automation+science+and+engineering&rft.au=Kim%2C+Hyun-Jung&rft.au=Lee%2C+Jun-Ho&rft.au=Lee%2C+Tae-Eog&rft.date=2015-04-01&rft.issn=1545-5955&rft.eissn=1558-3783&rft.volume=12&rft.issue=2&rft.spage=690&rft.epage=700&rft_id=info:doi/10.1109%2FTASE.2013.2293552&rft.externalDBID=n%2Fa&rft.externalDocID=10_1109_TASE_2013_2293552
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1545-5955&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1545-5955&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1545-5955&client=summon